Occupational analysis for the Angra-1 reactor; Analise ocupacional na unidade I da central nuclear Almirante Alvaro Alberto

Abstract

Due to several modifications which were imposed to its time schedule during construction, the Angra-1 reactor did not enter to the grid in 1982 as it was initially foreseen. These modifications occurred due to an unforeseen scenario that was verified in steam generators (serie D-3, Westinghouse) of power stations with similar configurations which had been installed in other countries such as Ringhals-3 (Sweden), Almaraz-1 (Spain) and McGuine-1 (USA). So, among the main events that occurred in the Angra-1 reactor, which were of interest from the point of view of radiation protection, it could be pointed out the personnel monitoring, and the occupational exposure measurements at different reactor power, during the reactor fueling and during modification and tests performed at the steam generators and at ducts of the primary coolant circuit. (author).
Authors:
Publication Date:
Dec 31, 1991
Product Type:
Miscellaneous
Report Number:
INIS-BR-2863
Reference Number:
SCA: 560101; PA: AIX-23:011330; SN: 92000637845
Resource Relation:
Other Information: PBD: [1991]
Subject:
61 RADIATION PROTECTION AND DOSIMETRY; OCCUPATIONAL EXPOSURE; ANGRA-1 REACTOR; PERSONNEL MONITORING; RADIATION PROTECTION; REACTOR FUELING; REACTOR OPERATION; 560101; DOSIMETRY AND MONITORING
OSTI ID:
10111217
Research Organizations:
Instituto de Radioprotecao e Dosimetria (IRD), Rio de Janeiro, RJ (Brazil)
Country of Origin:
Brazil
Language:
Portuguese
Other Identifying Numbers:
Other: ON: DE92613611; TRN: BR9228287011330
Availability:
OSTI; NTIS (US Sales Only); INIS
Submitting Site:
INIS
Size:
62 p.
Announcement Date:
Jun 30, 2005

Citation Formats

Moraes, A. Occupational analysis for the Angra-1 reactor; Analise ocupacional na unidade I da central nuclear Almirante Alvaro Alberto. Brazil: N. p., 1991. Web.
Moraes, A. Occupational analysis for the Angra-1 reactor; Analise ocupacional na unidade I da central nuclear Almirante Alvaro Alberto. Brazil.
Moraes, A. 1991. "Occupational analysis for the Angra-1 reactor; Analise ocupacional na unidade I da central nuclear Almirante Alvaro Alberto." Brazil.
@misc{etde_10111217,
title = {Occupational analysis for the Angra-1 reactor; Analise ocupacional na unidade I da central nuclear Almirante Alvaro Alberto}
author = {Moraes, A}
abstractNote = {Due to several modifications which were imposed to its time schedule during construction, the Angra-1 reactor did not enter to the grid in 1982 as it was initially foreseen. These modifications occurred due to an unforeseen scenario that was verified in steam generators (serie D-3, Westinghouse) of power stations with similar configurations which had been installed in other countries such as Ringhals-3 (Sweden), Almaraz-1 (Spain) and McGuine-1 (USA). So, among the main events that occurred in the Angra-1 reactor, which were of interest from the point of view of radiation protection, it could be pointed out the personnel monitoring, and the occupational exposure measurements at different reactor power, during the reactor fueling and during modification and tests performed at the steam generators and at ducts of the primary coolant circuit. (author).}
place = {Brazil}
year = {1991}
month = {Dec}
}