Abstract
The self-reliance of NSSS System Design is required not only the design capability to perform the system design but also the management capability to control the resource and time for the Project effectively. The purpose of this study is to develop the simplified standard Logic Network that is scheduled on the time and resource using the PERT/CPM method. That is mainly focused on Ulchin 3, 4 Project. We prepare the management tool of NSSS System Design project. And we can utilize it as a reference tool for the similar project which are complex and long term in a next project. (Author).
Chung, Moon Kyu;
Lee, Byeong Ryeong;
Lee, Pan Kwon;
Lee, Hae Joon;
Park, Joon Won;
Song, Tae Gil;
Kim, Dong Hui;
Choi, Hyeon Ho
[1]
- Korea Atomic Energy Res. Inst., Taejon (Korea, Republic of)
Citation Formats
Chung, Moon Kyu, Lee, Byeong Ryeong, Lee, Pan Kwon, Lee, Hae Joon, Park, Joon Won, Song, Tae Gil, Kim, Dong Hui, and Choi, Hyeon Ho.
Development of standard logic network for PWR NSSS system design.
Korea, Republic of: N. p.,
1993.
Web.
Chung, Moon Kyu, Lee, Byeong Ryeong, Lee, Pan Kwon, Lee, Hae Joon, Park, Joon Won, Song, Tae Gil, Kim, Dong Hui, & Choi, Hyeon Ho.
Development of standard logic network for PWR NSSS system design.
Korea, Republic of.
Chung, Moon Kyu, Lee, Byeong Ryeong, Lee, Pan Kwon, Lee, Hae Joon, Park, Joon Won, Song, Tae Gil, Kim, Dong Hui, and Choi, Hyeon Ho.
1993.
"Development of standard logic network for PWR NSSS system design."
Korea, Republic of.
@misc{etde_10111545,
title = {Development of standard logic network for PWR NSSS system design}
author = {Chung, Moon Kyu, Lee, Byeong Ryeong, Lee, Pan Kwon, Lee, Hae Joon, Park, Joon Won, Song, Tae Gil, Kim, Dong Hui, and Choi, Hyeon Ho}
abstractNote = {The self-reliance of NSSS System Design is required not only the design capability to perform the system design but also the management capability to control the resource and time for the Project effectively. The purpose of this study is to develop the simplified standard Logic Network that is scheduled on the time and resource using the PERT/CPM method. That is mainly focused on Ulchin 3, 4 Project. We prepare the management tool of NSSS System Design project. And we can utilize it as a reference tool for the similar project which are complex and long term in a next project. (Author).}
place = {Korea, Republic of}
year = {1993}
month = {May}
}
title = {Development of standard logic network for PWR NSSS system design}
author = {Chung, Moon Kyu, Lee, Byeong Ryeong, Lee, Pan Kwon, Lee, Hae Joon, Park, Joon Won, Song, Tae Gil, Kim, Dong Hui, and Choi, Hyeon Ho}
abstractNote = {The self-reliance of NSSS System Design is required not only the design capability to perform the system design but also the management capability to control the resource and time for the Project effectively. The purpose of this study is to develop the simplified standard Logic Network that is scheduled on the time and resource using the PERT/CPM method. That is mainly focused on Ulchin 3, 4 Project. We prepare the management tool of NSSS System Design project. And we can utilize it as a reference tool for the similar project which are complex and long term in a next project. (Author).}
place = {Korea, Republic of}
year = {1993}
month = {May}
}