Title: Commissioning Experience of SNS

Abstract

The Spallation Neutron Source accelerator complex consists of a 2.5 MeV H{sup -} front-end injector system, a 186 MeV normal-conducting linear accelerator, a 1 GeV superconducting linear accelerator, an accumulator ring, and associated beam transport lines. The linac was commissioned in five discrete runs, starting in 2002 and completed in 2005. The accumulator ring and associated beam transport lines were commissioned in two runs in January-February and April 2006. With the completed commissioning of the SNS accelerator, the facility has begun initial low-power operations. In the course of beam commissioning, most beam performance parameters and beam intensity goals have been achieved at low duty factor. A number of beam dynamics measurements have been performed, including emittance evolution, transverse coupling in the ring, beam instability thresholds, and beam distributions on the target. The commissioning results, achieved beam performance and initial operating experience of the SNS linac will be presented.

Authors:
 [1]
  1. ORNL
Publication Date:
Research Org.:
Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States). Spallation Neutron Source (SNS)
Sponsoring Org.:
USDOE Office of Science (SC)
OSTI Identifier:
932123
DOE Contract Number:
DE-AC05-00OR22725
Resource Type:
Conference
Resource Relation:
Conference: Asian Particle Accelerator Conference, Indore, India, 20070129, 20070129
Country of Publication:
United States
Language:
English
Subject:
43 PARTICLE ACCELERATORS; ACCELERATORS; BEAM DYNAMICS; BEAM TRANSPORT; COMMISSIONING; INSTABILITY; LINEAR ACCELERATORS; NEUTRON SOURCES; PERFORMANCE; SPALLATION

Citation Formats

Plum, Michael A. Commissioning Experience of SNS. United States: N. p., 2007. Web.
Plum, Michael A. Commissioning Experience of SNS. United States.
Plum, Michael A. Sun . "Commissioning Experience of SNS". United States. doi:.
@article{osti_932123,
title = {Commissioning Experience of SNS},
author = {Plum, Michael A},
abstractNote = {The Spallation Neutron Source accelerator complex consists of a 2.5 MeV H{sup -} front-end injector system, a 186 MeV normal-conducting linear accelerator, a 1 GeV superconducting linear accelerator, an accumulator ring, and associated beam transport lines. The linac was commissioned in five discrete runs, starting in 2002 and completed in 2005. The accumulator ring and associated beam transport lines were commissioned in two runs in January-February and April 2006. With the completed commissioning of the SNS accelerator, the facility has begun initial low-power operations. In the course of beam commissioning, most beam performance parameters and beam intensity goals have been achieved at low duty factor. A number of beam dynamics measurements have been performed, including emittance evolution, transverse coupling in the ring, beam instability thresholds, and beam distributions on the target. The commissioning results, achieved beam performance and initial operating experience of the SNS linac will be presented.},
doi = {},
journal = {},
number = ,
volume = ,
place = {United States},
year = {Sun Jul 01 00:00:00 EDT 2007},
month = {Sun Jul 01 00:00:00 EDT 2007}
}

Conference:
Other availability
Please see Document Availability for additional information on obtaining the full-text document. Library patrons may search WorldCat to identify libraries that hold this conference proceeding.

Save / Share:
  • The Spallation Neutron Source (SNS) successfully met the primary construction project completion milestones in April 2006. An important ingredient of this successful commissioning was the development and use of software tools. With the increasing digitalization of beam diagnostics and increasing complexity of Integrated Control Systems of large accelerators, the need for high level software tools is critical for smooth commissioning. At SNS a special Java based infrastructure called XAL was prepared for beam commissioning. XAL provides a hierarchal view of the accelerator, is data base configured, and includes a physics model of the beam. This infrastructure and individual applications developmentmore » along with a historical time line of the SNS commissioning will be discussed.« less
  • The Spallation Neutron Source accelerator systems will deliver a 1 GeV, 1.44 MW proton beam to a liquid mercury target for neutron scattering research. The accelerator complex consists of an H- injector, capable of producing one-ms-long pulses at 60 Hz repetition rate with 38 mA peak current, a 1 GeV linear accelerator, an accumulator ring and associated transport lines. A 2.5 MeV beam from the Front End is accelerated to 86 MeV in a Drift Tube Linac, then to 185 MeV in a Coupled-Cavity Linac and then to 1 GeV in a Superconducting Linac. The staged beam commissioning of themore » accelerator complex is proceeding as component installation progresses. The Front End, Drift Tube Linac and part of the Coupled-Cavity Linac have been commissioned at ORNL. The primary design goals of peak current, transverse emittance and beam energy have been achieved. Results and status of the beam commissioning program will be presented.« less
  • No abstract prepared.
  • The Front-End Systems (FES) for the Spallation Neutron Source (SNS) project comprise an rf-driven H{sup -} ion source, an electrostatic 2-lens LEBT, a 2.5 MeV RFQ, followed by a 14-quadrupole, 4-rebuncher MEBT including traveling-wave fast choppers. The nominal 2.5 MeV H{sup -} beam has a current of 38 mA at a repetition rate of 60 Hz and 1 ms pulse length, for a macro duty-factor of 6%, and is chopped at a rate of approximately 1 MHz with a mini duty-factor of 68%. The normalized rms beam emittance at the MEBT exit, matching the first tank of a 402.5 MHzmore » Alvarez linac, is measured to be approximately 0.3 {pi} mm mrad. Diagnostic elements include wire scanners, BPMs, fast current monitors, a slit-harp emittance device and RFQ field monitoring probes. The results of the beam commissioning and the operation of the RFQ and diagnostic instrumentation are reported. The entire FES was shut down at LBNL at the end of May 2002 and will be recommissioned at ORNL prior to installation of the drift-tube linac.« less
  • LBNL has built for the Spallation Neutron Source (SNS) project a 402.5 MHz RFQ that is designed to accelerate up to 60 mA H{sup -} from 65 keV to 2.5 MeV [1]. A one millisecond pulse length at 60 Hz provides a 6% duty factor. The RFQ has now been built, conditioned at full duty factor and tested with beam. This paper will present results from the final installation, tuning and beam commissioning. Beam measurements include acceleration and transport efficiencies and transverse emittances. The LEBT optics were tuned for best results. Performance testing of the RF power distribution is alsomore » discussed here.« less