TY - RPRT TI - Operation of Finnish nuclear power plants. Quarterly report 3rd, quarter 1995 AB - Quarterly Reports on the operation of Finnish nuclear power plants describe events and observations relating to nuclear and radiation safety which the Finnish Centre for Radiation and Nuclear Safety (STUK) considers safety significant. Safety improvements at the plants are also described. The Report includes a summary of the radiation safety of plant personnel and of the environment and tabulated data on the plants` production and load factors. Except for the annual maintenance outages of Loviisa plant units and for TVO II`s brief outage to repair a failed component, Finnish nuclear power plant units were in power operation in the third quarter of 1995. The load factor average of all plant units was 90.4 %. Events in this quarter were level 0 on the INES scale. Occupational doses and radioactive releases off-site were below authorised limits. Radioactive substances were measurable in samples collected around the plants in such quantities only as have no bearing on the radiation exposure of the population. (orig.) (4 figs., 4 tabs.). AU - "Sillanpaeae, T [ed.]" KW - "21 NUCLEAR POWER REACTORS AND ASSOCIATED PLANTS" KW - "REACTOR OPERATION" KW - "LOVIISA-1 REACTOR" KW - "LOVIISA-2 REACTOR" KW - "RADIATION PROTECTION" KW - "TVO-1 REACTOR" KW - "TVO-2 REACTOR" DO - https://doi.org/ UR - https://www.osti.gov/etdeweb/servlets/purl/373712 PB - CY - Finland PY - 1996 DA - 1996-05-01 LA - English J2 - [] VL - C1 - Finnish Centre for Radiation and Nuclear Safety (STUK), Helsinki (Finland) C2 - C3 - STUK-B-YTO-145 C4 - C5 - INIS; OSTI as DE97601639 L3 - Other Information: DN: Published also in Finnish as report number STUK-B-YTO--138.; PBD: May 1996 ER -