"TITLE","AUTHORS","SUBJECT","SUBJECT_RELATED","DESCRIPTION","PUBLISHER","AVAILABILITY","RESEARCH_ORG","SPONSORING_ORG","PUBLICATION_COUNTRY","PUBLICATION_DATE","CONTRIBUTING_ORGS","LANGUAGE","RESOURCE_TYPE","TYPE_QUALIFIER","JOURNAL_ISSUE","JOURNAL_VOLUME","RELATION","COVERAGE","FORMAT","IDENTIFIER","REPORT_NUMBER","DOE_CONTRACT_NUMBER","OTHER_IDENTIFIER","DOI","RIGHTS","ENTRY_DATE","OSTI_IDENTIFIER","PURL_URL" "Achievement report for fiscal 1999 on auxiliary New Sunshine Project. Development of coal hydrogasification technology (Survey and research on its social acceptability); 1999 nendo New Sunshine keikaku hojo jigyo seika hokokusho. Sekitan suiso tenka gaska gijutsu kaihatsu - Shakai tekigo sei ni kansuru chosa kenkyu","NONE","01 COAL, LIGNITE, AND PEAT; SUNSHINE PROJECT; COAL GASIFICATION; HYDROGENATION; SOCIAL IMPACT; COST BENEFIT ANALYSIS; LIQUEFIED NATURAL GAS; LIQUEFIED PETROLEUM GASES; COAL; SUPPLY AND DEMAND; PRICES; IMPORTS; SAUDI ARABIA; FEASIBILITY STUDIES","","With an objective to evaluate feasibility of practical use and economy of the coal hydrogasification technology (the ARCH process), survey and research have been performed. This paper summarizes the achievements in fiscal 1999. In the survey on the social acceptability, survey has been made on the future trend in the demand and supply and the price of LNG, LPG, and coal for hydrogasification. As a result, it was discovered that the price of LNG imported into Japan is determined as if linked with the crude oil price, and Saudi Arabia is the price leader of the LPG price. With respect to the survey on the possibility of international cooperation, surveys were conducted on the prospects of the long-term demand and supply in China, natural gas resources, and the demand and supply thereof. The feasibility study has estimated the product gas manufacturing cost after the process has been improved. In the trial calculation on the three-mode cost, it was discovered that, although the profit from byproducts is great, the BTX maximized mode causes the manufacturing cost to be higher by as much as 2 to 3 yen per Nm{sup 3} than that of other modes because of higher unit consumption in raw materials and higher construction cost. (NEDO)","","Available to ETDE participating countries only(see www.etde.org); commercial reproduction prohibited; OSTI as DE20303225","New Energy and Industrial Technology Development Organization, Tokyo (Japan)","","Japan","2000-03-01","","Japanese","Technical Report","","","","Other Information: PBD: Mar 2000","","Medium: ED; Size: 453 pages","","JP-NEDO-010019789","","TRN: JN0240372","https://doi.org/","","2018-03-06","20303225","https://www.osti.gov/etdeweb/servlets/purl/20303225"