StingRAY Failure Mode, Effects and Criticality Analysis: WEC Risk Registers
Abstract
Analysis method to systematically identify all potential failure modes and their effects on the Stingray WEC system. This analysis is incorporated early in the development cycle such that the mitigation of the identified failure modes can be achieved cost effectively and efficiently. The FMECA can begin once there is enough detail to functions and failure modes of a given system, and its interfaces with other systems. The FMECA occurs coincidently with the design process and is an iterative process which allows for design changes to overcome deficiencies in the analysis.Risk Registers for major subsystems completed according to the methodology described in "Failure Mode Effects and Criticality Analysis Risk Reduction Program Plan.pdf" document below, in compliance with the DOE Risk Management Framework developed by NREL.
- Authors:
- Publication Date:
- Other Number(s):
- 192
- DOE Contract Number:
- EE0007347
- Research Org.:
- Marine and Hydrokinetic Data Repository (MHKDR); Columbia Power Technologies, Inc.
- Sponsoring Org.:
- USDOE Office of Energy Efficiency and Renewable Energy (EERE), Wind and Water Technologies Office (EE-4W)
- Collaborations:
- Columbia Power Technologies, Inc.
- Subject:
- 16 Tidal and Wave Power
- Keywords:
- MHK; Marine; Hydrokinetic; energy; Renewable; Wave Energy Converter; Risk Register; FMECA; WEC; Hawaii; risk reduction; failure mode; criticality; cpwr; analysis; wave; mooring; hull; stingray; scada; pto; supervisory control and data acquisition; power take off; design; process; point; absorber; development; technology
- Geolocation:
- 22.709568364136,-153.85113125|18.833779157085,-153.85113125|18.833779157085,-159.9484401875|22.709568364136,-159.9484401875|22.709568364136,-153.85113125
- OSTI Identifier:
- 1415597
- DOI:
- https://doi.org/10.15473/1415597
- Project Location:
-
Citation Formats
Rhinefrank, Ken. StingRAY Failure Mode, Effects and Criticality Analysis: WEC Risk Registers. United States: N. p., 2016.
Web. doi:10.15473/1415597.
Rhinefrank, Ken. StingRAY Failure Mode, Effects and Criticality Analysis: WEC Risk Registers. United States. doi:https://doi.org/10.15473/1415597
Rhinefrank, Ken. 2016.
"StingRAY Failure Mode, Effects and Criticality Analysis: WEC Risk Registers". United States. doi:https://doi.org/10.15473/1415597. https://www.osti.gov/servlets/purl/1415597. Pub date:Mon Jul 25 00:00:00 EDT 2016
@article{osti_1415597,
title = {StingRAY Failure Mode, Effects and Criticality Analysis: WEC Risk Registers},
author = {Rhinefrank, Ken},
abstractNote = {Analysis method to systematically identify all potential failure modes and their effects on the Stingray WEC system. This analysis is incorporated early in the development cycle such that the mitigation of the identified failure modes can be achieved cost effectively and efficiently. The FMECA can begin once there is enough detail to functions and failure modes of a given system, and its interfaces with other systems. The FMECA occurs coincidently with the design process and is an iterative process which allows for design changes to overcome deficiencies in the analysis.Risk Registers for major subsystems completed according to the methodology described in "Failure Mode Effects and Criticality Analysis Risk Reduction Program Plan.pdf" document below, in compliance with the DOE Risk Management Framework developed by NREL.},
doi = {10.15473/1415597},
journal = {},
number = ,
volume = ,
place = {United States},
year = {Mon Jul 25 00:00:00 EDT 2016},
month = {Mon Jul 25 00:00:00 EDT 2016}
}