TY - RPRT TI - Joint operation of the TSTA under the collaboration between JAERI and U.S.-DOE. TSTA extended loop operation with 100 grams of tritium on Apr. - May 1992 AB - An extended loop operation of the TSTA with the J-FCU was performed successfully with 100 grams of tritium on April-May 1992. One of the major purposes of this extended loop operation was to demonstrate stable control and safe operation of the entire TSTA during 25 days. This is one of the major milestones of the Collaborative Program on technology for fusion-fuel processing under the Annex IV between JAERI and US-DOE. From a technical point of view, this extended loop operation produced many highlights. Specially, it was noteworthy that the ISS with full four columns was controlled stably for 22 days. It was also noteworthy that the TSTA-FCU with magnesium bed and the J-FCU were first operated under the complete integrated TSTA loop with full (4) columns ISS and that both FCUs were processed simulated fusion-fuel exhaust with a various range of impurities stably and safely. This report describes the entire test plan and the brief test results. (author). AU - "Hayashi, Takumi" AU - "Nakamura, Hirofumi" AU - "Konishi, Satoshi [Japan Atomic Energy Research Inst., Naka, Ibaraki (Japan). Naka Fusion Research Establishment; and others]" KW - "70 PLASMA PHYSICS AND FUSION TECHNOLOGY" KW - "TRITIUM SYSTEMS TEST ASSEMBLY" KW - "THERMONUCLEAR REACTOR FUELING" KW - "TRITIUM" KW - "ISOTOPE SEPARATION" KW - "PALLADIUM" KW - "ELECTROLYTIC CELLS" KW - "OPERATION" KW - "VACUUM PUMPS" KW - "D-T REACTORS" KW - "IMPURITIES" KW - "SCHEDULES" KW - "TRITIUM RECOVERY" KW - "700460" KW - "HEATING AND FUELING SYSTEMS" KW - "FUELS" DO - https://doi.org/ UR - PB - CY - Japan PY - 1993 DA - 1993-03-01 LA - English J2 - [] VL - C1 - Japan Atomic Energy Research Inst., Tokyo (Japan) C2 - C3 - JAERI-M-93-083 C4 - C5 - OSTI; NTIS; INIS L3 - Other Information: PBD: Mar 1993 ER -