skip to main content
DOE Patents title logo U.S. Department of Energy
Office of Scientific and Technical Information

Title: Techniques for evaluating optimum data center operation

Abstract

Techniques for modeling a data center are provided. In one aspect, a method for determining data center efficiency is provided. The method includes the following steps. Target parameters for the data center are obtained. Technology pre-requisite parameters for the data center are obtained. An optimum data center efficiency is determined given the target parameters for the data center and the technology pre-requisite parameters for the data center.

Inventors:
; ;
Issue Date:
Research Org.:
International Business Machines Corp., Armonk, NY (United States)
Sponsoring Org.:
USDOE
OSTI Identifier:
1600413
Patent Number(s):
10,510,030
Application Number:
15/593,053
Assignee:
International Business Machines Corporation (Armonk, NY)
DOE Contract Number:  
EE00002897
Resource Type:
Patent
Resource Relation:
Patent File Date: 05/11/2017
Country of Publication:
United States
Language:
English
Subject:
97 MATHEMATICS AND COMPUTING; 32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATION

Citation Formats

Hamann, Hendrik F., Rodriguez, Sergio A. Bermudez, and Wehle, Hans-Dieter. Techniques for evaluating optimum data center operation. United States: N. p., 2019. Web.
Hamann, Hendrik F., Rodriguez, Sergio A. Bermudez, & Wehle, Hans-Dieter. Techniques for evaluating optimum data center operation. United States.
Hamann, Hendrik F., Rodriguez, Sergio A. Bermudez, and Wehle, Hans-Dieter. Tue . "Techniques for evaluating optimum data center operation". United States. https://www.osti.gov/servlets/purl/1600413.
@article{osti_1600413,
title = {Techniques for evaluating optimum data center operation},
author = {Hamann, Hendrik F. and Rodriguez, Sergio A. Bermudez and Wehle, Hans-Dieter},
abstractNote = {Techniques for modeling a data center are provided. In one aspect, a method for determining data center efficiency is provided. The method includes the following steps. Target parameters for the data center are obtained. Technology pre-requisite parameters for the data center are obtained. An optimum data center efficiency is determined given the target parameters for the data center and the technology pre-requisite parameters for the data center.},
doi = {},
journal = {},
number = ,
volume = ,
place = {United States},
year = {2019},
month = {12}
}

Patent:

Save / Share:

Works referenced in this record:

LIQUID COOLED DATA CENTER DESIGN SELECTION
patent-application, November 2013


Cooling infrastructure leveraging a combination of free and solar cooling
patent, September 2011


DATA CENTER CONTROL
patent-application, March 2011


Data center power management utilizing a power policy and a load factor
patent, August 2011


Emergency power settings for data-center facilities infrastructure event
patent, June 2012