Title: Lessons Learned in Risk Management on NCSX

Abstract

The National Compact Stellarator Experiment (NCSX) was designed to test physics principles of an innovative stellarator design developed by the Princeton Plasma Physics Laboratory and Oak Ridge National Laboratory. Construction of some of the major components and sub-assemblies was completed, but the estimated cost and schedule for completing the project grew as the technical requirements and risks became better understood, leading to its cancellation in 2008. The project's risks stemmed from its technical challenges, primarily the complex component geometries and tight tolerances that were required. The initial baseline, established in 2004, was supported by a risk management plan and risk-based contingencies, both of which proved to be inadequate. Technical successes were achieved in the construction of challenging components and subassemblies, but cost and schedule growth was experienced. As part of an effort to improve project performance, a new risk management program was devised and implemented in 2007-08. It led to a better understanding of project risks, a sounder basis for contingency estimates, and improved management tools. Although the risks ultimately were unacceptable to the sponsor, valuable lessons in risk management were learned through the experiences with the NCSX project.

Authors:
; ; ; ; ;
Publication Date:
Research Org.:
Princeton Plasma Physics Lab. (PPPL), Princeton, NJ (United States)
Sponsoring Org.:
USDOE Office of Science (SC)
OSTI Identifier:
960218
Report Number(s):
PPPL-4427
TRN: US0903064
DOE Contract Number:  
DE-ACO2-09CH11466
Resource Type:
Technical Report
Country of Publication:
United States
Language:
English
Subject:
70 PLASMA PHYSICS AND FUSION TECHNOLOGY; CANCELLATION; CONSTRUCTION; DESIGN; MANAGEMENT; ORNL; PERFORMANCE; PHYSICS; PLASMA; SCHEDULES; STELLARATORS; Program Management; Project Summaries, NCSX; Stellerators; Engineering; Risk Management

Citation Formats

Neilson, G. H., Gruber, C. O., Harris, J. H., Rej, D. J., Simmons, R. T., and Strykowsky, R. L. Lessons Learned in Risk Management on NCSX. United States: N. p., 2009. Web. doi:10.2172/960218.
Neilson, G. H., Gruber, C. O., Harris, J. H., Rej, D. J., Simmons, R. T., & Strykowsky, R. L. Lessons Learned in Risk Management on NCSX. United States. doi:10.2172/960218.
Neilson, G. H., Gruber, C. O., Harris, J. H., Rej, D. J., Simmons, R. T., and Strykowsky, R. L. Tue . "Lessons Learned in Risk Management on NCSX". United States. doi:10.2172/960218. https://www.osti.gov/servlets/purl/960218.
@article{osti_960218,
title = {Lessons Learned in Risk Management on NCSX},
author = {Neilson, G. H. and Gruber, C. O. and Harris, J. H. and Rej, D. J. and Simmons, R. T. and Strykowsky, R. L.},
abstractNote = {The National Compact Stellarator Experiment (NCSX) was designed to test physics principles of an innovative stellarator design developed by the Princeton Plasma Physics Laboratory and Oak Ridge National Laboratory. Construction of some of the major components and sub-assemblies was completed, but the estimated cost and schedule for completing the project grew as the technical requirements and risks became better understood, leading to its cancellation in 2008. The project's risks stemmed from its technical challenges, primarily the complex component geometries and tight tolerances that were required. The initial baseline, established in 2004, was supported by a risk management plan and risk-based contingencies, both of which proved to be inadequate. Technical successes were achieved in the construction of challenging components and subassemblies, but cost and schedule growth was experienced. As part of an effort to improve project performance, a new risk management program was devised and implemented in 2007-08. It led to a better understanding of project risks, a sounder basis for contingency estimates, and improved management tools. Although the risks ultimately were unacceptable to the sponsor, valuable lessons in risk management were learned through the experiences with the NCSX project.},
doi = {10.2172/960218},
journal = {},
number = ,
volume = ,
place = {United States},
year = {Tue Jul 21 00:00:00 EDT 2009},
month = {Tue Jul 21 00:00:00 EDT 2009}
}

Technical Report:

Save / Share: