Title: Maintenance Action Readiness Assessment Plan for Waste Area Grouping 1 inactive Tanks 3001-B, 3004-B, T-30, and 3013 at Oak Ridge National Laboratory, Oak Ridge, Tennessee

Abstract

This Readiness Assessment Plan has been prepared to document operational readiness for the maintenance action consisting of remediation of four inactive liquid low-level radioactive tanks in Waste Area Grouping 1 at Oak Ridge National Laboratory. The four tanks to be remediated are Tanks 3001-B, 3004-B, T-30, and 3013. Tanks 3001-B, 3004-B, and T-30 will be removed from the ground. Because of logistical issues associated with excavation and site access, Tank 3013 will be grouted in place and permanently closed. This project is being performed as a maintenance action rather than an action under the Comprehensive Environmental Response, Compensation, and Liability Act, because the risk to human health and environment is well below the US Environmental Protection Agency`s level of concern. The decision to proceed as a maintenance action was documented by an interim action proposed plan, which is included in the administrative record. A Readiness Assessment Team has been assembled to review the criteria deemed necessary to conduct the remediation tasks. These criteria include approval of all plans, acquisition of needed equipment, completion of personnel training, and coordination with plant health and safety personnel. Once the criteria have been met and documented, the task will begin. The readiness assessment ismore » expected to be completed by late July 1995, and the task will begin thereafter.« less

Publication Date:
Research Org.:
Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States); CDM Federal Programs Corp., Oak Ridge, TN (United States)
Sponsoring Org.:
USDOE, Washington, DC (United States)
OSTI Identifier:
95215
Report Number(s):
ORNL/ER-318
ON: DE95016169; TRN: 95:018621
DOE Contract Number:  
AC05-84OR21400
Resource Type:
Technical Report
Resource Relation:
Other Information: PBD: Jul 1995
Country of Publication:
United States
Language:
English
Subject:
05 NUCLEAR FUELS; ORNL; STORAGE FACILITIES; RADIOACTIVE WASTE STORAGE; LOW-LEVEL RADIOACTIVE WASTES; REMEDIAL ACTION; TANKS; REMOVAL; RISK ASSESSMENT; UNDERGROUND STORAGE

Citation Formats

. Maintenance Action Readiness Assessment Plan for Waste Area Grouping 1 inactive Tanks 3001-B, 3004-B, T-30, and 3013 at Oak Ridge National Laboratory, Oak Ridge, Tennessee. United States: N. p., 1995. Web. doi:10.2172/95215.
. Maintenance Action Readiness Assessment Plan for Waste Area Grouping 1 inactive Tanks 3001-B, 3004-B, T-30, and 3013 at Oak Ridge National Laboratory, Oak Ridge, Tennessee. United States. https://doi.org/10.2172/95215
. 1995. "Maintenance Action Readiness Assessment Plan for Waste Area Grouping 1 inactive Tanks 3001-B, 3004-B, T-30, and 3013 at Oak Ridge National Laboratory, Oak Ridge, Tennessee". United States. https://doi.org/10.2172/95215. https://www.osti.gov/servlets/purl/95215.
@article{osti_95215,
title = {Maintenance Action Readiness Assessment Plan for Waste Area Grouping 1 inactive Tanks 3001-B, 3004-B, T-30, and 3013 at Oak Ridge National Laboratory, Oak Ridge, Tennessee},
author = {},
abstractNote = {This Readiness Assessment Plan has been prepared to document operational readiness for the maintenance action consisting of remediation of four inactive liquid low-level radioactive tanks in Waste Area Grouping 1 at Oak Ridge National Laboratory. The four tanks to be remediated are Tanks 3001-B, 3004-B, T-30, and 3013. Tanks 3001-B, 3004-B, and T-30 will be removed from the ground. Because of logistical issues associated with excavation and site access, Tank 3013 will be grouted in place and permanently closed. This project is being performed as a maintenance action rather than an action under the Comprehensive Environmental Response, Compensation, and Liability Act, because the risk to human health and environment is well below the US Environmental Protection Agency`s level of concern. The decision to proceed as a maintenance action was documented by an interim action proposed plan, which is included in the administrative record. A Readiness Assessment Team has been assembled to review the criteria deemed necessary to conduct the remediation tasks. These criteria include approval of all plans, acquisition of needed equipment, completion of personnel training, and coordination with plant health and safety personnel. Once the criteria have been met and documented, the task will begin. The readiness assessment is expected to be completed by late July 1995, and the task will begin thereafter.},
doi = {10.2172/95215},
url = {https://www.osti.gov/biblio/95215}, journal = {},
number = ,
volume = ,
place = {United States},
year = {Sat Jul 01 00:00:00 EDT 1995},
month = {Sat Jul 01 00:00:00 EDT 1995}
}