Joint-project transport control system. Sub-project: Set-up of a material flow control with integration into the district control center`s infrastructure. Final report; Verbundvorhaben Transportleitsystem. Teilvorhaben: Aufbau einer Materialflusssteuerung mit Integration in die Bereichswarte Infrastruktur. Abschlussbericht

Abstract

Within the project, a transport control system was developed. The system was to monitor by 100% the material transport in the underground workings, and assure computer-controlled transport, for optimising transport management, for monitoring the rolling stock in terms of state and availability, and for allowing state-oriented maintenance of the rolling stock. For vehicle-position monitoring, a stationary laser scanner was developed. The almost 100% position monitoring is the basis for comprehensive and correct information flow and for computer-based transport management, also developed within the project. An absolutely necessary component of the transport control system is the newly developed voice and data radio communication allowing rapid data transmission as well as transport-relevant information transmission directly and to the correct adress from the control center. A machine-health monitoring system (diagnostics) monitors diesel-powered rolling stock during travel, and supports maintenance by allowing computer-based machine-health diagnostics to the maintenance staff. The concept also provides for a data exchange with the maintenance planning system allowing change-over from the periodicel preventive maintenance and repair planning to need-oriented maintenance. (orig.) [Deutsch] Im Forschungsvorhaben wurde ein Transportleitsystem (TLS) entwickelt. Es soll erstens den Materialtransport im Grubengebaeude moeglichst lueckenlos erfassen und darstellen, zweitens die Transportvorgaenge rechnergestuetzt steuern mit dem Ziel  More>>
Authors:
Publication Date:
Sep 01, 1994
Product Type:
Technical Report
Report Number:
ETDE-DE-5
Reference Number:
SCA: 012032; PA: DE-95:0G0430; EDB-95:027040; SN: 95001321245
Resource Relation:
Other Information: PBD: Sep 1994
Subject:
01 COAL, LIGNITE, AND PEAT; TRANSPORT; COMPUTERIZED CONTROL SYSTEMS; UNDERGROUND MINING; MATERIALS HANDLING; OPTIMIZATION; MONITORING; TRANSPORTATION SYSTEMS; MAINTENANCE; DISPLACEMENT GAGES; DIESEL ENGINES; REMOTE CONTROL; 012032; TRANSPORT AND SERVICES
Sponsoring Organizations:
Bundesministerium fuer Forschung und Technologie, Bonn (Germany)
OSTI ID:
10114350
Research Organizations:
Ruhrkohle AG, Essen (Germany)
Country of Origin:
Germany
Language:
English
Other Identifying Numbers:
Other: ON: DE95738150; CNN: Foerderkennzeichen BMFT 0326645H; TRN: DE95G0430
Availability:
OSTI; NTIS (US Sales Only)
Submitting Site:
DE
Size:
104 p.
Announcement Date:
Jun 30, 2005

Citation Formats

Hagen, G, and Melzer, H. Joint-project transport control system. Sub-project: Set-up of a material flow control with integration into the district control center`s infrastructure. Final report; Verbundvorhaben Transportleitsystem. Teilvorhaben: Aufbau einer Materialflusssteuerung mit Integration in die Bereichswarte Infrastruktur. Abschlussbericht. Germany: N. p., 1994. Web.
Hagen, G, & Melzer, H. Joint-project transport control system. Sub-project: Set-up of a material flow control with integration into the district control center`s infrastructure. Final report; Verbundvorhaben Transportleitsystem. Teilvorhaben: Aufbau einer Materialflusssteuerung mit Integration in die Bereichswarte Infrastruktur. Abschlussbericht. Germany.
Hagen, G, and Melzer, H. 1994. "Joint-project transport control system. Sub-project: Set-up of a material flow control with integration into the district control center`s infrastructure. Final report; Verbundvorhaben Transportleitsystem. Teilvorhaben: Aufbau einer Materialflusssteuerung mit Integration in die Bereichswarte Infrastruktur. Abschlussbericht." Germany.
@misc{etde_10114350,
title = {Joint-project transport control system. Sub-project: Set-up of a material flow control with integration into the district control center`s infrastructure. Final report; Verbundvorhaben Transportleitsystem. Teilvorhaben: Aufbau einer Materialflusssteuerung mit Integration in die Bereichswarte Infrastruktur. Abschlussbericht}
author = {Hagen, G, and Melzer, H}
abstractNote = {Within the project, a transport control system was developed. The system was to monitor by 100% the material transport in the underground workings, and assure computer-controlled transport, for optimising transport management, for monitoring the rolling stock in terms of state and availability, and for allowing state-oriented maintenance of the rolling stock. For vehicle-position monitoring, a stationary laser scanner was developed. The almost 100% position monitoring is the basis for comprehensive and correct information flow and for computer-based transport management, also developed within the project. An absolutely necessary component of the transport control system is the newly developed voice and data radio communication allowing rapid data transmission as well as transport-relevant information transmission directly and to the correct adress from the control center. A machine-health monitoring system (diagnostics) monitors diesel-powered rolling stock during travel, and supports maintenance by allowing computer-based machine-health diagnostics to the maintenance staff. The concept also provides for a data exchange with the maintenance planning system allowing change-over from the periodicel preventive maintenance and repair planning to need-oriented maintenance. (orig.) [Deutsch] Im Forschungsvorhaben wurde ein Transportleitsystem (TLS) entwickelt. Es soll erstens den Materialtransport im Grubengebaeude moeglichst lueckenlos erfassen und darstellen, zweitens die Transportvorgaenge rechnergestuetzt steuern mit dem Ziel einer Tourenoptimierung, drittens die Transportfahrzeuge ueberwachen bezueglich Zustand und Verfuegbarkeit sowie viertens eine zustandsabhaengige Fahrzeuginstandhaltung ermoeglichen. Zur Standorterfassung der Transportmittel wurde ein stationaerer Laser-Scanner entwickelt. Die nachgewiesene nahezu 100-%ige Standorterfassung ist Grundlage fuer einen umfassenden und korrekten Informationsfluss sowie fuer die rechnergestuetzte Disposition der Transportmittel, die ebenfalls im Vorhaben entwickelt wurde. Unverzichtbarer Bestandteil des TLS ist auch der neuentwickelte Sprech- und Datenfunk, der sowohl eine schnelle Datenuebertragung ermoeglicht als auch die Leitwarte in die Lage versetzt, transportrelevante Informationen unverzueglich und zielgerecht abzusetzen. Ein Maschinendiagnosesystem ueberwacht die dieselgetriebenen Transportmittel waehrend der Fahrt und unterstuetzt das Wartungspersonal waehrend der Instandhaltung, indem es die Moeglichkeit einer rechnergestuetzten Maschinendiagnose bietet. Das Konzept sieht auch einen Datenaustausch mit einem Instandhaltungsplanungssystem vor, der es zukuenftig erlaubt, von einer periodisch-vorbeugenden oder ausfallbedingten auf eine zustandsabhaengige Instandhaltung ueberzugehen. (orig.)}
place = {Germany}
year = {1994}
month = {Sep}
}