Abstract
Barriers are a major component of the satefy concept for the Gorleben repository. The construction and performance of dams are currently tested within the framework of a project carried out in the Asse salt mine. A measuring programme has been established to give evidence of the sealing capacities of a barrier consisting of an abatement, long-term sealing material, and a hydraulic sealing system. Tests are to be made to verify the barrier`s performance for shorter of long time periods (up to about 500 years). The tests are assisted by computed models established for the project. The long-term safety aspects to be studied include such conditions as permeability changes due to mechanical impacts, circulation conditions at the roadside, and the serviceable life and efficiency of the sealing components. (DG). [Deutsch] Dammbauwerke gehoeren zum Sicherheitskonzept des Endlagers Gorleben und werden im Salzbergwerk ASSE demonstriert. Duch ein geeignetes Messprogramm wird der Nachweis der Dichtigkeit eines aus den Komponenten Widerlager, Langzeitdichtung und hydraulischer Dichtung erstellten. Dammbauwerke ueber kurze und lange Zeitraeume (bis ca. 500 Jahre) erbracht. Dazu werden geeignete Rechenmodelle erstellt. Im Hinblick auf die Langzeitsicherheitsaspekte sind Fragen der Permealibilitaetsaenderungen durch mechanische Vorgaenge der Umlaeufigkeit im Streckenraum und der Wirksamkeitsdauer der Dichtungskomponenten beantwortet. (DG).
Stockmann, N;
Beinlich, A;
Flach, D;
Jockwer, N;
Klarr, K;
Krogmann, P;
Miehe, R;
Schmidt, M W;
Schwaegermann, H F;
Walter, F;
Yaramanci, U
[1]
- GSF - Forschungszentrum fuer Umwelt und Gesundheit GmbH, Inst. fuer Tieflagerung, Braunschweig (Germany)
Citation Formats
Stockmann, N, Beinlich, A, Flach, D, Jockwer, N, Klarr, K, Krogmann, P, Miehe, R, Schmidt, M W, Schwaegermann, H F, Walter, F, and Yaramanci, U.
Dam construction in salt rock. Test schedule; Dammbau im Salzgebirge. Testplan.
Germany: N. p.,
1991.
Web.
Stockmann, N, Beinlich, A, Flach, D, Jockwer, N, Klarr, K, Krogmann, P, Miehe, R, Schmidt, M W, Schwaegermann, H F, Walter, F, & Yaramanci, U.
Dam construction in salt rock. Test schedule; Dammbau im Salzgebirge. Testplan.
Germany.
Stockmann, N, Beinlich, A, Flach, D, Jockwer, N, Klarr, K, Krogmann, P, Miehe, R, Schmidt, M W, Schwaegermann, H F, Walter, F, and Yaramanci, U.
1991.
"Dam construction in salt rock. Test schedule; Dammbau im Salzgebirge. Testplan."
Germany.
@misc{etde_10106142,
title = {Dam construction in salt rock. Test schedule; Dammbau im Salzgebirge. Testplan}
author = {Stockmann, N, Beinlich, A, Flach, D, Jockwer, N, Klarr, K, Krogmann, P, Miehe, R, Schmidt, M W, Schwaegermann, H F, Walter, F, and Yaramanci, U}
abstractNote = {Barriers are a major component of the satefy concept for the Gorleben repository. The construction and performance of dams are currently tested within the framework of a project carried out in the Asse salt mine. A measuring programme has been established to give evidence of the sealing capacities of a barrier consisting of an abatement, long-term sealing material, and a hydraulic sealing system. Tests are to be made to verify the barrier`s performance for shorter of long time periods (up to about 500 years). The tests are assisted by computed models established for the project. The long-term safety aspects to be studied include such conditions as permeability changes due to mechanical impacts, circulation conditions at the roadside, and the serviceable life and efficiency of the sealing components. (DG). [Deutsch] Dammbauwerke gehoeren zum Sicherheitskonzept des Endlagers Gorleben und werden im Salzbergwerk ASSE demonstriert. Duch ein geeignetes Messprogramm wird der Nachweis der Dichtigkeit eines aus den Komponenten Widerlager, Langzeitdichtung und hydraulischer Dichtung erstellten. Dammbauwerke ueber kurze und lange Zeitraeume (bis ca. 500 Jahre) erbracht. Dazu werden geeignete Rechenmodelle erstellt. Im Hinblick auf die Langzeitsicherheitsaspekte sind Fragen der Permealibilitaetsaenderungen durch mechanische Vorgaenge der Umlaeufigkeit im Streckenraum und der Wirksamkeitsdauer der Dichtungskomponenten beantwortet. (DG).}
place = {Germany}
year = {1991}
month = {Nov}
}
title = {Dam construction in salt rock. Test schedule; Dammbau im Salzgebirge. Testplan}
author = {Stockmann, N, Beinlich, A, Flach, D, Jockwer, N, Klarr, K, Krogmann, P, Miehe, R, Schmidt, M W, Schwaegermann, H F, Walter, F, and Yaramanci, U}
abstractNote = {Barriers are a major component of the satefy concept for the Gorleben repository. The construction and performance of dams are currently tested within the framework of a project carried out in the Asse salt mine. A measuring programme has been established to give evidence of the sealing capacities of a barrier consisting of an abatement, long-term sealing material, and a hydraulic sealing system. Tests are to be made to verify the barrier`s performance for shorter of long time periods (up to about 500 years). The tests are assisted by computed models established for the project. The long-term safety aspects to be studied include such conditions as permeability changes due to mechanical impacts, circulation conditions at the roadside, and the serviceable life and efficiency of the sealing components. (DG). [Deutsch] Dammbauwerke gehoeren zum Sicherheitskonzept des Endlagers Gorleben und werden im Salzbergwerk ASSE demonstriert. Duch ein geeignetes Messprogramm wird der Nachweis der Dichtigkeit eines aus den Komponenten Widerlager, Langzeitdichtung und hydraulischer Dichtung erstellten. Dammbauwerke ueber kurze und lange Zeitraeume (bis ca. 500 Jahre) erbracht. Dazu werden geeignete Rechenmodelle erstellt. Im Hinblick auf die Langzeitsicherheitsaspekte sind Fragen der Permealibilitaetsaenderungen durch mechanische Vorgaenge der Umlaeufigkeit im Streckenraum und der Wirksamkeitsdauer der Dichtungskomponenten beantwortet. (DG).}
place = {Germany}
year = {1991}
month = {Nov}
}