Title: INTEC Groundwater Monitoring Report 2006

Abstract

This report summarizes 2006 perched water and groundwater monitoring activities at the Idaho Nuclear Technology and Engineering Center (INTEC) located at the Idaho National Laboratory (INL). During 2006, groundwater samples were collected from a total of 22 Snake River Plain Aquifer (SRPA) monitoring wells, plus six aquifer wells sampled for the Idaho CERCLA Disposal Facility (ICDF) monitoring program. In addition, perched water samples were collected from 21 perched wells and 19 suction lysimeters. Groundwater and perched water samples were analyzed for a suite of radionuclides and inorganic constituents. Laboratory results in this report are compared to drinking water maximum contaminant levels (MCLs). Such comparison is for reference only and it should be noted that the Operable Unit 3-13 Record of Decision does not require that perched water comply with drinking water standards.

Authors:
Publication Date:
Research Org.:
Idaho National Laboratory - Idaho Cleanup Project
Sponsoring Org.:
USDOE
OSTI Identifier:
910310
Report Number(s):
DOE/ID-11301 Rev. 0
TRN: US200724%%59
DOE Contract Number:
DE-AC07-05ID14516
Resource Type:
Technical Report
Country of Publication:
United States
Language:
English
Subject:
54 ENVIRONMENTAL SCIENCES; AQUIFERS; DRINKING WATER; LYSIMETERS; MONITORING; RADIOISOTOPES; SNAKE RIVER PLAIN; US SUPERFUND; WATER; Perched water and groundwater

Citation Formats

J. R. Forbes S. L. Ansley M. Leecaster. INTEC Groundwater Monitoring Report 2006. United States: N. p., 2007. Web. doi:10.2172/910310.
J. R. Forbes S. L. Ansley M. Leecaster. INTEC Groundwater Monitoring Report 2006. United States. doi:10.2172/910310.
J. R. Forbes S. L. Ansley M. Leecaster. Thu . "INTEC Groundwater Monitoring Report 2006". United States. doi:10.2172/910310. https://www.osti.gov/servlets/purl/910310.
@article{osti_910310,
title = {INTEC Groundwater Monitoring Report 2006},
author = {J. R. Forbes S. L. Ansley M. Leecaster},
abstractNote = {This report summarizes 2006 perched water and groundwater monitoring activities at the Idaho Nuclear Technology and Engineering Center (INTEC) located at the Idaho National Laboratory (INL). During 2006, groundwater samples were collected from a total of 22 Snake River Plain Aquifer (SRPA) monitoring wells, plus six aquifer wells sampled for the Idaho CERCLA Disposal Facility (ICDF) monitoring program. In addition, perched water samples were collected from 21 perched wells and 19 suction lysimeters. Groundwater and perched water samples were analyzed for a suite of radionuclides and inorganic constituents. Laboratory results in this report are compared to drinking water maximum contaminant levels (MCLs). Such comparison is for reference only and it should be noted that the Operable Unit 3-13 Record of Decision does not require that perched water comply with drinking water standards.},
doi = {10.2172/910310},
journal = {},
number = ,
volume = ,
place = {United States},
year = {Thu Feb 01 00:00:00 EST 2007},
month = {Thu Feb 01 00:00:00 EST 2007}
}

Technical Report:

