Title: RECOMMENDATIONS FOR UO3 PLANT BIOASSAY

Abstract

Alternative urine bioassay programs are described for application with decontamination and decommissioning activities at the Hanford UO3 Plant. The alternatives are based on quarterly or monthly urine bioassay for recycled uranium, assuming multiple acute inhalation intakes of recycled uranium occurring over a year. The inhalations are assumed to be 5µm AMAD particles of 80% absorption type F and 20% absorption type M. Screening levels, expressed as daily uranium mass excretion rates in urine, and the actions associated with these levels are provided for both quarterly and monthly sampling frequencies.

Authors:
Publication Date:
Research Org.:
Pacific Northwest National Lab. (PNNL), Richland, WA (United States)
Sponsoring Org.:
USDOE
OSTI Identifier:
983733
Report Number(s):
PNNL-19550
TRN: US1005027
DOE Contract Number:
AC05-76RL01830
Resource Type:
Technical Report
Country of Publication:
United States
Language:
English
Subject:
12 MANAGEMENT OF RADIOACTIVE WASTES, AND NON-RADIOACTIVE WASTES FROM NUCLEAR FACILITIES; ABSORPTION; BIOASSAY; DECOMMISSIONING; DECONTAMINATION; EXCRETION; INHALATION; LEVELS; MASS; PARTICLES; PLANTS; RECOMMENDATIONS; SAMPLING; SCREENING; URANIUM; URINE; USES; urine bioassay; bioassay monitoring; urinalysis; excretion rates; committed effective dose

Citation Formats

Carbaugh, Eugene H. RECOMMENDATIONS FOR UO3 PLANT BIOASSAY. United States: N. p., 2010. Web. doi:10.2172/983733.
Carbaugh, Eugene H. RECOMMENDATIONS FOR UO3 PLANT BIOASSAY. United States. doi:10.2172/983733.
Carbaugh, Eugene H. Mon . "RECOMMENDATIONS FOR UO3 PLANT BIOASSAY". United States. doi:10.2172/983733. https://www.osti.gov/servlets/purl/983733.
@article{osti_983733,
title = {RECOMMENDATIONS FOR UO3 PLANT BIOASSAY},
author = {Carbaugh, Eugene H.},
abstractNote = {Alternative urine bioassay programs are described for application with decontamination and decommissioning activities at the Hanford UO3 Plant. The alternatives are based on quarterly or monthly urine bioassay for recycled uranium, assuming multiple acute inhalation intakes of recycled uranium occurring over a year. The inhalations are assumed to be 5µm AMAD particles of 80% absorption type F and 20% absorption type M. Screening levels, expressed as daily uranium mass excretion rates in urine, and the actions associated with these levels are provided for both quarterly and monthly sampling frequencies.},
doi = {10.2172/983733},
journal = {},
number = ,
volume = ,
place = {United States},
year = {Mon Jul 12 00:00:00 EDT 2010},
month = {Mon Jul 12 00:00:00 EDT 2010}
}

Technical Report:

Save / Share:
  • This report describes the conceptual framework and methodology required for proper assessments of the occurrences, magnitudes, and retentions of internal depositions of radionuclides in people. This report is a basic text to acquaint the reader with the various elements of a successful bioassay program and their limitations for health protection purposes. General information on bioassay procedures is given, as is guidance on critical elements of a bioassay program such as when bioassay is needed, who should participate, how frequently sampling should occur, how the results might be interpreted, and the limitations of bioassay data for health protection purposes. Basic principlesmore » are stressed along with general guidance for their application. Bioassay procedures, models, and interpretations can differ for each radionuclide. No attempt has been made to incorporate radionuclide-specific recommendations or models in this report. 100 refs., 6 figs., 7 tabs.« less
  • Since coal beneficiation is a new area of environmental research, little, if any, information has been published on the toxic effects of coal waste water and waste material from processing plants. In an attempt to furnish information static bioassay tests were conducted under controlled laboratory conditions with coal waste water and treated water containing crushed ISU coal using channel catfish, Ictalurus punctatus, as test species at temperature of 22/sup 0/C for 96 hours. Bioassay tests using coal waste water and using treated water containing crushed coal resulted in 100 percent mortality in the 60 percent, 100 percent, filtered (100 percent)more » concentrations and in the 200 mg coal/l, 20 mg coal/l, and 7.2 mg coal/l concentrations at pH below 5.0. No mortality occurred in the lower concentrations or on any other tests. No large amounts of metallic ions were found in any of the samples analyzed which could contribute to the mortality observed. Increased concentration levels of coal waste water or crushed coal added to treated water appeared to increase mortality by acting upon dissolved oxygen and/or pH. Higher concentration levels usually reduced survival time in those tests in which mortalities occurred. Test solutions in which pH were lowered below 5.0 by adding sulfuric acid resulted in mortalities at higher concentrations of added crushed coal.« less
  • The FVP used contaminated sediment dredged from a project in Black Rock Harbor (BRH), Bridgeport, Conn. Use of a single highly contaminated dredged material afforded a unique opportunity to evaluate results of disposal under three different disposal alternatives: open water, intertidal (wetland), and upland. Upland and wetland sites were designed to meet surface area, elevation, and operational requirements for FVP contaminant mobility studies. Designs for sedimentation and storage followed recently developed Corps procedures, and the resulting site performance fulfilled design objectives. Provisions were made to ensure that essentially the same dredged material was placed in the open-water, upland, and wetlandmore » sites. The upland and wetland sites, constructed within protected areas using conventional construction techniques, were filled hydraulically from barges. The filling operation provided conditions typical of confined dredged material disposal operations. Following filling, the weirs at both sites were managed to allow free drainage of surface water as the fill stabilized through consolidation. Within approximately 9 months, the upland and wetland substrates had stabilized at the desired surface elevations.« less
  • Recently, a solid-phase plant bioassay was developed to test sediment for contaminants that are potentially phytotoxic and may be bioaccumulated by plants (Folsom and Lee 1981a; Folsom, Lee, and Bates 1981). The solid-phase plant bioassay was shown to be an excellent tool for predicting whether or not contaminants (e.g., zinc and cadmium) were potentially bioaccumulated by the saltwater plant S. alterniflora. Folsom and Lee (1981a) pointed out, however, that the DTPA extraction data indicated that plant uptake from air-dried oxidized saltwater sediment would be substantially greater than from the same saltwater sediment under flooded reduced conditions. In addition, they suspectedmore » greater plant uptake once the excess salts were leached out and the sediments were dried. This technical note reports results of modifications to the original solid-phase plant bioassay to pursue this assumption.« less
  • This report presents the results of Task I of Phase I in the form of a Conceptual Design and Evaluation of Commercial Plant report. The report is presented in four volumes as follows: I - Executive Summary, II - Commercial Plant Conceptual Design, III - Economic Analyses, IV - Demonstration Plant Recommendations. Volume IV presents the recommendations and rationale for the demonstration plant as well as some additional recommendations regarding pilot plant, commercial plants, and user considerations. The demonstration plant recommendations include identification of objectives of the demonstration plant and a discussion of proposed plant size. Proposed plant configuration ismore » discussed for individual plant sections, for the higher pressure gasifier operation option which affect a number of plant sections, and for the IFG Demo Plant - Customer Configuration which discusses options external to the plant for meeting 365 day load requirements and for tracking load. Approximate capital and operating cost impacts of the recommendations are presented.« less