Progress report of the 600 m borehole project of the CEC programme on radioactive waste management and disposal. January-July 1990

Abstract

In the framework of the CEC Programme on Radioactive Waste Disposal (1985-1900), in situ experiments in salt deposits are conducted. The experimental results will be used to validate analytical techniques and computer models for the prediction of salt behaviour. The experiments planned in boreholes of 600 m depth take place in the Asse II salt mine in Germany. The progress of the work during the first half of 1990 is reported. For the drilling of the boreholes a new technique has been developed. The drillings resulted in two boreholes of approximately 300 m. In one of these boreholes drilling will not continue and convergence measurements have started. The convergence measurement devices are installed in one of the holes and are successfully in operation since February 1990. Convergence data will be reported in a date report. A 2nd experiment is prepared for which the variable pressure device has been constructed. This device will be placed at the end of 1990 in the Asse salt mine after the necessary tests have been performed. A measuring program of 2 Years will be carried out during the second phase of the 600 m borehole project 1991-1992. The convergence measurement devices will be temporarily stored  More>>
Publication Date:
Dec 01, 1990
Product Type:
Technical Report
Report Number:
ECN-C-90-063
Reference Number:
SCA: 052002; PA: AIX-23:012501; SN: 92000638349
Resource Relation:
Other Information: DN: This work has been performed within the framework of the Commission of the European Communities Research Programme on Radioactive Waste Disposal, CEC Directorate General for Research.; PBD: Dec 1990
Subject:
12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE WASTES FROM NUCLEAR FACILITIES; ASSE SALT MINE; BOREHOLES; FEASIBILITY STUDIES; RADIOACTIVE WASTE DISPOSAL; CONVERGENCE; ECN; HIGH-LEVEL RADIOACTIVE WASTES; PROGRESS REPORT; 052002; WASTE DISPOSAL AND STORAGE
OSTI ID:
10111464
Research Organizations:
Netherlands Energy Research Foundation (ECN), Petten (Netherlands)
Country of Origin:
Netherlands
Language:
English
Other Identifying Numbers:
Other: ON: DE92613948; CNN: Contract no. FI1W/0084; TRN: NL91C0826012501
Availability:
OSTI; NTIS (US Sales Only); INIS
Submitting Site:
NLN
Size:
24 p.
Announcement Date:
Jun 30, 2005

Citation Formats

Hamilton, L F.M., and Jockwer, N. Progress report of the 600 m borehole project of the CEC programme on radioactive waste management and disposal. January-July 1990. Netherlands: N. p., 1990. Web.
Hamilton, L F.M., & Jockwer, N. Progress report of the 600 m borehole project of the CEC programme on radioactive waste management and disposal. January-July 1990. Netherlands.
Hamilton, L F.M., and Jockwer, N. 1990. "Progress report of the 600 m borehole project of the CEC programme on radioactive waste management and disposal. January-July 1990." Netherlands.
@misc{etde_10111464,
title = {Progress report of the 600 m borehole project of the CEC programme on radioactive waste management and disposal. January-July 1990}
author = {Hamilton, L F.M., and Jockwer, N}
abstractNote = {In the framework of the CEC Programme on Radioactive Waste Disposal (1985-1900), in situ experiments in salt deposits are conducted. The experimental results will be used to validate analytical techniques and computer models for the prediction of salt behaviour. The experiments planned in boreholes of 600 m depth take place in the Asse II salt mine in Germany. The progress of the work during the first half of 1990 is reported. For the drilling of the boreholes a new technique has been developed. The drillings resulted in two boreholes of approximately 300 m. In one of these boreholes drilling will not continue and convergence measurements have started. The convergence measurement devices are installed in one of the holes and are successfully in operation since February 1990. Convergence data will be reported in a date report. A 2nd experiment is prepared for which the variable pressure device has been constructed. This device will be placed at the end of 1990 in the Asse salt mine after the necessary tests have been performed. A measuring program of 2 Years will be carried out during the second phase of the 600 m borehole project 1991-1992. The convergence measurement devices will be temporarily stored until a 600 m deep borehole will have been drilled at the end of 1991. (author). 7 refs.; 8 figs.}
place = {Netherlands}
year = {1990}
month = {Dec}
}