skip to main content
OSTI.GOV title logo U.S. Department of Energy
Office of Scientific and Technical Information

Title: 2007 Wholesale Power Rate Case Initial Proposal : Qualification Statements of Witnesses.

Abstract

No abstract prepared.

Authors:
Publication Date:
Research Org.:
Bonneville Power Administration (BPA), Portland, OR
Sponsoring Org.:
USDOE
OSTI Identifier:
898392
Report Number(s):
DOE/BP-3678
TRN: US200713%%91
DOE Contract Number:
WP-07-Q-BPA-01
Resource Type:
Technical Report
Country of Publication:
United States
Language:
English
Subject:
29 ENERGY PLANNING, POLICY AND ECONOMY; ELECTRIC POWER; PRICES; FORECASTING; BONNEVILLE POWER ADMINISTRATION; PUBLIC OPINION; Electric utilities - Northwest, Pacific - Rates

Citation Formats

United States. Bonneville Power Administration. 2007 Wholesale Power Rate Case Initial Proposal : Qualification Statements of Witnesses.. United States: N. p., 2005. Web. doi:10.2172/898392.
United States. Bonneville Power Administration. 2007 Wholesale Power Rate Case Initial Proposal : Qualification Statements of Witnesses.. United States. doi:10.2172/898392.
United States. Bonneville Power Administration. Tue . "2007 Wholesale Power Rate Case Initial Proposal : Qualification Statements of Witnesses.". United States. doi:10.2172/898392. https://www.osti.gov/servlets/purl/898392.
@article{osti_898392,
title = {2007 Wholesale Power Rate Case Initial Proposal : Qualification Statements of Witnesses.},
author = {United States. Bonneville Power Administration.},
abstractNote = {No abstract prepared.},
doi = {10.2172/898392},
journal = {},
number = ,
volume = ,
place = {United States},
year = {Tue Nov 01 00:00:00 EST 2005},
month = {Tue Nov 01 00:00:00 EST 2005}
}

Technical Report:

