Abstract
This report investigates the efficient safety evaluation method and analysis procedure on Boron Dilution Accident(BDA) under the proportional shutdown margin to boron concentration. Also investigated are problems caused by applying this shutdown margin limit. Through this investigation, the safety of Kori-3 Cycle-8, Yonggwang-2 Cycle-7, Kori-4 Cycle-8 and Yonggwang-1 Cycle-8 with respect to BDA is verified. In order to satisfy the shutdown margin requirement in the Technical Specifications, it is shown that the High Flux Alarm at Shutdown Setting for Kori-4 Cycle-8 and Yonggwang-1 Cycle-8 at Mode 5 should be set at 2 or the Technical Specification should be revised. (Author).
Zee, Sung Kyun;
Lee, Ki Bog;
Song, Jae Woong
[1]
- Korea Atomic Energy Res. Inst., Taejon (Korea, Republic of)
Citation Formats
Zee, Sung Kyun, Lee, Ki Bog, and Song, Jae Woong.
Reload safety evaluation of boron dilution accident related to shutdown margin proportional to boron concentration.
Korea, Republic of: N. p.,
1993.
Web.
Zee, Sung Kyun, Lee, Ki Bog, & Song, Jae Woong.
Reload safety evaluation of boron dilution accident related to shutdown margin proportional to boron concentration.
Korea, Republic of.
Zee, Sung Kyun, Lee, Ki Bog, and Song, Jae Woong.
1993.
"Reload safety evaluation of boron dilution accident related to shutdown margin proportional to boron concentration."
Korea, Republic of.
@misc{etde_10113072,
title = {Reload safety evaluation of boron dilution accident related to shutdown margin proportional to boron concentration}
author = {Zee, Sung Kyun, Lee, Ki Bog, and Song, Jae Woong}
abstractNote = {This report investigates the efficient safety evaluation method and analysis procedure on Boron Dilution Accident(BDA) under the proportional shutdown margin to boron concentration. Also investigated are problems caused by applying this shutdown margin limit. Through this investigation, the safety of Kori-3 Cycle-8, Yonggwang-2 Cycle-7, Kori-4 Cycle-8 and Yonggwang-1 Cycle-8 with respect to BDA is verified. In order to satisfy the shutdown margin requirement in the Technical Specifications, it is shown that the High Flux Alarm at Shutdown Setting for Kori-4 Cycle-8 and Yonggwang-1 Cycle-8 at Mode 5 should be set at 2 or the Technical Specification should be revised. (Author).}
place = {Korea, Republic of}
year = {1993}
month = {Jun}
}
title = {Reload safety evaluation of boron dilution accident related to shutdown margin proportional to boron concentration}
author = {Zee, Sung Kyun, Lee, Ki Bog, and Song, Jae Woong}
abstractNote = {This report investigates the efficient safety evaluation method and analysis procedure on Boron Dilution Accident(BDA) under the proportional shutdown margin to boron concentration. Also investigated are problems caused by applying this shutdown margin limit. Through this investigation, the safety of Kori-3 Cycle-8, Yonggwang-2 Cycle-7, Kori-4 Cycle-8 and Yonggwang-1 Cycle-8 with respect to BDA is verified. In order to satisfy the shutdown margin requirement in the Technical Specifications, it is shown that the High Flux Alarm at Shutdown Setting for Kori-4 Cycle-8 and Yonggwang-1 Cycle-8 at Mode 5 should be set at 2 or the Technical Specification should be revised. (Author).}
place = {Korea, Republic of}
year = {1993}
month = {Jun}
}