Design, construction and operation of a gas-fuelled heating furnace designed to reduce fuel consumption and scaling. Final report; Bau und Betrieb einer gasbeheizten Schnellerwaermeungsanlage zur Verminderung des Energieverbrauchs und der Verzunderung des Waermgutes. Schlussbericht

Abstract

Together with gas companies, furnace engineers and a forging shop, Gaswaerme-Institut developed and tested a gas-fired rapid heating furnace for the low-scale and low-decarburization reheating of billets in a project sponsored by the West German Ministry of Research and Technology and the Commission of the European Communities. Apart from minimum scale formation and low decarburization, minimum energy consumption, low pollutant emission levels, automation and flexibility, for instance, with regard to charge geometry were important criteria. If the furnace is designed appropriately and the design calls, for instance, for a cost/benefit analysis demonstrated that the reheating costs associated with the gas fired rapid heating furnace are only 50% of the reheating costs incurred in induction heating for a wide range of parameters. The demonstration project justifies the conclusion that a gas-fired rapid heating furnace is a highly competitive alternative to an induction furnace. (orig./GL). [Deutsch] In Zusammenarbeit mit Unternehmen der Gasversorgung, des Ofenbaus sowie einem Schmiedebetrieb hat das Gaswaerme-Institut im Rahmen eines BMFT-EG Forschungsvorhabens eine gasbeheizte Schnellerwaermungsanlage zur zunder- und entkohlungsarmen Erwaermung von Schmiederohlingen konzipiert und untersucht. Grosser Wert wurde dabei auf einen niedrigen Energieverbrauch, Umweltvertraeglichkeit, hohen Automatisierungsgrad und Flexibilitaet in Anpassung an verschiedene betriebliche Belange, wie Waermegutabmessungen, gelegt. Im Rahmen  More>>
Publication Date:
May 30, 1990
Product Type:
Miscellaneous
Report Number:
ETDE-mf-93750622
Reference Number:
SCA: 320300; PA: DE-93:000129; SN: 93000915794
Resource Relation:
Other Information: PBD: 30 May 1990
Subject:
32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATION; METAL INDUSTRY; ENERGY CONSERVATION; HEAT TREATMENTS; HEAT RECOVERY; HEAT LOSSES; STOICHIOMETRY; COMBUSTION KINETICS; BURNERS; HEAT TRANSFER; OPTIMIZATION; FUEL CONSUMPTION; FORGING; 320300; INDUSTRIAL AND AGRICULTURAL PROCESSES
OSTI ID:
10112900
Research Organizations:
Gaswaerme-Institut e.V., Essen (Germany); Bundesministerium fuer Forschung und Technologie, Bonn (Germany)
Country of Origin:
Germany
Language:
German
Other Identifying Numbers:
Other: ON: DE93750622; CNN: Contract BMFT EE212/83; BMFT 03E8510; GWI 8348; TRN: DE9300129
Availability:
OSTI; NTIS (US Sales Only)
Submitting Site:
DE
Size:
103 p.
Announcement Date:
Jun 30, 2005

Citation Formats

Beckervordersandforth, C P, Fleischer, T, Klug, K H, Kremer, H, and Lueth, E. Design, construction and operation of a gas-fuelled heating furnace designed to reduce fuel consumption and scaling. Final report; Bau und Betrieb einer gasbeheizten Schnellerwaermeungsanlage zur Verminderung des Energieverbrauchs und der Verzunderung des Waermgutes. Schlussbericht. Germany: N. p., 1990. Web.
Beckervordersandforth, C P, Fleischer, T, Klug, K H, Kremer, H, & Lueth, E. Design, construction and operation of a gas-fuelled heating furnace designed to reduce fuel consumption and scaling. Final report; Bau und Betrieb einer gasbeheizten Schnellerwaermeungsanlage zur Verminderung des Energieverbrauchs und der Verzunderung des Waermgutes. Schlussbericht. Germany.
Beckervordersandforth, C P, Fleischer, T, Klug, K H, Kremer, H, and Lueth, E. 1990. "Design, construction and operation of a gas-fuelled heating furnace designed to reduce fuel consumption and scaling. Final report; Bau und Betrieb einer gasbeheizten Schnellerwaermeungsanlage zur Verminderung des Energieverbrauchs und der Verzunderung des Waermgutes. Schlussbericht." Germany.
@misc{etde_10112900,
title = {Design, construction and operation of a gas-fuelled heating furnace designed to reduce fuel consumption and scaling. Final report; Bau und Betrieb einer gasbeheizten Schnellerwaermeungsanlage zur Verminderung des Energieverbrauchs und der Verzunderung des Waermgutes. Schlussbericht}
author = {Beckervordersandforth, C P, Fleischer, T, Klug, K H, Kremer, H, and Lueth, E}
abstractNote = {Together with gas companies, furnace engineers and a forging shop, Gaswaerme-Institut developed and tested a gas-fired rapid heating furnace for the low-scale and low-decarburization reheating of billets in a project sponsored by the West German Ministry of Research and Technology and the Commission of the European Communities. Apart from minimum scale formation and low decarburization, minimum energy consumption, low pollutant emission levels, automation and flexibility, for instance, with regard to charge geometry were important criteria. If the furnace is designed appropriately and the design calls, for instance, for a cost/benefit analysis demonstrated that the reheating costs associated with the gas fired rapid heating furnace are only 50% of the reheating costs incurred in induction heating for a wide range of parameters. The demonstration project justifies the conclusion that a gas-fired rapid heating furnace is a highly competitive alternative to an induction furnace. (orig./GL). [Deutsch] In Zusammenarbeit mit Unternehmen der Gasversorgung, des Ofenbaus sowie einem Schmiedebetrieb hat das Gaswaerme-Institut im Rahmen eines BMFT-EG Forschungsvorhabens eine gasbeheizte Schnellerwaermungsanlage zur zunder- und entkohlungsarmen Erwaermung von Schmiederohlingen konzipiert und untersucht. Grosser Wert wurde dabei auf einen niedrigen Energieverbrauch, Umweltvertraeglichkeit, hohen Automatisierungsgrad und Flexibilitaet in Anpassung an verschiedene betriebliche Belange, wie Waermegutabmessungen, gelegt. Im Rahmen einer Wirtschaftlichkeitsrechnung konnte nachgewiesen werden, dass in einem weiten Parameterbereich die Erwaermungskosten bei einer gasbeheizten Schnellerwaermungsanlage nur 50% der Kosten einer vergleichbaren Induktionsanlage betragen. Diese Ergebnisse lassen den Schluss zu, dass die gasbeheizte Schnellerwaermung eine technisch und wirtschaftlich attraktive Alternative zur induktiven Erwaermung darstellt. (orig./GL).}
place = {Germany}
year = {1990}
month = {May}
}