Experiment with flexible electric power consumption; Demonstrationsforsoeg med fleksibelt elforbrug

Abstract

The emergence of interactive meters with communication module has made it possible that electricity consumption at different customer segments can be activated in a new way of benefit for the customer, the electricity company and the system operator. In this demonstration project customer segment is larger commercial properties and public institutions. In conclusion, it is technically possible to manage and activate the potential for demand response within the segment of large office blocks and public buildings. Practical experiments have shown that it is more expensive to achieve flexibility in power consumption for older properties than for a newly built property. The economics of demand response within office buildings are currently (prices as of 2008) not so attractive for either the customer or the utility company in relation to the investments needed to be made at both the customer and the utility company to build an infrastructure. It should also be noted that there may be relatively much work involved in handling a lot of small systems compared to systems of large effects, for example 500 kW and more. It is therefore the more attractive systems within the industrial customer segments with plants as UPS systems, cooling systems in cold storage  More>>
Authors:
Pedersen, Thomas Emil [1] 
  1. Dong Energy A/S, Fredericia (Denmark)
Publication Date:
Sep 15, 2009
Product Type:
Technical Report
Report Number:
NEI-DK-5440
Resource Relation:
Other Information: PSO-2005; 13 refs.; 32 figs.
Subject:
32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATION; OFFICE BUILDINGS; PUBLIC BUILDINGS; ELECTRIC POWER; ENERGY CONSUMPTION; PRICES; TIME-OF-USE PRICING; POWER METERS; COMPUTERIZED CONTROL SYSTEMS; COST BENEFIT ANALYSIS; SUPPLY AND DEMAND
OSTI ID:
1000230
Research Organizations:
Energinet.dk, Fredericia (Denmark); Dong Energy A/S, Fredericia (Denmark); Skanska, Ballerup (Denmark); Balslev, Glostrup (Denmark); DATEA, Kgs. Lyngby (Denmark)
Country of Origin:
Denmark
Language:
Danish
Other Identifying Numbers:
Other: Contract FORSKEL-6416; TRN: DK1001196
Availability:
Also available at http://www.risoe.dtu.dk/rispubl/NEI/NEI-DK-5440.pdf; OSTI as DE01000230
Submitting Site:
DK
Size:
36 p. pages
Announcement Date:
Dec 21, 2010

Citation Formats

Pedersen, Thomas Emil. Experiment with flexible electric power consumption; Demonstrationsforsoeg med fleksibelt elforbrug. Denmark: N. p., 2009. Web.
Pedersen, Thomas Emil. Experiment with flexible electric power consumption; Demonstrationsforsoeg med fleksibelt elforbrug. Denmark.
Pedersen, Thomas Emil. 2009. "Experiment with flexible electric power consumption; Demonstrationsforsoeg med fleksibelt elforbrug." Denmark.
@misc{etde_1000230,
title = {Experiment with flexible electric power consumption; Demonstrationsforsoeg med fleksibelt elforbrug}
author = {Pedersen, Thomas Emil}
abstractNote = {The emergence of interactive meters with communication module has made it possible that electricity consumption at different customer segments can be activated in a new way of benefit for the customer, the electricity company and the system operator. In this demonstration project customer segment is larger commercial properties and public institutions. In conclusion, it is technically possible to manage and activate the potential for demand response within the segment of large office blocks and public buildings. Practical experiments have shown that it is more expensive to achieve flexibility in power consumption for older properties than for a newly built property. The economics of demand response within office buildings are currently (prices as of 2008) not so attractive for either the customer or the utility company in relation to the investments needed to be made at both the customer and the utility company to build an infrastructure. It should also be noted that there may be relatively much work involved in handling a lot of small systems compared to systems of large effects, for example 500 kW and more. It is therefore the more attractive systems within the industrial customer segments with plants as UPS systems, cooling systems in cold storage rooms and the like which has the potential of a size that should be ground-breaking by building an infrastructure to manage power demand response, so that it eventually becomes marginally cheaper also handle minor power effects like those in office buildings. (ln)}
place = {Denmark}
year = {2009}
month = {Sep}
}