Title: Hangman Restoration Project, Annual Report 2002-2003.

Abstract

Progress has been made in defining the level of work that needs to be accomplished in the Hangman Watershed in order to restore a viable riparian system and hydrology. The end goal is to use wildlife habitat to protect streams and provide water for instream fish habitats. In order to define the most expedient means of attaining that goal an Instream Flow/Watershed Hydrology Study was initiated. The study is intended to be comprehensive in order to determine the potential of increasing base flow with Hangman Watershed Streams and predict available fish habitats for the range of flow level possibilities. The Study Plan and work for the first field season was contracted and the Plan and end of field season reports are included with this Annual Report. The initial draft of the wildlife portion of the Monitoring and Evaluation Plan was completed and presented to the Columbia Basin Fish and Wildlife Authority Wildlife Committee. The Committee felt that the Basin Hydrology Study needed to be closer to completion before the bulk of wildlife monitoring should be implemented. The extent of the landscape that must be restored in order to facilitate the needed stream flows may not be large enough to affectmore » the population levels of the Plan's target species. The main result of the Committee review of the Monitoring and Evaluation Plan however, was that since the Hangman Restoration Project is not a HU driven wildlife mitigation project than the Wildlife Committee does not have a role to play since their focus is wildlife HU crediting projects. Further work on the wildlife portion of the Monitoring and Evaluation Plan is suspended until the crediting issues surrounding the Hangman Restoration Project are settled. Certain aspects of the Plan, such as the land bird, amphibian, reptile and beaver monitoring can be implemented in the spring of the coming year because monitoring these species and groups needs to be accomplished regardless of crediting status and baseline data is needed for these. Data from the Hangman Creek Watershed from portions upstream and east of the Coeur d'Alene Indian Reservation were included in the Second Iteration of the Habitat Prioritization Plan. These data were gathered both by the Coeur d'Alene Tribe and Idaho's Department of Environmental Quality. The addition of this portion of the Watershed in the Prioritization Plan fills a gap that the lack of data left in the first draft of the Plan. The streams in these upper headwaters support remnant salmonid populations and are close enough to be integrated with the streams and trout populations on the Reservation. The addition of this area strengthens the base from which the Hangman Restoration Project can work to secure and expand resident fish populations. An extensive 2-year search for historic photos of the upper portion of the Hangman Watershed was completed during this annual funding cycle. The disappointing result is that few photographs were acquired. One excellent panoramic view of the Upper Hangman Watershed from Tekoa Mountain was recovered and photos of this view were taken for comparison. The task of finding historic photos has been removed from future Scopes of Work, however search for photos will continue as part of the Project's public outreach. The notable exception to the lack of historic photos is the purchase, digitizing and GIS registry of 1947 aerial photo coverage of the entire Hangman Creek Watershed east of the Washington/Idaho State Boarder. In addition, 1933 aerial photo coverage of most of this same area is being registered to our GIS system. These 1933 photos were available to the Tribe prior to the initiation of this Project; however these photos are being registered partly as a result of requests made from this Project. The process of developing a map of potential vegetation types for the Hangman Watershed has benefited from establishment of an Interagency Agreement with the U.S. Geologic Survey to hire a Scientific Advisor. The Scientific Advisor has assisted with the design of a scheme to sample remnant native vegetation within and close to the Hangman Watershed and will assist in using the acquired data to develop and test a multivariate model that predicts potential vegetation for any given site within the Hangman Watershed. This information is essential in modeling the potential stream flows within the watershed and for identifying the appropriate vegetation types to manage for in any restoration project.In spite of the progress made during this last year, this Project was not able to accomplish the primary tasks of acquiring management rights to properties that offer the greatest potential to protect and restore the streams and fisheries within the Hangman Watershed. Appraisals, hazardous materials surveys, and cultural resource inventories were completed on 3 properties that have been identified as priority parcels to acquire and restore to their biotic potential.« less

Authors:
Publication Date:
Research Org.:
Bonneville Power Administration (BPA), Portland, OR (United States)
Sponsoring Org.:
USDOE
OSTI Identifier:
962832
Report Number(s):
DOE/BP-00009210-2
TRN: US200917%%112
DOE Contract Number:  
9210
Resource Type:
Technical Report
Country of Publication:
United States
Language:
English
Subject:
13 HYDRO ENERGY; CULTURAL RESOURCES; ENVIRONMENTAL QUALITY; FISHERIES; GEOGRAPHIC INFORMATION SYSTEMS; GEOLOGIC SURVEYS; HABITAT; HAZARDOUS MATERIALS; HYDROLOGY; INVENTORIES; MITIGATION; MONITORING; SEASONS; STREAMS; TARGETS; TROUT; WATERSHEDS

