METHANE de-NOX for Utility PC Boilers
Abstract
Large-scale combustion tests with caking bituminous coal has stopped. This stoppage has come about due to limitations in current funding available to continue large scale research and development activities at Riley Power's Commercial Burner Test Facility (CBTF) of the PC Preheat technology. The CBTF was secured and decommissioned in the previous quarter; work this quarter work completed the securing the proper disposition of all PC Preheat experimental equipment at the PSCF and CBTF and completing negotiations with AES Westover (a power plant in Johnson City, New York) to accept 130 tons of residual PRB test coal in storage. The coal transport to Westover occurred at the end of August. GTI was granted a no-cost time extension through September 2005; immediate efforts are focused on completing a draft final report, which is due in October 31, 2005 and the final report in December.
- Authors:
- Publication Date:
- Research Org.:
- Gas Technology Institute, Des Plaines, IL (United States)
- Sponsoring Org.:
- USDOE
- OSTI Identifier:
- 895034
- DOE Contract Number:
- FC26-00NT40752
- Resource Type:
- Technical Report
- Country of Publication:
- United States
- Language:
- English
- Subject:
- 01 COAL, LIGNITE, AND PEAT; 03 NATURAL GAS; BITUMINOUS COAL; BOILERS; BURNERS; COAL; COMBUSTION; METHANE; POWER PLANTS; STORAGE; TRANSPORT
Citation Formats
Rabovitser, Joseph, Nester, Serguei, and Wohadlo, Stan. METHANE de-NOX for Utility PC Boilers. United States: N. p., 2005.
Web. doi:10.2172/895034.
Rabovitser, Joseph, Nester, Serguei, & Wohadlo, Stan. METHANE de-NOX for Utility PC Boilers. United States. https://doi.org/10.2172/895034
Rabovitser, Joseph, Nester, Serguei, and Wohadlo, Stan. 2005.
"METHANE de-NOX for Utility PC Boilers". United States. https://doi.org/10.2172/895034. https://www.osti.gov/servlets/purl/895034.
@article{osti_895034,
title = {METHANE de-NOX for Utility PC Boilers},
author = {Rabovitser, Joseph and Nester, Serguei and Wohadlo, Stan},
abstractNote = {Large-scale combustion tests with caking bituminous coal has stopped. This stoppage has come about due to limitations in current funding available to continue large scale research and development activities at Riley Power's Commercial Burner Test Facility (CBTF) of the PC Preheat technology. The CBTF was secured and decommissioned in the previous quarter; work this quarter work completed the securing the proper disposition of all PC Preheat experimental equipment at the PSCF and CBTF and completing negotiations with AES Westover (a power plant in Johnson City, New York) to accept 130 tons of residual PRB test coal in storage. The coal transport to Westover occurred at the end of August. GTI was granted a no-cost time extension through September 2005; immediate efforts are focused on completing a draft final report, which is due in October 31, 2005 and the final report in December.},
doi = {10.2172/895034},
url = {https://www.osti.gov/biblio/895034},
journal = {},
number = ,
volume = ,
place = {United States},
year = {Fri Sep 30 00:00:00 EDT 2005},
month = {Fri Sep 30 00:00:00 EDT 2005}
}