Save / Share:
  • This report describes the monitoring activities conducted and presents the results of groundwater sampling and water-level measurements from October 2000 to September 2001. Groundwater samples were initially collected from 41 wells from the Idaho Nuclear Technology and Engineering Center and the Central Facilities Area and analyzed for iodine- 129, strontium-90, tritium, gross alpha, gross beta, technetium-99, uranium isotopes, plutonium isotopes, neptunium-237, gamma spectrometry, and mercury. Samples from 41 wells were collected in April and May 2001. Additional sampling was conducted in August 2001 and included in two CFA production wells, the CFA point of compliance for the production wells, onemore » well was previously sampled and five additional monitoring wells. Water-level measurements were taken from in the Idaho Nuclear Technology and Engineering Center, Central Facilities Area, and the area south of Central Facilities Area to evaluate groundwater flow directions. Water-level measurements indicated groundwater flow to the south-southwest from the Idaho Nuclear Technology and Engineering Center.« less
  • This report describes the monitoring activities conducted and presents the results of groundwater sampling and water-level measurements from October 2000 to September 2001. Groundwater samples were initially collected from 41 wells from the Idaho Nuclear Technology and Engineering Center and the Central Facilities Area and analyzed for iodine-129, strontium-90, tritium, gross alpha, gross beta, technetium-99, uranium isotopes, plutonium isotopes, neptunium-237, americium-241, gamma spectrometry, and mercury. Samples from 41 wells were collected in April and May 2001. Additional sampling was conducted in August 2001 and included the two CFA production wells, the CFA point of compliance for the production wells, onemore » well that was previously sampled and five additional monitoring wells. Iodine-129 and strontium-90 were the only analytes above their respective maximum contaminant levels. Iodine-129 was detected just above its maximum contaminant level of 1 pCi/L at two of the Central Facilities Area landfill wells. Iodine-129 was detected in the CFA production wells at 0.35±0.083 pCi/L in CFA-1, but was below detectable activity in CFA-2. Strontium-90 was above its maximum contaminant level of 8 pCi/L in several wells near the Idaho Nuclear Technology and Engineering Center but was below its maximum contaminant level in the downgradient wells at the Central Facilities Area landfills. Sr-90 was not detected in the CFA production wells. Gross beta results generally mirrored the results for strontium-90 and technetium-99. Plutonium isotopes and neptunium-237 were not detected. Uranium-233/234 and uranium-238 isotopes were detected in all samples. Concentrations of background and site wells were similar and are within background limits for total uranium determined by the USGS, suggesting that the concentrations are background. Uranium-235/236 was detected in 11 samples, but all the detected concentrations were similar and near the minimum detectable activity. Americium-241 was detected at three locations near the minimum detectable activity of approximately 0.07 pCi/L. The gamma spectrometry results detected cesium-137 in three samples, potassium-40 at eight locations, and radium-226 at one location. Mercury was below its maximum contaminant level of 2 µg/L in all samples. Gamma spectrometry results for the CFA production wells did not detect any analytes. Water-level measurements were taken from wells in the Idaho Nuclear Technology and Engineering Center, Central Facilities Area, and the area south of Central Facilities Area to evaluate groundwater flow directions. Water-level measurements indicated groundwater flow to the south-southwest from the Idaho Nuclear Technology and Engineering Center.« less
  • This document reports the results of groundwater monitoring in September 2005 and March 2006 at the grain storage facility formerly operated at Morrill, Kansas, by the Commodity Credit Corporation of the U.S. Department of Agriculture (CCC/USDA). These activities were the first and second twice yearly sampling events of the two-year monitoring program approved by the CCC/USDA and Kansas Department of Health and Environment (KDHE) project managers. The monitoring network sampled in September 2005 consisted of 9 monitoring wells (MW1S-MW5S and MW1D [installed in the mid 1990s] and MW6S-MW8S [installed in 2004]), plus 3 private wells (Isch, Rillinger, and Stone). Themore » groundwater samples collected in this first event were analyzed for volatile organic compounds (VOCs), dissolved hydrogen, and additional groundwater parameters to aid in evaluating the potential for reductive dechlorination processes. After the monitoring in September 2005, Argonne recommended expansion of the initial monitoring network. Previous sampling (August 2004) had already suggested that the initial network was inadequate to delineate the extent of the carbon tetrachloride plume. With the approval of the CCC/USDA and KDHE project managers, the monitoring network was expanded in January 2006 through the installation of 3 additional monitoring wells (MW9S-MW11S). Details of the monitoring well installations are reported in this document. The expanded monitoring network of 12 monitoring wells (MW1S-MW11S and MW1D) and 3 private wells (Isch, Rillinger, and Stone) was sampled in March 2006, the second monitoring event in the planned two-year program. Results of analyses for VOCs showed minor increases or decreases in contaminant levels at various locations but indicated that the leading edge of the contaminant plume is approaching the intermittent stream leading to Terrapin Creek. The groundwater samples collected in March 2006 were also analyzed for additional groundwater parameters to aid in the evaluation of the potential for reductive dechlorination processes. Preliminary screening