skip to main content
OSTI.GOV title logo U.S. Department of Energy
Office of Scientific and Technical Information

Title: An Integrated Multi-component Processing and Interpretation Framework for 3D Borehole Seismic Data

Authors:
Publication Date:
Research Org.:
Paulsson Geophysical Services
Sponsoring Org.:
USDOE
OSTI Identifier:
883087
DOE Contract Number:
FC26-03NT15418
Resource Type:
Technical Report
Country of Publication:
United States
Language:
English

Citation Formats

M. Karrenbach. An Integrated Multi-component Processing and Interpretation Framework for 3D Borehole Seismic Data. United States: N. p., 2005. Web. doi:10.2172/883087.
M. Karrenbach. An Integrated Multi-component Processing and Interpretation Framework for 3D Borehole Seismic Data. United States. doi:10.2172/883087.
M. Karrenbach. Wed . "An Integrated Multi-component Processing and Interpretation Framework for 3D Borehole Seismic Data". United States. doi:10.2172/883087. https://www.osti.gov/servlets/purl/883087.
@article{osti_883087,
title = {An Integrated Multi-component Processing and Interpretation Framework for 3D Borehole Seismic Data},
author = {M. Karrenbach},
abstractNote = {},
doi = {10.2172/883087},
journal = {},
number = ,
volume = ,
place = {United States},
year = {Wed Nov 30 00:00:00 EST 2005},
month = {Wed Nov 30 00:00:00 EST 2005}
}

Technical Report:

