SUNSTORE 3. Phase 1. Project design and tender. Final report; SUNSTORE 3. Fase 1. Projektering og udbud. Slutrapport

Abstract

The objective of the project has been to carry out detailed design and tendering for a heat production plant consisting of: - 35.000 m{sub 2} solar thermal collectors, - 60.000 m{sub 3} pit heat storage, - 3 MW{sub heat} heat pump, covering app. 50% of the heat production at Dronninglund district heating plant (Denmark). The final report for the project includes detailed design of the pit heat storage (a further development of a 10.000 m{sub 3} storage implemented in Marstal) and simulation of the total production system in the simulation software TRNSYS. (ln)
Authors:
Soerensen, P A; [1]  Moeller Nielsen, C; [2]  Baunwall, M; [3]  Munkholt, H; [4]  Paaske, B; [5]  Schmidt, T [6] 
  1. PlanEnergi, Skoerping (Denmark)
  2. Dronninglund Fjernvarme, Dronninglund (Denmark)
  3. NIRAS Aalborg (Denmark)
  4. GG-Construction, Aalborg (Denmark)
  5. Teknologisk Institut, AArhus (Denmark)
  6. SOLITES, Stuttgart (Germany)
Publication Date:
Mar 15, 2011
Product Type:
Technical Report
Report Number:
NEI-DK-5508
Resource Relation:
Other Information: EUDP-2008; 25 figs., 11 tabs.
Subject:
14 SOLAR ENERGY; 25 ENERGY STORAGE; DISTRICT HEATING; SOLAR COLLECTORS; HEAT PUMPS; SEASONAL THERMAL ENERGY STORAGE; CENTRAL HEATING PLANTS; PONDS; DESIGN; COST; COMPUTERIZED SIMULATION
OSTI ID:
1011557
Research Organizations:
PlanEnergi, Skoerping (Denmark)
Country of Origin:
Denmark
Language:
Danish
Other Identifying Numbers:
Other: Contract ENS-63011-0178; TRN: DK1101063
Availability:
Also available at http://www.risoe.dtu.dk/rispubl/NEI/NEI-DK-5508.pdf; OSTI as DE01011557
Submitting Site:
DK
Size:
176 p. pages
Announcement Date:
Apr 25, 2011

Citation Formats

Soerensen, P A, Moeller Nielsen, C, Baunwall, M, Munkholt, H, Paaske, B, and Schmidt, T. SUNSTORE 3. Phase 1. Project design and tender. Final report; SUNSTORE 3. Fase 1. Projektering og udbud. Slutrapport. Denmark: N. p., 2011. Web.
Soerensen, P A, Moeller Nielsen, C, Baunwall, M, Munkholt, H, Paaske, B, & Schmidt, T. SUNSTORE 3. Phase 1. Project design and tender. Final report; SUNSTORE 3. Fase 1. Projektering og udbud. Slutrapport. Denmark.
Soerensen, P A, Moeller Nielsen, C, Baunwall, M, Munkholt, H, Paaske, B, and Schmidt, T. 2011. "SUNSTORE 3. Phase 1. Project design and tender. Final report; SUNSTORE 3. Fase 1. Projektering og udbud. Slutrapport." Denmark.
@misc{etde_1011557,
title = {SUNSTORE 3. Phase 1. Project design and tender. Final report; SUNSTORE 3. Fase 1. Projektering og udbud. Slutrapport}
author = {Soerensen, P A, Moeller Nielsen, C, Baunwall, M, Munkholt, H, Paaske, B, and Schmidt, T}
abstractNote = {The objective of the project has been to carry out detailed design and tendering for a heat production plant consisting of: - 35.000 m{sub 2} solar thermal collectors, - 60.000 m{sub 3} pit heat storage, - 3 MW{sub heat} heat pump, covering app. 50% of the heat production at Dronninglund district heating plant (Denmark). The final report for the project includes detailed design of the pit heat storage (a further development of a 10.000 m{sub 3} storage implemented in Marstal) and simulation of the total production system in the simulation software TRNSYS. (ln)}
place = {Denmark}
year = {2011}
month = {Mar}
}