Title: The Columbia River Protection Supplemental Technologies Quality Assurance Project Plan

Abstract

The U.S. Department of Energy (DOE) has conducted interim groundwater remedial activities on the Hanford Site since the mid-1990s for several groundwater contamination plumes. DOE established the Columbia River Protection Supplemental Technologies Project (Technologies Project) in 2006 to evaluate alternative treatment technologies. The objectives for the technology project are as follows: develop a 300 Area polyphosphate treatability test to immobilize uranium, design and test infiltration of a phosphate/apatite technology for Sr-90 at 100-N, perform carbon tetrachloride and chloroform attenuation parameter studies, perform vadose zone chromium characterization and geochemistry studies, perform in situ biostimulation of chromium studies for a reducing barrier at 100-D, and perform a treatability test for phytoremediation for Sr-90 at 100-N. This document provides the quality assurance guidelines that will be followed by the Technologies Project. This Quality Assurance Project Plan is based on the quality assurance requirements of DOE Order 414.1C, Quality Assurance, and 10 CFR 830, Subpart A--Quality Assurance Requirements as delineated in Pacific Northwest National Laboratory’s Standards-Based Management System. In addition, the technology project is subject to the Environmental Protection Agency (EPA) Requirements for Quality Assurance Project Plans (EPA/240/B-01/003, QA/R-5). The Hanford Analytical Services Quality Assurance Requirements Documents (HASQARD, DOE/RL-96-68) apply to portions of thismore » project and to the subcontractors. HASQARD requirements are discussed within applicable sections of this plan.« less

Authors:
Publication Date:
Research Org.:
Pacific Northwest National Lab. (PNNL), Richland, WA (United States)
Sponsoring Org.:
USDOE
OSTI Identifier:
898098
Report Number(s):
PNNL-16340
830403000; TRN: US0701564
DOE Contract Number:  
AC05-76RL01830
Resource Type:
Technical Report
Country of Publication:
United States
Language:
English
Subject:
11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS; 54 ENVIRONMENTAL SCIENCES; HANFORD RESERVATION; GROUND WATER; REMEDIAL ACTION; COLUMBIA RIVER; URANIUM; ENVIRONMENTAL TRANSPORT; STRONTIUM 90; CARBON TETRACHLORIDE; CHLOROFORM; CHROMIUM; GEOCHEMISTRY; BIOREMEDIATION; QUALITY ASSURANCE; groundwater remediation; Hanford Site; Columbia River Protection Supplemental Technologies Project

Citation Formats

Fix, N. J. The Columbia River Protection Supplemental Technologies Quality Assurance Project Plan. United States: N. p., 2007. Web. doi:10.2172/898098.
Fix, N. J. The Columbia River Protection Supplemental Technologies Quality Assurance Project Plan. United States. https://doi.org/10.2172/898098
Fix, N. J. 2007. "The Columbia River Protection Supplemental Technologies Quality Assurance Project Plan". United States. https://doi.org/10.2172/898098. https://www.osti.gov/servlets/purl/898098.
@article{osti_898098,
title = {The Columbia River Protection Supplemental Technologies Quality Assurance Project Plan},
author = {Fix, N. J.},
abstractNote = {The U.S. Department of Energy (DOE) has conducted interim groundwater remedial activities on the Hanford Site since the mid-1990s for several groundwater contamination plumes. DOE established the Columbia River Protection Supplemental Technologies Project (Technologies Project) in 2006 to evaluate alternative treatment technologies. The objectives for the technology project are as follows: develop a 300 Area polyphosphate treatability test to immobilize uranium, design and test infiltration of a phosphate/apatite technology for Sr-90 at 100-N, perform carbon tetrachloride and chloroform attenuation parameter studies, perform vadose zone chromium characterization and geochemistry studies, perform in situ biostimulation of chromium studies for a reducing barrier at 100-D, and perform a treatability test for phytoremediation for Sr-90 at 100-N. This document provides the quality assurance guidelines that will be followed by the Technologies Project. This Quality Assurance Project Plan is based on the quality assurance requirements of DOE Order 414.1C, Quality Assurance, and 10 CFR 830, Subpart A--Quality Assurance Requirements as delineated in Pacific Northwest National Laboratory’s Standards-Based Management System. In addition, the technology project is subject to the Environmental Protection Agency (EPA) Requirements for Quality Assurance Project Plans (EPA/240/B-01/003, QA/R-5). The Hanford Analytical Services Quality Assurance Requirements Documents (HASQARD, DOE/RL-96-68) apply to portions of this project and to the subcontractors. HASQARD requirements are discussed within applicable sections of this plan.},
doi = {10.2172/898098},
url = {https://www.osti.gov/biblio/898098}, journal = {},
number = ,
volume = ,
place = {United States},
year = {Wed Jan 10 00:00:00 EST 2007},
month = {Wed Jan 10 00:00:00 EST 2007}
}