Flood Hazard Assessment for the Savannah River Site
'A method was developed to determine the probabilistic flood elevation curves for certain Savannah River Site (SRS) facilities. This paper presents the method used to determine the probabilistic flood elevation curve for F-Area due to runoff from the Upper Three Runs basin. Department of Energy (DOE) Order 420.1, Facility Safety, outlines the requirements for Natural Phenomena Hazard (NPH) mitigation for new and existing DOE facilities. The NPH considered in this paper is flooding. The facility-specific probabilistic flood hazard curve defines as a function of water elevation the annual probability of occurrence or the return period in years. Based on facility-specific probabilistic flood hazard curves and the nature of facility operations (e.g., involving hazardous or radioactive materials), facility managers can design permanent or temporary devices to prevent the propagation of flood on site, and develop emergency preparedness plans to mitigate the consequences of floods.'
- Research Organization:
- Savannah River Site (SRS), Aiken, SC (United States)
- Sponsoring Organization:
- USDOE
- DOE Contract Number:
- AC09-96SR18500
- OSTI ID:
- 9169
- Report Number(s):
- WSRC-MS-99-00499; ON: DE00009169
- Resource Relation:
- Conference: 7th Topical Meeting on Emergency Preparedness and Response, Santa Fe, NM (USA), 14-17 Sep 1999
- Country of Publication:
- United States
- Language:
- English
Similar Records
Flood hazard assessment for the Savannah River Site
Flood Hazard Recurrence Frequencies for A-, K- and L-Areas, and Revised Frequencies for C-, F-, E-, S-, H-, Y- and Z-Areas