The Bristol Bay Native Corporation (BBNC) grant project focused on conducting nine wind resource studies in eight communities in the Bristol Bay region of southwest Alaska and was administered as a collaborative effort between BBNC, the Alaska Energy Authority, Alaska Village Electric Cooperative, Nushagak Electric Cooperative (NEC), Naknek Electric Association (NEA), and several individual village utilities in the region. BBNC’s technical contact and the project manager for this study was Douglas Vaught, P.E., of V3 Energy, LLC, in Eagle River, Alaska. The Bristol Bay region of Alaska is comprised of 29 communities ranging in size from the hub community of Dillingham with a population of approximately 3,000 people, to a few Native Alaska villages that have a few tens of residents. Communities chosen for inclusion in this project were Dillingham, Naknek, Togiak, New Stuyahok, Kokhanok, Perryville, Clark’s Point, and Koliganek. Selection criteria for conduction of wind resource assessments in these communities included population and commercial activity, utility interest, predicted Class 3 or better wind resource, absence of other sources of renewable energy, and geographical coverage of the region. Beginning with the first meteorological tower installation in October 2003, wind resource studies were completed at all sites with at least onemore » year, and as much as two and a half years, of data. In general, the study results are very promising for wind power development in the region with Class 6 winds measured in Kokhanok; Class 4 winds in New Stuyahok, Clark’s Point, and Koliganek; Class 3 winds in Dillingham, Naknek, and Togiak; and Class 2 winds in Perryville. Measured annual average wind speeds and wind power densities at the 30 meter level varied from a high of 7.87 meters per second and 702 watts per square meter in Kokhanok (Class 6 winds), to a low of 4.60 meters per second and 185 watts per square meter in Perryville (Class 2 winds).« less

Authors:
Publication Date:
Research Org.:
Bristol Bay Native Corporation
Sponsoring Org.:
USDOE Office of Energy Efficiency and Renewable Energy (EERE)
OSTI Identifier:
901572
Report Number(s):
DOE/GO/13023-1
TRN: US200720%%319
DOE Contract Number:
FG36-03GO13023
Resource Type:
Technical Report
Country of Publication:
United States
Language:
English
Subject:
17 WIND ENERGY; COMMUNITIES; COOPERATIVES; ELECTRIC UTILITIES; RESOURCE ASSESSMENT; WIND POWER; wind resource assessment; wind energy; BBNC; Bristol Bay; Alaska

Citation Formats

Vaught, Douglas J. Final Project Report, Bristol Bay Native Corporation Wind and Hydroelectric Feasibility Study. United States: N. p., 2007. Web. doi:10.2172/901572.
Vaught, Douglas J. Final Project Report, Bristol Bay Native Corporation Wind and Hydroelectric Feasibility Study. United States. doi:10.2172/901572.
Vaught, Douglas J. Sat . "Final Project Report, Bristol Bay Native Corporation Wind and Hydroelectric Feasibility Study". United States. doi:10.2172/901572. https://www.osti.gov/servlets/purl/901572.
@article{osti_901572,
title = {Final Project Report, Bristol Bay Native Corporation Wind and Hydroelectric Feasibility Study},
author = {Vaught, Douglas J.},
abstractNote = {The Bristol Bay Native Corporation (BBNC) grant project focused on conducting nine wind resource studies in eight communities in the Bristol Bay region of southwest Alaska and was administered as a collaborative effort between BBNC, the Alaska Energy Authority, Alaska Village Electric Cooperative, Nushagak Electric Cooperative (NEC), Naknek Electric Association (NEA), and several individual village utilities in the region. BBNC’s technical contact and the project manager for this study was Douglas Vaught, P.E., of V3 Energy, LLC, in Eagle River, Alaska. The Bristol Bay region of Alaska is comprised of 29 communities ranging in size from the hub community of Dillingham with a population of approximately 3,000 people, to a few Native Alaska villages that have a few tens of residents. Communities chosen for inclusion in this project were Dillingham, Naknek, Togiak, New Stuyahok, Kokhanok, Perryville, Clark’s Point, and Koliganek. Selection criteria for conduction of wind resource assessments in these communities included population and commercial activity, utility interest, predicted Class 3 or better wind resource, absence of other sources of renewable energy, and geographical coverage of the region. Beginning with the first meteorological tower installation in October 2003, wind resource studies were completed at all sites with at least one year, and as much as two and a half years, of data. In general, the study results are very promising for wind power development in the region with Class 6 winds measured in Kokhanok; Class 4 winds in New Stuyahok, Clark’s Point, and Koliganek; Class 3 winds in Dillingham, Naknek, and Togiak; and Class 2 winds in Perryville. Measured annual average wind speeds and wind power densities at the 30 meter level varied from a high of 7.87 meters per second and 702 watts per square meter in Kokhanok (Class 6 winds), to a low of 4.60 meters per second and 185 watts per square meter in Perryville (Class 2 winds).},
doi = {10.2172/901572},
journal = {},
number = ,
volume = ,
place = {United States},
year = {Sat Mar 31 00:00:00 EDT 2007},
month = {Sat Mar 31 00:00:00 EDT 2007}
}

