You need JavaScript to view this

Development, construction and testing of two metal membrane solar concentrators with Stirling energy converter, each with a capacity of 50 kW. Final report; Entwicklung, Bau und Erprobung zweier Metallmembran-Solarkonzentratoren mit Stirling-Energiewandler, Leistung je 50 kW{sub e,pk}. Abschlussbericht

Abstract

The aim of the project was the planning, the development, the construction, testing and operation of two membrane solar concentrators with Stirling energy converters. The project had the following results among other things: 1. The system is distinguished by good efficiency, adaptability and low development cost. 2. Even large and very large concentrators can be constructed without great investment cost on site. 3. The Stirling energy converters also had good results under extreme service conditions and weather conditions. 4. The tracking and control occured with electronic systems. 5. The losses of the receiver should be decreased even further. 6. The possibility of the reliable supply of an isolated grid could be demonstrated. 7. The second part of the project (operating phase) unfortunately was not as successful. (orig./HW) [Deutsch] Das vorliegende Projekt hatte die Planung, die Entwicklung, den Bau, Test und Betrieb zweier Membran-Solarkonzentratoren mit Stirling-Energiewandlern zum Ziel. Das Projekt zeigte die folgenden Ergebnisse: 1. Das System zeichnet sich durch gute Wirkungsgrade, Anpassungsfaehigkeit und geringe Entwicklungstest aus. 2. Auch grosse und groesste Konzentrationen koennen ohne grosse Investitionskosten vor Ort erstellt werden. 3. Die Stirling-Energiewandler lieferten gute Ergebnisse auch unter extremen Betriebs- und Witterungsbedingungen. 4. Die Nachfuehrung und Regelung erfolgte mit elektronischen  More>>
Publication Date:
Dec 31, 1987
Product Type:
Technical Report
Report Number:
ETDE/DE-mf-95726973
Reference Number:
SCA: 140704; 141000; PA: DE-94:0GN649; EDB-95:013257; SN: 95001306338
Resource Relation:
Other Information: PBD: 1987
Subject:
14 SOLAR ENERGY; DISTRIBUTED COLLECTOR POWER PLANTS; STIRLING CYCLE; SOLAR CONCENTRATORS; SOLAR TRACKING SYSTEMS; ENERGY CONVERSION; SPECIFICATIONS; CONTROL SYSTEMS; DATA ACQUISITION; EFFICIENCY; MEMBRANES; DESIGN; SIMULATION; ELECTRICAL EQUIPMENT; CONSTRUCTION; FABRICATION; INTERNATIONAL COOPERATION; FEDERAL REPUBLIC OF GERMANY; SAUDI ARABIA; PERFORMANCE TESTING; SAFETY ENGINEERING; DEMONSTRATION PLANTS; RESEARCH PROGRAMS; 140704; 141000; TOTAL ENERGY AND HYBRID SYSTEMS; SOLAR COLLECTORS AND CONCENTRATORS
Sponsoring Organizations:
Bundesministerium fuer Forschung und Technologie, Bonn (Germany)
OSTI ID:
10106711
Research Organizations:
Schlaich, Bergermann und Partner, Stuttgart (Germany)
Country of Origin:
Germany
Language:
German
Other Identifying Numbers:
Other: ON: DE95726973; CNN: Foerderkennzeichen BMFT 03E8247A; TRN: DE94GN649
Availability:
OSTI; NTIS (US Sales Only)
Submitting Site:
DE
Size:
156 p.
Announcement Date:
Jun 30, 2005

Citation Formats

Benz, R, Schiel, W, Friedl, W, and Schlaich, J. Development, construction and testing of two metal membrane solar concentrators with Stirling energy converter, each with a capacity of 50 kW. Final report; Entwicklung, Bau und Erprobung zweier Metallmembran-Solarkonzentratoren mit Stirling-Energiewandler, Leistung je 50 kW{sub e,pk}. Abschlussbericht. Germany: N. p., 1987. Web.
Benz, R, Schiel, W, Friedl, W, & Schlaich, J. Development, construction and testing of two metal membrane solar concentrators with Stirling energy converter, each with a capacity of 50 kW. Final report; Entwicklung, Bau und Erprobung zweier Metallmembran-Solarkonzentratoren mit Stirling-Energiewandler, Leistung je 50 kW{sub e,pk}. Abschlussbericht. Germany.
Benz, R, Schiel, W, Friedl, W, and Schlaich, J. 1987. "Development, construction and testing of two metal membrane solar concentrators with Stirling energy converter, each with a capacity of 50 kW. Final report; Entwicklung, Bau und Erprobung zweier Metallmembran-Solarkonzentratoren mit Stirling-Energiewandler, Leistung je 50 kW{sub e,pk}. Abschlussbericht." Germany.
@misc{etde_10106711,
title = {Development, construction and testing of two metal membrane solar concentrators with Stirling energy converter, each with a capacity of 50 kW. Final report; Entwicklung, Bau und Erprobung zweier Metallmembran-Solarkonzentratoren mit Stirling-Energiewandler, Leistung je 50 kW{sub e,pk}. Abschlussbericht}
author = {Benz, R, Schiel, W, Friedl, W, and Schlaich, J}
abstractNote = {The aim of the project was the planning, the development, the construction, testing and operation of two membrane solar concentrators with Stirling energy converters. The project had the following results among other things: 1. The system is distinguished by good efficiency, adaptability and low development cost. 2. Even large and very large concentrators can be constructed without great investment cost on site. 3. The Stirling energy converters also had good results under extreme service conditions and weather conditions. 4. The tracking and control occured with electronic systems. 5. The losses of the receiver should be decreased even further. 6. The possibility of the reliable supply of an isolated grid could be demonstrated. 7. The second part of the project (operating phase) unfortunately was not as successful. (orig./HW) [Deutsch] Das vorliegende Projekt hatte die Planung, die Entwicklung, den Bau, Test und Betrieb zweier Membran-Solarkonzentratoren mit Stirling-Energiewandlern zum Ziel. Das Projekt zeigte die folgenden Ergebnisse: 1. Das System zeichnet sich durch gute Wirkungsgrade, Anpassungsfaehigkeit und geringe Entwicklungstest aus. 2. Auch grosse und groesste Konzentrationen koennen ohne grosse Investitionskosten vor Ort erstellt werden. 3. Die Stirling-Energiewandler lieferten gute Ergebnisse auch unter extremen Betriebs- und Witterungsbedingungen. 4. Die Nachfuehrung und Regelung erfolgte mit elektronischen Systemen 5. Die Verluste des Receivers sollten noch weiter vermindert werden. 6. Die Moeglichkeit einer zuverlaessigen Versorgung eines Inselnetzes koennte demonstriert werden. 7. Der 2.Teil des Projektes (Betriebsphase) muss leider als nicht so erfolgreich bezeichnet werden. (orig./HW)}
place = {Germany}
year = {1987}
month = {Dec}
}