skip to main content
OSTI.GOV title logo U.S. Department of Energy
Office of Scientific and Technical Information

Title: A new 40 MA ranchero explosive pulsed power system

Conference ·

We are developing a new high explosive pulsed power (HEPP) system based on the 1.4 m long Ranchero generator which was developed in 1999 for driving solid density z-pinch loads. The new application requires approximately 40 MA to implode similar liners, but the liners cannot tolerate the 65 {micro}s, 3 MA current pulse associated with delivering the initial magnetic flux to the 200 nH generator. To circumvent this problem, we have designed a system with an internal start switch and four explosively formed fuse (EFF) opening switches. The integral start switch is installed between the output glide plane and the armature. It functions in the same manner as a standard input crowbar switch when armature motion begins, but initially isolates the load. The circuit is completed during the flux loading phase using post hole convolutes. Each convolute attaches the inner (coaxial) output transmission line to the outside of the outer coax through a penetration of the outer coaxial line. The attachment is made with the conductor of an EFF at each location. The EFFs conduct 0.75 MA each, and are actuated just after the internal start switch connects to the load. EFFs operating at these parameters have been tested in the past. The post hole convolutes must withstand as much as 80 kV at peak dl/dt during the Ranchero load current pulse. We describe the design of this new HEPP system in detail, and give the experimental results available at conference time. In addition, we discuss the work we are doing to test the upper current limits of a single standard size Ranchero module. Calculations have suggested that the generator could function at up to {approx}120 MA, the rule of thumb we follow (1 MA/cm) suggests 90 MA, and simple flux compression calculations, along with the {approx}4 MA seed current available from our capacitor bank, suggests 118 MA is the currently available upper limit.

Research Organization:
Los Alamos National Laboratory (LANL), Los Alamos, NM (United States)
Sponsoring Organization:
USDOE
DOE Contract Number:
AC52-06NA25396
OSTI ID:
990322
Report Number(s):
LA-UR-09-04121; LA-UR-09-4121; TRN: US201020%%336
Resource Relation:
Conference: IEEE Pulsed Power Conference ; June 29, 2009 ; Washington, DC, USA
Country of Publication:
United States
Language:
English