Save / Share:
  • This schedule is available for the contract purchase of Firm Power to be used within the Pacific Northwest (PNW). Priority Firm (PF) Power may be purchased by public bodies, cooperatives, and Federal agencies for resale to ultimate consumers, for direct consumption, and for Construction, Test and Start-Up, and Station Service. Rates in this schedule are in effect beginning October 1, 2006, and apply to purchases under requirements Firm Power sales contracts for a three-year period. The Slice Product is only available for public bodies and cooperatives who have signed Slice contracts for the FY 2002-2011 period. Utilities participating in themore » Residential Exchange Program (REP) under Section 5(c) of the Northwest Power Act may purchase Priority Firm Power pursuant to the Residential Exchange Program. Rates under contracts that contain charges that escalate based on BPA's Priority Firm Power rates shall be based on the three-year rates listed in this rate schedule in addition to applicable transmission charges. This rate schedule supersedes the PF-02 rate schedule, which went into effect October 1, 2001. Sales under the PF-07 rate schedule are subject to BPA's 2007 General Rate Schedule Provisions (2007 GRSPs). Products available under this rate schedule are defined in the 2007 GRSPs. For sales under this rate schedule, bills shall be rendered and payments due pursuant to BPA's 2007 GRSPs and billing process.« less
  • The Documentation for Wholesale Power Rate Development Study (WPRDS) shows the details of the calculation of the proposed rates. It contains the source data, the calculation, and the results. Section 1 contains an overview of the information used and developed in the various models used in the rate development process. Section 2 contains the documentation of the Rate Analysis Model (RAM2007). The RAM2007 is a group of computer applications that performs most of the computations that determine BPA's proposed rates. The output tables of RAM2007 show the source data, calculations (in sequence), and the results (rate charges) of the ratemore » development process. Section 3 provides documentation of revenue forecasts for the 3-year rate test period FY 2007 through FY 2009 at both current and proposed rates and at current rates for the period immediately preceding the rate test period. Section 4 includes supporting data for rate calculations not performed in RAM2007 or revenue analyses. Each section draws data from difference sources and thus tables and/or charts are not always numbered in sequence. For purposes of this document, omitted tables will be listed as such in the Table of Contents.« less
  • The Documentation for Wholesale Power Rate Development Study (WPRDS) shows the details of the calculation of the proposed rates. It contains the source data, the calculation, and the results. Section 1 contains an overview of the information used and developed in the various models used in the rate development process. Section 2 contains the documentation of the Rate Analysis Model (RAM2007). The RAM2007 is a group of computer applications that performs most of the computations that determine BPA's proposed rates. The output tables of RAM2007 show the source data, calculations (in sequence), and the results (rate charges) of the ratemore » development process. Section 3 provides documentation of revenue forecasts for the 3-year rate test period FY 2007 through FY 2009 at both current and proposed rates and at current rates for the period immediately preceding the rate test period. Section 4 includes supporting data for rate calculations not performed in RAM2007 or revenue analyses. Each section draws data from difference sources and thus tables and/or charts are not always numbered in sequence. For purposes of this document, omitted tables will be listed as such in the Table of Contents.« less
  • The Wholesale Power Rate Development Study (WPRDS) calculates BPA proposed rates based on information either developed in the WPRDS or supplied by the other studies that comprise the BPA rate proposal. All of these studies, and accompanying documentation, provide the details of computations and assumptions. In general, information about loads and resources is provided by the Load Resource Study (LRS), WP-07-E-BPA-01, and the LRS Documentation, WP-07-E-BPA-01A. Revenue requirements information, as well as the Planned Net Revenues for Risk (PNNR), is provided in the Revenue Requirement Study, WP-07-E-BPA-02, and its accompanying Revenue Requirement Study Documentation, WP-07-E-BPA-02A and WP-07-E-BPA-02B. The Market Pricemore » Forecast Study (MPFS), WP-07-E-BPA-03, and the MPFS Documentation, WP-07-E-BPA-03A, provide the WPRDS with information regarding seasonal and diurnal differentiation of energy rates, as well information regarding monthly market prices for Demand Rates. In addition, this study provides information for the pricing of unbundled power products. The Risk Analysis Study, WP-07-E-BPA-04, and the Risk Analysis Study Documentation, WP-07-E-BPA-04A, provide short-term balancing purchases as well as secondary energy sales and revenue. The Section 7(b)(2) Rate Test Study, WP-07-E-BPA-06, and the Section 7(b)(2) Rate Test Study Documentation, WP-07-E-BPA-06A, implement Section 7(b)(2) of the Northwest Power Act to ensure that BPA preference customers firm power rates applied to their general requirements are no higher than rates calculated using specific assumptions in the Northwest Power Act.« less
  • Section 7(b)(2) of the Pacific Northwest Electric Power Planning and Conservation Act (Northwest Power Act), 16 U.S.C. {section} 839e(b)(2), directs the Bonneville Power Administration (BPA) to conduct, after July 1, 1985, a comparison of the projected rates to be charged its preference and Federal agency customers for their firm power requirements, over the rate test period plus the ensuing four years, with the costs of power (hereafter called rates) to those customers for the same time period if certain assumptions are made. The effect of this rate test is to protect BPA's preference and Federal agency customers wholesale firm powermore » rates from certain specified costs resulting from provisions of the Northwest Power Act. The rate test can result in a reallocation of costs from the general requirements loads of preference and Federal agency customers to other BPA loads. The rate test involves the projection and comparison of two sets of wholesale power rates for the general requirements loads of BPA's public body, cooperative, and Federal agency customers (7(b)(2) Customers). The two sets of rates are: (1) a set for the test period and the ensuing four years assuming that section 7(b)(2) is not in effect (known as Program Case rates); and (2) a set for the same period taking into account the five assumptions listed in section 7(b)(2), (known as 7(b)(2) Case rates). Certain specified costs allocated pursuant to section 7(g) of the Northwest Power Act are subtracted from the Program Case rates. Next, each nominal rate is discounted to the beginning of the test period of the relevant rate case. The discounted Program Case rates are averaged, as are the 7(b)(2) Case rates. Both averages are rounded to the nearest tenth of a mill for comparison. If the average Program Case rate is greater than the average 7(b)(2) Case rate, the rate test triggers. The difference between the average Program Case rate and the average 7(b)(2) Case rate determines the amount to be reallocated from the 7(b)(2) Customers to other BPA loads in the rate proposal test period.« less