Technical Report:

Save / Share:
  • An analysis has been made of the technical feasibility of developing wind power in the Dillingham/Naknek-King Salmon area of Bristol Bay, Alaska. The analysis involved a survey of historical wind data records, a field study involving ecological indicators such as bush and tree flagging, and a one-year wind monitoring program using data from existing government weather stations as well as anemometers installed by AeroVironment Inc. Finally, a technical analysis was made of expected energy outputs from selected, promising sites. Since Naknek was the most promising site, an energy production calculation for three representative turbines of 25-kW, 65-kW, and 125-kW ratingmore » was made. Conclusions are that a 350-kW turbine wind farm with a capacity factor of 0.34 is feasible at Naknek, and that this is the most promising area for wind energy development in the Bristol Bay region.« less
  • The focus of this report is on Alaska Natives--Inupiaq and Yupik Eskimos, Athabascans, and Aleuts--for two important reasons: (1) Alaska Natives are numerically dominant populations in rural areas closest to potential offshore oil development sites and (2) their economic adjustments are most vulnerable to potential impacts from such development. This report is divided into Schedules A, B, and C. Comprising Schedules A and B are the study areas originally identified by Minerals Management Service for this study (North Slope, NANA, Bering Straits, Calista, Bristol Bay, Aleutian-Pribilof Islands, and Kodiak regions). Schedule C is comprised of communities that were added subsequentmore » to the Exxon Valdez oil spill of 1989 in the Prince William Sound and Cook Inlet regions. One aim of this study was to document the attitudes and belief systems or ideologies about quality of life and well-being in the coastal, rural portions of Alaska.« less
  • The Upper Mechanicville Project, the first hydroelectric plant to be developed in recent years by NYSEG, is located at Dam and Lock No. C-3 on the West Bank of the Hudson River about 20 miles upstream from Albany and is part of the Champlain Barge Canal navigation system. As of August 1985, both units have completed two full years of operation. Initially both units required warranty work. Since completion of warranty work, both units have operated exceptionally well and virtually troublefree.
  • These appendices contain legal, environmental, regulatory, technical and economic information used in evaluating the feasibility of redeveloping the hydroelectric power generating facilities at the Upper and Lower Dams of the Farmington River at Collinsville, CT. (LCL)
  • The Canton Hydroelectric Project study was undertaken to determine the feasibility of redeveloping hydroelectric power generation facilities at the Upper and Lower Dams on the Farmington River at Collinsville, CT. The integrity of the existing dams and power plants was investigated and found to be generally adequate. The intake channels, powerhouses and tailraces will require refurbishing but no major repairs. The Lower Dam will require some repair to correct surface deterioration conditions. New flashboard installations are contemplated for both the dams. Energy production operational studies were performed on 25 generating unit alternatives for the two sites. Detailed cost estimates weremore » prepared for seven Upper and five Lower site alternatives, and a detailed economic analysis of ten project alternatives was performed. The economic analysis included 3 power marketing options and the future escalation of the value of energy. The conclusions of this study were: the project is economically feasible on a 40-y life cycle basis; short-term financing, bond payment adjustments, or other special financial arrangements will be needed to provide for the negative cash flow during the early years of operation; and the Town of Canton should further pursue the power marketing and financing aspects of the project. (LCL)« less