of groundwater parameters provided inadequate evidence that reductive dechlorination of carbon tetrachloride is taking place at some locations on the former CCC/USDA property. Groundwater levels measured manually in October 2005, March 2006, and June 2006 were used to map the potentiometric surface at Morrill. The results were generally consistent with each other and with previous measurements, indicating a groundwater flow direction to the south-southeast from the former CCC/USDA facility. Data recorders installed in wells MW1S-MW8S in July 2004 are gathering long-term data on the groundwater elevation and gradient. Data downloaded in August 2004, March 2005, October 2005, and June 2006 indicate that two relatively upgradient wells near the former CCC/USDA facility responded distinctly to apparent rainfall/recharge events. In contrast, two downgradient wells south of the former facility showed virtually no response, probably because of the damping influence of the nearby surface drainages and shallow groundwater at their locations. The first two monitoring events of the planned two-year monitoring program for Morrill have demonstrated no clear pattern of changes in carbon tetrachloride concentrations, though the contaminated zone has expanded toward the intermittent stream. Argonne recommends that the monitoring program continue as approved and that surface water samples be collected in future monitoring events (September 2006, March 2007, and September 2007).« less
  • This document reports the results of groundwater sampling in September-October 2005 and March 2006 at the grain storage facility formerly operated at Centralia, Kansas, by the Commodity Credit Corporation of the U.S. Department of Agriculture (CCC/USDA). These activities were the first and second twice yearly sampling events of the two-year monitoring program approved by the CCC/USDA and Kansas Department of Health and Environment (KDHE) project managers. The initial monitoring network sampled in September and October 2005 consisted of six monitoring wells (MW1-MW6) installed in 2004, plus five groundwater piezometers (SB01, SB04, SB05, SB08, SB09) installed in 2002. The combined September-Octobermore » 2005 sampling was the first monitoring event in the planned two-year program for Centralia. The groundwater samples collected in both September and October were analyzed for volatile organic compounds (VOCs), and samples collected in September were analyzed for dissolved hydrogen and additional groundwater parameters to aid in evaluating the potential for reductive dechlorination processes. After the monitoring in September-October 2005, Argonne recommended expansion of the initial monitoring network. Previous sampling (August 2004) had already suggested that this network of six monitoring wells and five piezometers was inadequate to delineate the extent of the carbon tetrachloride plume. With the approval of the CCC/USDA and KDHE project managers, the monitoring network was expanded in January 2006 through the installation of four additional monitoring wells (MW7-MW10) and one new piezometer (SB07R) to replace a damaged piezometer (the former SB07). Details of the monitoring well and piezometer installations are reported in this document. The expanded monitoring network of ten monitoring wells (MW01-MW10) and six piezometers (SB01, SB04, SB05, SB07R, SB08, and SB09) was sampled in March 2006. This March 2006 sampling was the second monitoring event in the planned two-year program. Results of analyses for VOCs showed further increases in contaminant levels and expansion of the carbon tetrachloride plume toward the south and west from the former CCC/USDA facility. The groundwater samples collected in March 2006 were also analyzed for additional groundwater parameters to aid in the evaluation of the potential for reductive dechlorination processes. Preliminary screening of groundwater parameters provided limited evidence that reductive dechlorination of carbon tetrachloride is taking place at some locations on the former CCC/USDA facility. Groundwater levels measured manually in September 2005, March 2006, and June 2006 were used to map the potentiometric surface at Centralia. Overall, these results were consistent with each other and with previous measurements, generally indicating a groundwater flow direction toward the south-southwest from the former CCC/USDA facility. Data recorders installed in wells MW01-MW06 in August 2004 are gathering long-term data on the groundwater elevation and gradient. Data downloaded in March 2005, September 2005, and June 2006 indicate that two wells north and west of the former CCC/USDA facility boundary show distinct, transient and seasonal water level variations. In contrast, two different wells southwest and south of the former facility boundary show virtually no response to the same events. The first two monitoring events of the planned two-year monitoring program for Centralia have demonstrated increased carbon tetrachloride concentrations and lateral expansion of the contaminated zone. Argonne recommends that the CCC/USDA and KDHE project managers consider development and approval of a work plan to expedite the selection and implementation of an active remedial alternative addressing the concentrated areas of groundwater contamination before the end of the two-year monitoring program in 2007.« less
  • Pacific Northwest National Laboratory, the U.S. Department of Energy (DOE), and the regulators have agreed that two characterization wells along with three additional performance monitoring wells shall be installed in the 300-FF-5 Operable Unit as defined in the proposed Hanford Federal Facility Agreement and Consent Order (Tri-Party Agreement [TPA]) Milestone M-24-57 and the 300-FF-5 Limited Field Investigation plan (DOE/RL-2005-47). This document contains the statement of work required to drill, characterize, and construct the proposed groundwater monitoring wells during FY 2006.