A model of the environmental impacts of hydropower projects. Prestudy; Vesivoimahankkeiden ympaeristoevaikutusten tarkastelumalli. Esitutkimus

Abstract

The aim was to create a model of the effects of hydropower modernization and extension projects in Finland. To illustrate the effects of hydropower projects a checklist in the form of matrice was constructed. In this matrice all issues that could be significant in future hydropower projects were collected. Stable physical environmental changes are the starting-point for this matrice. The temporary change of hydropower constructions have also been under consideration. These are mainly environmental changes during construction. In chapter two the effects of hydropower modernization and extension projects physical environmental changes were examined. In chapter three the matrice was applied to some example cases. The cases were chosen to represent future hydropower projects. In addition these example cases represent urban areas, rural areas and uninhabited areas. The example cases were the extension of Tainionkoski hydropower plant at Vuoksi river, the modernization of Aeetsae power plant at Kokemaeenjoki river, the modernization of Stadsfors power plant at Lapuanjoki river in the centre of Uusikaarlepyy town and the construction of Kaitfors power plant at Perhonjoki river. Conclusions from usability of the model can be drawn on the ground of the example cases. The purpose of the model is to produce a checklist of  More>>
Publication Date:
Dec 31, 1992
Product Type:
Technical Report
Report Number:
KTM/E-B-117
Reference Number:
SCA: 130600; PA: FI-93:003006; SN: 93000928512
Resource Relation:
Other Information: PBD: 1992
Subject:
13 HYDRO ENERGY; HYDROELECTRIC POWER; ENVIRONMENTAL IMPACTS; HYDROELECTRIC POWER PLANTS; MATRICES; RIVERS; WATER TABLES; FLOW RATE; SOCIO-ECONOMIC FACTORS; ENERGY CONSUMPTION; ECOLOGY; 130600; ENVIRONMENTAL ASPECTS
OSTI ID:
10121171
Research Organizations:
Ministry of Trade and Industry, Helsinki (Finland). Energy Dept.
Country of Origin:
Finland
Language:
Finnish
Other Identifying Numbers:
Other: ON: DE93761292; ISBN 951-47-5904-4; TRN: FI9303006
Availability:
OSTI; NTIS; INIS
Submitting Site:
FI
Size:
62 p.
Announcement Date:
Jun 30, 2005

Citation Formats

Kemppainen, T, and Haemaelaeinen, I. A model of the environmental impacts of hydropower projects. Prestudy; Vesivoimahankkeiden ympaeristoevaikutusten tarkastelumalli. Esitutkimus. Finland: N. p., 1992. Web.
Kemppainen, T, & Haemaelaeinen, I. A model of the environmental impacts of hydropower projects. Prestudy; Vesivoimahankkeiden ympaeristoevaikutusten tarkastelumalli. Esitutkimus. Finland.
Kemppainen, T, and Haemaelaeinen, I. 1992. "A model of the environmental impacts of hydropower projects. Prestudy; Vesivoimahankkeiden ympaeristoevaikutusten tarkastelumalli. Esitutkimus." Finland.
@misc{etde_10121171,
title = {A model of the environmental impacts of hydropower projects. Prestudy; Vesivoimahankkeiden ympaeristoevaikutusten tarkastelumalli. Esitutkimus}
author = {Kemppainen, T, and Haemaelaeinen, I}
abstractNote = {The aim was to create a model of the effects of hydropower modernization and extension projects in Finland. To illustrate the effects of hydropower projects a checklist in the form of matrice was constructed. In this matrice all issues that could be significant in future hydropower projects were collected. Stable physical environmental changes are the starting-point for this matrice. The temporary change of hydropower constructions have also been under consideration. These are mainly environmental changes during construction. In chapter two the effects of hydropower modernization and extension projects physical environmental changes were examined. In chapter three the matrice was applied to some example cases. The cases were chosen to represent future hydropower projects. In addition these example cases represent urban areas, rural areas and uninhabited areas. The example cases were the extension of Tainionkoski hydropower plant at Vuoksi river, the modernization of Aeetsae power plant at Kokemaeenjoki river, the modernization of Stadsfors power plant at Lapuanjoki river in the centre of Uusikaarlepyy town and the construction of Kaitfors power plant at Perhonjoki river. Conclusions from usability of the model can be drawn on the ground of the example cases. The purpose of the model is to produce a checklist of estimated environmental effects in hydropower project of various kinds. Examination of issues within the model depends on local circumstances. Endangered animal and plant species, for example, can be studied and estimated only if endangered animal and plant species exist in the area of hydropower plant. Furthermore, the direction and extent of environmental effects depend on the local circumstances. The model is mainly a checklist of environmental effects caused by hydropower plant projects.}
place = {Finland}
year = {1992}
month = {Dec}
}