skip to main content
OSTI.GOV title logo U.S. Department of Energy
Office of Scientific and Technical Information

Title: Cryogenic infrastructure for Fermilab's ILC vertical cavity test facility

Conference ·
OSTI ID:915121

Fermilab is building a Vertical Cavity Test Facility (VCTF) to provide for R&D and pre-production testing of bare 9-cell, 1.3-GHz superconducting RF (SRF) cavities for the International Linear Collider (ILC) program. This facility is located in the existing Industrial Building 1 (IB1) where the Magnet Test Facility (MTF) also resides. Helium and nitrogen cryogenics are shared between the VCTF and MTF including the existing 1500-W at 4.5-K helium refrigerator with vacuum pumping for super-fluid operation (125-W capacity at 2-K). The VCTF is being constructed in multiple phases. The first phase is scheduled for completion in mid 2007, and includes modifications to the IB1 cryogenic infrastructure to allow helium cooling to be directed to either the VCTF or MTF as scheduling demands require. At this stage, the VCTF consists of one Vertical Test Stand (VTS) cryostat for the testing of one cavity in a 2-K helium bath. Planning is underway to provide a total of three Vertical Test Stands at VCTF, each capable of accommodating two cavities. Cryogenic infrastructure improvements necessary to support these additional VCTF test stands include a dedicated ambient temperature vacuum pump, a new helium purification skid, and the addition of helium gas storage. This paper describes the system design and initial cryogenic operation results for the first VCTF phase, and outlines future cryogenic infrastructure upgrade plans for expanding to three Vertical Test Stands.

Research Organization:
Fermi National Accelerator Lab. (FNAL), Batavia, IL (United States)
Sponsoring Organization:
USDOE
DOE Contract Number:
AC02-07CH11359
OSTI ID:
915121
Report Number(s):
FERMILAB-CONF-07-348-AD-TD; TRN: US0804900
Resource Relation:
Conference: Presented at 2007 Cryogenic Engineering Conference and International Cryogenic Materials Conference (CEC-ICMC), Chattanooga, Tennessee, 16-20 Jul 2007
Country of Publication:
United States
Language:
English

Similar Records

CRYOGENIC INFRASTRUCTURE FOR FERMILAB'S ILC VERTICAL CAVITY TEST FACILITY
Journal Article · Sun Mar 16 00:00:00 EDT 2008 · AIP Conference Proceedings · OSTI ID:915121

The variable input coupler for the Fermilab Vertical Cavity Test Facility
Conference · Mon Sep 01 00:00:00 EDT 2008 · OSTI ID:915121

Cryogenic system for the Cryomodule Test Facility at Fermilab
Journal Article · Wed Jan 29 00:00:00 EST 2014 · AIP Conference Proceedings · OSTI ID:915121