You need JavaScript to view this

Test rig for the investigation of operating and control concepts for ice storage systems; Versuchsanlage zur Untersuchung von betriebs- und regeltechnischen Konzepten fuer Eisspeicher

Abstract

The ice storage test rig erected according to the ice constructor system has been investigated in detail with regard to its capacity and operating behavior. It could be confirmed that the storage capacity is exceeded. In three hours, a full discharge has been proven with a small decrease in efficiency. In addition, sensible heat is available. The ice distribution via the bundle of pipes admitted with refrigerants is very constant. The operating experience shows that a regular full discharge is necessary for the maintenance of a constant ice distribution. This makes high demands on the operation management. For reasons of operation and economy the ice storage priority operation has to be preferred. A theoretical consideration and operating experiences with the system certify the correctness of this demand. For the realization a reliable measurement of the storage capacity is necessary. The ice constructor system facilitates this in a simple and exact way. (orig./BWI). [Deutsch] Die errichtete Eisspeicherversuchsanlage nach dem Eisbauersystem wurde eingehend auf ihre Leistungsfaehigkeit und Betriebsverhalten hin untersucht. Dabei konnte bestaetigt werden, dass die Speicherkapazitaet ueberschitten wird. Eine Vollentladung ist in drei Stunden mit nur geringfuegigem Leistungsabfall nachgewiesen worden. Darueber hinaus steht die sensible Waerme zusaetzlich zur Verfuegung. Die Eisverteilung  More>>
Publication Date:
Mar 01, 1991
Product Type:
Miscellaneous
Report Number:
ETDE-mf-93750301
Reference Number:
SCA: 250600; PA: DE-93:000018; SN: 93000915473
Resource Relation:
Other Information: PBD: Mar 1991
Subject:
25 ENERGY STORAGE; STORAGE FACILITIES; ICE; MEASURING METHODS; RESEARCH PROGRAMS; TEST FACILITIES; DESIGN; OPERATION; ENERGY EFFICIENCY; SENSIBLE HEAT STORAGE; HEAT TRANSFER; HEAT EXCHANGERS; REFRIGERANTS; THERMODYNAMICS; ECONOMICS; 250600; THERMAL
OSTI ID:
10112888
Research Organizations:
Turbon-Tunzini Klimatechnik GmbH, Bergisch Gladbach (Germany); Bundesministerium fuer Forschung und Technologie, Bonn (Germany)
Country of Origin:
Germany
Language:
German
Other Identifying Numbers:
Other: ON: DE93750301; CNN: Contract BMFT 0328829A; TRN: DE9300018
Availability:
OSTI; NTIS (US Sales Only)
Submitting Site:
DE
Size:
156 p.
Announcement Date:
Jun 30, 2005

Citation Formats

Brunk, M F, and Peschen, P. Test rig for the investigation of operating and control concepts for ice storage systems; Versuchsanlage zur Untersuchung von betriebs- und regeltechnischen Konzepten fuer Eisspeicher. Germany: N. p., 1991. Web.
Brunk, M F, & Peschen, P. Test rig for the investigation of operating and control concepts for ice storage systems; Versuchsanlage zur Untersuchung von betriebs- und regeltechnischen Konzepten fuer Eisspeicher. Germany.
Brunk, M F, and Peschen, P. 1991. "Test rig for the investigation of operating and control concepts for ice storage systems; Versuchsanlage zur Untersuchung von betriebs- und regeltechnischen Konzepten fuer Eisspeicher." Germany.
@misc{etde_10112888,
title = {Test rig for the investigation of operating and control concepts for ice storage systems; Versuchsanlage zur Untersuchung von betriebs- und regeltechnischen Konzepten fuer Eisspeicher}
author = {Brunk, M F, and Peschen, P}
abstractNote = {The ice storage test rig erected according to the ice constructor system has been investigated in detail with regard to its capacity and operating behavior. It could be confirmed that the storage capacity is exceeded. In three hours, a full discharge has been proven with a small decrease in efficiency. In addition, sensible heat is available. The ice distribution via the bundle of pipes admitted with refrigerants is very constant. The operating experience shows that a regular full discharge is necessary for the maintenance of a constant ice distribution. This makes high demands on the operation management. For reasons of operation and economy the ice storage priority operation has to be preferred. A theoretical consideration and operating experiences with the system certify the correctness of this demand. For the realization a reliable measurement of the storage capacity is necessary. The ice constructor system facilitates this in a simple and exact way. (orig./BWI). [Deutsch] Die errichtete Eisspeicherversuchsanlage nach dem Eisbauersystem wurde eingehend auf ihre Leistungsfaehigkeit und Betriebsverhalten hin untersucht. Dabei konnte bestaetigt werden, dass die Speicherkapazitaet ueberschitten wird. Eine Vollentladung ist in drei Stunden mit nur geringfuegigem Leistungsabfall nachgewiesen worden. Darueber hinaus steht die sensible Waerme zusaetzlich zur Verfuegung. Die Eisverteilung ueber die direkt kaeltemittelbeaufschlagten Rohrbuendel ist sehr gleichmaessig. Die Betriebserfahrung zeigt, dass eine regelmaessige Vollentladung zur Erhaltung einer gleichmaessigen Eisverteilung unabdingbar ist. Dies stellt entsprechende Forderungen an die Betriebsfuehrung. Aus betrieblichen und aus wirtschaftlichen Gruenden ist der Eisspeicher-Vorrang-Betrieb eindeutig zu bevorzugen. Theoretische Betrachtung und Betriebserfahrungen mit der Anlage belegen die Richtigkeit dieser Forderung. Zur Realisierung ist eine verlaessliche Messung der Speicherkapazitaet unverzichtbar. Das Eisbauersystem ermoeglicht dies in einfacher und exakter Weise. (orig./BWI).}
place = {Germany}
year = {1991}
month = {Mar}
}