Abstract
The purpose of this project has been to develop and demonstrate a window solution with a ventilation system with energy efficient heat recovery to satisfy the inhabitants' wish for optimal indoor climate at a minimum energy usage. The focus in the different developing phases has been the following products and technologies: 1) Fans - focus on sound level, vibration level, duty point and energy efficiency; 2) Heat recovery - focus on low pressure loss and high heat recovery; 3) System build-up - focus on low pressure loss, physical exploitation and condense water handling; 4) Condense water - focus on handling the condensed water so that it leaves the system by gravity; 5) Materials - focus on water resistance and production costs; 6) Filters - focus on pressure loss, filtration and possibility to change it from the inside; 7) Inlet air profile - focus on minimum short circuit between inlet and exhaust; 8) Internal leakage - focus on assembling and the production phase. During the project the the geometry had to be changed from an inside unit to and outside unit due to problems with the sound levels from the unit. The final result is a ventilation unit fitted to a
More>>
Citation Formats
Jacobsen, Per.
Energy neutral window for retrofitting residential building; Energineutralt vindue for opgradering af bolig.
Denmark: N. p.,
2010.
Web.
Jacobsen, Per.
Energy neutral window for retrofitting residential building; Energineutralt vindue for opgradering af bolig.
Denmark.
Jacobsen, Per.
2010.
"Energy neutral window for retrofitting residential building; Energineutralt vindue for opgradering af bolig."
Denmark.
@misc{etde_1011548,
title = {Energy neutral window for retrofitting residential building; Energineutralt vindue for opgradering af bolig}
author = {Jacobsen, Per}
abstractNote = {The purpose of this project has been to develop and demonstrate a window solution with a ventilation system with energy efficient heat recovery to satisfy the inhabitants' wish for optimal indoor climate at a minimum energy usage. The focus in the different developing phases has been the following products and technologies: 1) Fans - focus on sound level, vibration level, duty point and energy efficiency; 2) Heat recovery - focus on low pressure loss and high heat recovery; 3) System build-up - focus on low pressure loss, physical exploitation and condense water handling; 4) Condense water - focus on handling the condensed water so that it leaves the system by gravity; 5) Materials - focus on water resistance and production costs; 6) Filters - focus on pressure loss, filtration and possibility to change it from the inside; 7) Inlet air profile - focus on minimum short circuit between inlet and exhaust; 8) Internal leakage - focus on assembling and the production phase. During the project the the geometry had to be changed from an inside unit to and outside unit due to problems with the sound levels from the unit. The final result is a ventilation unit fitted to a window solution which provides optimal indoor comfort at a very low energy usage. (author)}
place = {Denmark}
year = {2010}
month = {May}
}
title = {Energy neutral window for retrofitting residential building; Energineutralt vindue for opgradering af bolig}
author = {Jacobsen, Per}
abstractNote = {The purpose of this project has been to develop and demonstrate a window solution with a ventilation system with energy efficient heat recovery to satisfy the inhabitants' wish for optimal indoor climate at a minimum energy usage. The focus in the different developing phases has been the following products and technologies: 1) Fans - focus on sound level, vibration level, duty point and energy efficiency; 2) Heat recovery - focus on low pressure loss and high heat recovery; 3) System build-up - focus on low pressure loss, physical exploitation and condense water handling; 4) Condense water - focus on handling the condensed water so that it leaves the system by gravity; 5) Materials - focus on water resistance and production costs; 6) Filters - focus on pressure loss, filtration and possibility to change it from the inside; 7) Inlet air profile - focus on minimum short circuit between inlet and exhaust; 8) Internal leakage - focus on assembling and the production phase. During the project the the geometry had to be changed from an inside unit to and outside unit due to problems with the sound levels from the unit. The final result is a ventilation unit fitted to a window solution which provides optimal indoor comfort at a very low energy usage. (author)}
place = {Denmark}
year = {2010}
month = {May}
}