Citation Formats

Tribe, Coeur d'Alene. Hangman Restoration Project, Annual Report 2002-2003.. United States: N. p., 2003. Web. doi:10.2172/962832.
Tribe, Coeur d'Alene. Hangman Restoration Project, Annual Report 2002-2003.. United States. https://doi.org/10.2172/962832
Tribe, Coeur d'Alene. 2003. "Hangman Restoration Project, Annual Report 2002-2003.". United States. https://doi.org/10.2172/962832. https://www.osti.gov/servlets/purl/962832.
@article{osti_962832,
title = {Hangman Restoration Project, Annual Report 2002-2003.},
author = {Tribe, Coeur d'Alene},
abstractNote = {Progress has been made in defining the level of work that needs to be accomplished in the Hangman Watershed in order to restore a viable riparian system and hydrology. The end goal is to use wildlife habitat to protect streams and provide water for instream fish habitats. In order to define the most expedient means of attaining that goal an Instream Flow/Watershed Hydrology Study was initiated. The study is intended to be comprehensive in order to determine the potential of increasing base flow with Hangman Watershed Streams and predict available fish habitats for the range of flow level possibilities. The Study Plan and work for the first field season was contracted and the Plan and end of field season reports are included with this Annual Report. The initial draft of the wildlife portion of the Monitoring and Evaluation Plan was completed and presented to the Columbia Basin Fish and Wildlife Authority Wildlife Committee. The Committee felt that the Basin Hydrology Study needed to be closer to completion before the bulk of wildlife monitoring should be implemented. The extent of the landscape that must be restored in order to facilitate the needed stream flows may not be large enough to affect the population levels of the Plan's target species. The main result of the Committee review of the Monitoring and Evaluation Plan however, was that since the Hangman Restoration Project is not a HU driven wildlife mitigation project than the Wildlife Committee does not have a role to play since their focus is wildlife HU crediting projects. Further work on the wildlife portion of the Monitoring and Evaluation Plan is suspended until the crediting issues surrounding the Hangman Restoration Project are settled. Certain aspects of the Plan, such as the land bird, amphibian, reptile and beaver monitoring can be implemented in the spring of the coming year because monitoring these species and groups needs to be accomplished regardless of crediting status and baseline data is needed for these. Data from the Hangman Creek Watershed from portions upstream and east of the Coeur d'Alene Indian Reservation were included in the Second Iteration of the Habitat Prioritization Plan. These data were gathered both by the Coeur d'Alene Tribe and Idaho's Department of Environmental Quality. The addition of this portion of the Watershed in the Prioritization Plan fills a gap that the lack of data left in the first draft of the Plan. The streams in these upper headwaters support remnant salmonid populations and are close enough to be integrated with the streams and trout populations on the Reservation. The addition of this area strengthens the base from which the Hangman Restoration Project can work to secure and expand resident fish populations. An extensive 2-year search for historic photos of the upper portion of the Hangman Watershed was completed during this annual funding cycle. The disappointing result is that few photographs were acquired. One excellent panoramic view of the Upper Hangman Watershed from Tekoa Mountain was recovered and photos of this view were taken for comparison. The task of finding historic photos has been removed from future Scopes of Work, however search for photos will continue as part of the Project's public outreach. The notable exception to the lack of historic photos is the purchase, digitizing and GIS registry of 1947 aerial photo coverage of the entire Hangman Creek Watershed east of the Washington/Idaho State Boarder. In addition, 1933 aerial photo coverage of most of this same area is being registered to our GIS system. These 1933 photos were available to the Tribe prior to the initiation of this Project; however these photos are being registered partly as a result of requests made from this Project. The process of developing a map of potential vegetation types for the Hangman Watershed has benefited from establishment of an Interagency Agreement with the U.S. Geologic Survey to hire a Scientific Advisor. The Scientific Advisor has assisted with the design of a scheme to sample remnant native vegetation within and close to the Hangman Watershed and will assist in using the acquired data to develop and test a multivariate model that predicts potential vegetation for any given site within the Hangman Watershed. This information is essential in modeling the potential stream flows within the watershed and for identifying the appropriate vegetation types to manage for in any restoration project.In spite of the progress made during this last year, this Project was not able to accomplish the primary tasks of acquiring management rights to properties that offer the greatest potential to protect and restore the streams and fisheries within the Hangman Watershed. Appraisals, hazardous materials surveys, and cultural resource inventories were completed on 3 properties that have been identified as priority parcels to acquire and restore to their biotic potential.},
doi = {10.2172/962832},
url = {https://www.osti.gov/biblio/962832}, journal = {},
number = ,
volume = ,
place = {United States},
year = {Wed Oct 01 00:00:00 EDT 2003},