Title: BPA-Solicited Technical Review of "Echo Meadows Project Winter Artificial Recharge: Final Report for 2001 Baseline", Technical Report 2004.

Abstract

The purpose of this report was to provide, at BPA's request, a technical review of interim products received for Project 2001-015-00 under contract 6925. BPA sometimes solicits technical reviews for Fish and Wildlife products or issues where outside expertise is required. External review of complex project deliverables assures BPA as a funding agency that the contractor is continuing with scientifically-credible experimental techniques envisioned in the original proposal. If the project's methodology proves feasible, there could be potential applications beyond the project area to similar situations in the Columbia Basin. The Experiment involves artificial flooding during high flow periods and a determination of the portion of the return flows that end up in the Umatilla River during low flow months and within acceptable water quality parameters (e.g., low temperature, few contaminants). Flooding could be a critical water source for aquatic organisms at times of the year when flows in the lower reaches of the Umatilla River are low and water is warmer than would be desired. The experiment was proposed to test whether 'this process, recharges the shallow aquifers of the old flood plain, for natural filtration through the alluvial soils as it returns to the Umatilla River, cleaner and coolermore » (about 50 degree Fahrenheit) five to six month later (about July and August) substantially cooling the river and [making it] more beneficial to anadromous [fish]'. A substantial amount of preliminary data had been collected and preliminary results were submitted in an interim report 'Echo Meadows Project Winter Artificial Recharge: Final Report for 2001 Baseline (December 2002)'. A substantial amount of addition funding was provided for the last cycle of flooding (Phases II) and final analyses of the full compliment of data collected over the life of the contract (Phase III). Third party scientific review may assist the contractor in producing a higher quality Final Report with completion of the final 2 phases of the project.« less

Authors:
Publication Date:
Research Org.:
Bonneville Power Administration (BPA), Portland, OR (United States)
Sponsoring Org.:
USDOE
OSTI Identifier:
963087
Report Number(s):
DOE/BP-00015240-1
TRN: US200917%%476
DOE Contract Number:  
15240
Resource Type:
Technical Report
Country of Publication:
United States
Language:
English
Subject:
13 HYDRO ENERGY; AQUATIC ORGANISMS; AQUIFERS; CONTRACTORS; FILTRATION; FLOODS; HEAT EXCHANGERS; RIVERS; SOILS; WATER QUALITY

Citation Formats

Morgan, David. BPA-Solicited Technical Review of "Echo Meadows Project Winter Artificial Recharge: Final Report for 2001 Baseline", Technical Report 2004.. United States: N. p., 2004. Web. doi:10.2172/963087.
Morgan, David. BPA-Solicited Technical Review of "Echo Meadows Project Winter Artificial Recharge: Final Report for 2001 Baseline", Technical Report 2004.. United States. doi:10.2172/963087.
Morgan, David. Sun . "BPA-Solicited Technical Review of "Echo Meadows Project Winter Artificial Recharge: Final Report for 2001 Baseline", Technical Report 2004.". United States. doi:10.2172/963087. https://www.osti.gov/servlets/purl/963087.
@article{osti_963087,
title = {BPA-Solicited Technical Review of "Echo Meadows Project Winter Artificial Recharge: Final Report for 2001 Baseline", Technical Report 2004.},
author = {Morgan, David},
abstractNote = {The purpose of this report was to provide, at BPA's request, a technical review of interim products received for Project 2001-015-00 under contract 6925. BPA sometimes solicits technical reviews for Fish and Wildlife products or issues where outside expertise is required. External review of complex project deliverables assures BPA as a funding agency that the contractor is continuing with scientifically-credible experimental techniques envisioned in the original proposal. If the project's methodology proves feasible, there could be potential applications beyond the project area to similar situations in the Columbia Basin. The Experiment involves artificial flooding during high flow periods and a determination of the portion of the return flows that end up in the Umatilla River during low flow months and within acceptable water quality parameters (e.g., low temperature, few contaminants). Flooding could be a critical water source for aquatic organisms at times of the year when flows in the lower reaches of the Umatilla River are low and water is warmer than would be desired. The experiment was proposed to test whether 'this process, recharges the shallow aquifers of the old flood plain, for natural filtration through the alluvial soils as it returns to the Umatilla River, cleaner and cooler (about 50 degree Fahrenheit) five to six month later (about July and August) substantially cooling the river and [making it] more beneficial to anadromous [fish]'. A substantial amount of preliminary data had been collected and preliminary results were submitted in an interim report 'Echo Meadows Project Winter Artificial Recharge: Final Report for 2001 Baseline (December 2002)'. A substantial amount of addition funding was provided for the last cycle of flooding (Phases II) and final analyses of the full compliment of data collected over the life of the contract (Phase III). Third party scientific review may assist the contractor in producing a higher quality Final Report with completion of the final 2 phases of the project.},
doi = {10.2172/963087},
journal = {},
number = ,
volume = ,
place = {United States},
year = {2004},
month = {2}
}

Technical Report:

Save / Share: