Abstract
Due to several modifications which were imposed to its time schedule during construction, the Angra-1 reactor did not enter to the grid in 1982 as it was initially foreseen. These modifications occurred due to an unforeseen scenario that was verified in steam generators (serie D-3, Westinghouse) of power stations with similar configurations which had been installed in other countries such as Ringhals-3 (Sweden), Almaraz-1 (Spain) and McGuine-1 (USA). So, among the main events that occurred in the Angra-1 reactor, which were of interest from the point of view of radiation protection, it could be pointed out the personnel monitoring, and the occupational exposure measurements at different reactor power, during the reactor fueling and during modification and tests performed at the steam generators and at ducts of the primary coolant circuit. (author).
Citation Formats
Moraes, A.
Occupational analysis for the Angra-1 reactor; Analise ocupacional na unidade I da central nuclear Almirante Alvaro Alberto.
Brazil: N. p.,
1991.
Web.
Moraes, A.
Occupational analysis for the Angra-1 reactor; Analise ocupacional na unidade I da central nuclear Almirante Alvaro Alberto.
Brazil.
Moraes, A.
1991.
"Occupational analysis for the Angra-1 reactor; Analise ocupacional na unidade I da central nuclear Almirante Alvaro Alberto."
Brazil.
@misc{etde_10111217,
title = {Occupational analysis for the Angra-1 reactor; Analise ocupacional na unidade I da central nuclear Almirante Alvaro Alberto}
author = {Moraes, A}
abstractNote = {Due to several modifications which were imposed to its time schedule during construction, the Angra-1 reactor did not enter to the grid in 1982 as it was initially foreseen. These modifications occurred due to an unforeseen scenario that was verified in steam generators (serie D-3, Westinghouse) of power stations with similar configurations which had been installed in other countries such as Ringhals-3 (Sweden), Almaraz-1 (Spain) and McGuine-1 (USA). So, among the main events that occurred in the Angra-1 reactor, which were of interest from the point of view of radiation protection, it could be pointed out the personnel monitoring, and the occupational exposure measurements at different reactor power, during the reactor fueling and during modification and tests performed at the steam generators and at ducts of the primary coolant circuit. (author).}
place = {Brazil}
year = {1991}
month = {Dec}
}
title = {Occupational analysis for the Angra-1 reactor; Analise ocupacional na unidade I da central nuclear Almirante Alvaro Alberto}
author = {Moraes, A}
abstractNote = {Due to several modifications which were imposed to its time schedule during construction, the Angra-1 reactor did not enter to the grid in 1982 as it was initially foreseen. These modifications occurred due to an unforeseen scenario that was verified in steam generators (serie D-3, Westinghouse) of power stations with similar configurations which had been installed in other countries such as Ringhals-3 (Sweden), Almaraz-1 (Spain) and McGuine-1 (USA). So, among the main events that occurred in the Angra-1 reactor, which were of interest from the point of view of radiation protection, it could be pointed out the personnel monitoring, and the occupational exposure measurements at different reactor power, during the reactor fueling and during modification and tests performed at the steam generators and at ducts of the primary coolant circuit. (author).}
place = {Brazil}
year = {1991}
month = {Dec}
}