Save / Share:
  • This report covers the November 2004-March 2005 time period. A mid year project review meeting was held at DOE facilities on November 30th. Work has been performed successfully on several tasks 3 through 15. Most of these tasks have been executed independently. We progressed steadily and completed some of the sub-tasks, while others are still on going. We achieved the goals that we had set up in the task schedule. Reviewing the results of this work period indicates that our plan is solid and we did not encounter any unforeseen problems. The work plan will continue as projected.
  • This report covers the October 2003 until March 2004 time period. Work has continued successfully on several tasks 1 through 7. Most of these tasks have been executed independently. Due to availability of manpower during that time period we progressed steadily and completed some of the tasks, while others are still on going. We achieved the goals that we had set up in the task schedule. Reviewing the results of this work period indicates that our plan is on schedule and we did not encounter any unforeseen problems. The work plan will continue as projected. Several independent tasks pursuant themore » statement of project objectives have been executed simultaneously and are still on-going. This report summarizes the selection, test processing and test flow generation of a relevant 3D borehole seismic high-resolution test dataset. This multi-component data set is suitable for future use in this project due to data quality and unique acquisition characteristics. This report shows initial processing results that supported the data selection scheduled for Task 1. Use of real data is augmented by the creating a 3D layered synthetic geologic model in which multi-component 3D borehole seismic data were generated using 3D ray tracing. A gridded surface representation of the reflection interfaces as well as fully populated velocity grids were generated and archived. The model consists of a moderately dipping geologic setting with horizon undulations. A realistic velocity variation is used in between the three layers. Acquisition was simulated from a set of equidistant source locations at the surface of the model, while a close to vertical VSP well was used to capture the wave field data. The source pattern was close to a staggered grid pattern. Multi-component particle displacements were recorded every 50 ft down with an array length of 4,000 ft. P-P as well as P-S reflections were specified in the resulting wave field. We ensured a large enough aperture with enough fine sampling to perform advanced processing, imaging and analysis tests in the future during this project. Preparation of our software libraries for interfacing 3C display classes and mechanisms were carried out. We extensively tested the OIV and QT software library for usefulness in displaying 3C data and we thoroughly tested 3D scene graph communication between QT, OpenInventor and our existing software classes, which lead to optimizing the interface between them. We assembled an application skeleton which serves as a basis for future high level software tools. Based on this skeleton we implemented a 3C Work Bench tool as the primary prototyping tool for all future developments within this project. This work bench allows to load, manipulate and display data items. We demonstrated its basic functionality by loading source maps, horizons, seismic and velocity volumes, well logs into the tool, performing basic QC steps as is necessary in normal processing. All tasks were performed successfully, ensuring the continued progress of this project as outlined in the original proposal. Deliverables generated during this time period consist of reporting details and synthetically modeled seismic data for a 3D layered geological model. The numerically modeled SEGY data, as well as the model representation data, are ready to be sent out to DOE facilities for archiving. Based on the successful conclusion of work performed during this six month period we continue to generate synthetically modeled 3D borehole seismic data, according to Tasks 2 and 3. At the same time we proceed to design, implement and test according to the original plan the basic data classes and the basic framework outlined in Tasks 5 through 8.« less
  • This report covers the April 2004-September 2004 time period. Work has been performed successfully on several tasks 1 through 16. Part of this work has been reported in 15418R03. Most of portions of these tasks have been executed independently. We progressed steadily and completed some of the sub-tasks, while others are still on going. We achieved the goals that we had set up in the task schedule. Reviewing the results of this work period indicates that our plan is solid and we did not encounter any unforeseen problems. The work plan will continue as scheduled. A midyear review will bemore » presented in November or December 2004. Several independent tasks pursuant the statement of project objectives have been executed simultaneously and are still on-going. Use of real seismic test data is augmented by the creation a 3D ray tracing synthetic test data. We used the previously constructed 3D layered model and simulated data acquisition from a set of circular source locations at the surface of the model, while a close to vertical VSP well was used to capture the wave field data. The source pattern was optimized with respect to Fresnel zone width at the target depth. Multi-component particle displacements were recorded every 50 ft down with an array length of 4,000 ft. P-P as well as P-S reflections were specified in the resulting wave field. We ensured a large enough aperture with enough fine sampling to perform advanced processing, imaging and analysis tests in the future during this project. We constantly improved the interfacing of our software libraries with newly designed 3C display classes and mechanisms. We used the previously implemented 3C Work Bench tool as the primary prototyping tool. This work bench allows to load as well as manipulate and display data items in a flexible manner. We continued to demonstrate its basic functionality by loading source maps, horizons, seismic and velocity volumes, well logs into the tool, performing basic QC steps as is necessary in normal processing. We improved functionality by adding multiple windowing options to each of the display items. The windows can be docked or un-docked, which is advantageous in a practical sense, since the display real estate can be spread across multiple display monitors. All windows transparently tie into the same item tree and views get updated dynamically and transparently. Each display item can be associated with a particular display widget as is the case for the multi-component hodogram display widget. All tasks were performed successfully, ensuring the continued progress of this project as outlined in the original proposal. Deliverables generated during this time period consist of reporting details and synthetically modeled seismic data for a 3D layered geological model. The numerically modeled SEGY data, as well as the model representation data, are ready to be sent out to DOE facilities for archiving. Based on the successful conclusion of work performed during this three month period we continue to occasionally generate synthetically modeled 3D borehole seismic data, according to Tasks 2 and 3. At the same time we proceed to design, implement and test according to the original plan the basic data classes and the basic framework outlined in Tasks 5 through 11, as well as 16.« less
  • The objective of this project was to develop, prototype and test a robust multi-component sensor that combines both Fiber Optic and MEMS technology for use in a borehole seismic array. The use such FOMEMS based sensors allows a dramatic increase in the number of sensors that can be deployed simultaneously in a borehole seismic array. Therefore, denser sampling of the seismic wave field can be afforded, which in turn allows us to efficiently and adequately sample P-wave as well as S-wave for high-resolution imaging purposes. Design, packaging and integration of the multi-component sensors and deployment system will target maximum operatingmore » temperature of 350-400 F and a maximum pressure of 15000-25000 psi, thus allowing operation under conditions encountered in deep gas reservoirs. This project aimed at using existing pieces of deployment technology as well as MEMS and fiber-optic technology. A sensor design and analysis study has been carried out and a laboratory prototype of an interrogator for a robust borehole seismic array system has been assembled and validated.« less
  • This report addresses the effects of electrical anisotropy on the 3D inversion of single-well induction logging data when anisotropy is not considered. Of concern are possible artifacts that may lead to an incorrect interpretation of the formation about the borehole. Comparison is made of 3D isotropic inversion on a suite of model data, with and without anisotropy, consisting of an infinite layer and layer terminated at the borehole. In both cases, the layer dip (or well deviation) is varied. Inversion of the anisotropic data result in an overestimate of the layer conductivity, and the lateral extent of the layer aboutmore » the borehole.« less