Title: Submittal of Final Post-Closure Inspection Letter Report for Corrective Action Unit 91: Area 3 U-3fi Injection Well, 2006

Abstract

This letter serves as the post-closure monitoring letter report for the above Corrective Action Unit (CAU) for calendar year 2006. CAU 91 is inspected every six months. The first inspection was conducted on March 23, 2006, and the second inspection was conducted on September 19, 2006. All access roads, fences, gates, and signs were in excellent condition. No settling, cracking, or erosion was observed on the cover, and the use restriction had been maintained. No issues were identified, and no corrective actions were needed. The post-closure inspection checklists for CAU 91 are attached. Photographs and fields notes taken during site inspections are maintained in the project files.

Authors:
Publication Date:
Research Org.:
National Security Technologies, LLC
Sponsoring Org.:
USDOE - National Nuclear Security Administration (NNSA)
OSTI Identifier:
926636
Report Number(s):
DOE/NV-948-LR; DOE/NV/25946-119
TRN: US0803437
DOE Contract Number:
DE-AC52-06NA25946
Resource Type:
Technical Report
Country of Publication:
United States
Language:
English
Subject:
12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE WASTES FROM NUCLEAR FACILITIES; CALENDARS; FENCES; IMAGES; INJECTION WELLS; MONITORING

Citation Formats

NSTec Environmental Restoration. Submittal of Final Post-Closure Inspection Letter Report for Corrective Action Unit 91: Area 3 U-3fi Injection Well, 2006. United States: N. p., 2007. Web. doi:10.2172/926636.
NSTec Environmental Restoration. Submittal of Final Post-Closure Inspection Letter Report for Corrective Action Unit 91: Area 3 U-3fi Injection Well, 2006. United States. doi:10.2172/926636.
NSTec Environmental Restoration. Mon . "Submittal of Final Post-Closure Inspection Letter Report for Corrective Action Unit 91: Area 3 U-3fi Injection Well, 2006". United States. doi:10.2172/926636. https://www.osti.gov/servlets/purl/926636.
@article{osti_926636,
title = {Submittal of Final Post-Closure Inspection Letter Report for Corrective Action Unit 91: Area 3 U-3fi Injection Well, 2006},
author = {NSTec Environmental Restoration},
abstractNote = {This letter serves as the post-closure monitoring letter report for the above Corrective Action Unit (CAU) for calendar year 2006. CAU 91 is inspected every six months. The first inspection was conducted on March 23, 2006, and the second inspection was conducted on September 19, 2006. All access roads, fences, gates, and signs were in excellent condition. No settling, cracking, or erosion was observed on the cover, and the use restriction had been maintained. No issues were identified, and no corrective actions were needed. The post-closure inspection checklists for CAU 91 are attached. Photographs and fields notes taken during site inspections are maintained in the project files.},
doi = {10.2172/926636},
journal = {},
number = ,
volume = ,
place = {United States},
year = {Mon Feb 05 00:00:00 EST 2007},
month = {Mon Feb 05 00:00:00 EST 2007}
}

Technical Report:

Save / Share: