Abstract
The Prototype Repository project is focused on testing and demonstrating the function of the SKB deep repository system. The third tracer dilution campaign during the Prototype Repository operation period was performed in January 2010. The purpose was to estimate the groundwater flows and hydraulic gradients in the boreholes vicinity and will function as a reference for comparison with results from modeling and prior assumptions. The test campaign consisted of tracer dilution tests in 13 different borehole sections. Each test consisted of approximately 15-55 min tracer injection time and about 1-3 days dilution test time depending on the transmissivity of the test section. The data interpretation also included estimates of the local hydraulic gradients in the vicinity of the borehole sections
Citation Formats
Harrstroem, Johan, and Andersson, Peter.
Prototype Repository. Tracer dilution tests during operation phase, test campaign 3.
Sweden: N. p.,
2010.
Web.
Harrstroem, Johan, & Andersson, Peter.
Prototype Repository. Tracer dilution tests during operation phase, test campaign 3.
Sweden.
Harrstroem, Johan, and Andersson, Peter.
2010.
"Prototype Repository. Tracer dilution tests during operation phase, test campaign 3."
Sweden.
@misc{etde_1011595,
title = {Prototype Repository. Tracer dilution tests during operation phase, test campaign 3}
author = {Harrstroem, Johan, and Andersson, Peter}
abstractNote = {The Prototype Repository project is focused on testing and demonstrating the function of the SKB deep repository system. The third tracer dilution campaign during the Prototype Repository operation period was performed in January 2010. The purpose was to estimate the groundwater flows and hydraulic gradients in the boreholes vicinity and will function as a reference for comparison with results from modeling and prior assumptions. The test campaign consisted of tracer dilution tests in 13 different borehole sections. Each test consisted of approximately 15-55 min tracer injection time and about 1-3 days dilution test time depending on the transmissivity of the test section. The data interpretation also included estimates of the local hydraulic gradients in the vicinity of the borehole sections}
place = {Sweden}
year = {2010}
month = {May}
}
title = {Prototype Repository. Tracer dilution tests during operation phase, test campaign 3}
author = {Harrstroem, Johan, and Andersson, Peter}
abstractNote = {The Prototype Repository project is focused on testing and demonstrating the function of the SKB deep repository system. The third tracer dilution campaign during the Prototype Repository operation period was performed in January 2010. The purpose was to estimate the groundwater flows and hydraulic gradients in the boreholes vicinity and will function as a reference for comparison with results from modeling and prior assumptions. The test campaign consisted of tracer dilution tests in 13 different borehole sections. Each test consisted of approximately 15-55 min tracer injection time and about 1-3 days dilution test time depending on the transmissivity of the test section. The data interpretation also included estimates of the local hydraulic gradients in the vicinity of the borehole sections}
place = {Sweden}
year = {2010}
month = {May}
}