Anthrax Sampling and Decontamination: Technology Trade-Offs
The goal of this project was to answer the following questions concerning response to a future anthrax release (or suspected release) in a building: 1. Based on past experience, what rules of thumb can be determined concerning: (a) the amount of sampling that may be needed to determine the extent of contamination within a given building; (b) what portions of a building should be sampled; (c) the cost per square foot to decontaminate a given type of building using a given method; (d) the time required to prepare for, and perform, decontamination; (e) the effectiveness of a given decontamination method in a given type of building? 2. Based on past experience, what resources will be spent on evaluating the extent of contamination, performing decontamination, and assessing the effectiveness of the decontamination in abuilding of a given type and size? 3. What are the trade-offs between cost, time, and effectiveness for the various sampling plans, sampling methods, and decontamination methods that have been used in the past?
- Research Organization:
- Lawrence Berkeley National Lab. (LBNL), Berkeley, CA (United States)
- Sponsoring Organization:
- Environmental Energy Technologies Division
- DOE Contract Number:
- DE-AC02-05CH11231
- OSTI ID:
- 948503
- Report Number(s):
- LBNL-1519E; TRN: US200908%%36
- Country of Publication:
- United States
- Language:
- English
Similar Records
Session 70 - Panel: Consequence Management of a Radiological Dispersion Device
Validation of Statistical Sampling Algorithms in Visual Sample Plan (VSP): Summary Report