ITER - TVPS remote handling critical design issues. Final

Abstract

This report describes critical design issues concerning remote maintenance of the ITER Torus Vacuum Pumping System (TVPS). The key issues under investigation are the regeneration/isolation valve seal and seal mechanism replacement; impact of inert gas operation; impact of remote handling (RH) on the building configuration and RH equipment requirements. Seal exchange concepts are developed and their impact on the valve design identified. Concerns regarding the design and operation of RH equipment in an inert gas atmosphere are also explored. The report compares preliminary RH equipment options, pumping equipment maintenance frequency and their impact on the building design, and makes recommendations where a conflict exists between pumping equipment and the building layout. (51 figs., 11 refs.).
Publication Date:
Sep 01, 1990
Product Type:
Technical Report
Report Number:
CFFTP-G-9061; WARDROP-90-8004-05-00.
Reference Number:
SCA: 700460; PA: AIX-24:009441; SN: 93000933826
Resource Relation:
Other Information: PBD: Sep 1990
Subject:
70 PLASMA PHYSICS AND FUSION TECHNOLOGY; ITER TOKAMAK; VACUUM SYSTEMS; MAINTENANCE; INERT ATMOSPHERE; REMOTE HANDLING; SEALS; SPECIFICATIONS; 700460; HEATING AND FUELING SYSTEMS; FUELS
OSTI ID:
10123994
Research Organizations:
Canadian Fusion Fuels Technology Project, Toronto, ON (Canada); Wardrop (W.L.) and Associates Ltd., Winnipeg, MB (Canada)
Country of Origin:
Canada
Language:
English
Other Identifying Numbers:
Other: ON: DE93613807; TRN: CA9200976009441
Availability:
OSTI; NTIS (US Sales Only); INIS
Submitting Site:
INIS
Size:
[106] p.
Announcement Date:
Jul 04, 2005

Citation Formats

None. ITER - TVPS remote handling critical design issues. Final. Canada: N. p., 1990. Web.
None. ITER - TVPS remote handling critical design issues. Final. Canada.
None. 1990. "ITER - TVPS remote handling critical design issues. Final." Canada.
@misc{etde_10123994,
title = {ITER - TVPS remote handling critical design issues. Final}
author = {None}
abstractNote = {This report describes critical design issues concerning remote maintenance of the ITER Torus Vacuum Pumping System (TVPS). The key issues under investigation are the regeneration/isolation valve seal and seal mechanism replacement; impact of inert gas operation; impact of remote handling (RH) on the building configuration and RH equipment requirements. Seal exchange concepts are developed and their impact on the valve design identified. Concerns regarding the design and operation of RH equipment in an inert gas atmosphere are also explored. The report compares preliminary RH equipment options, pumping equipment maintenance frequency and their impact on the building design, and makes recommendations where a conflict exists between pumping equipment and the building layout. (51 figs., 11 refs.).}
place = {Canada}
year = {1990}
month = {Sep}
}