Title: DOUBLE SHELL TANK (DST) EMERGENCY PUMPING GUIDE

Abstract

This document provides preplanning necessary to expeditiously remove any waste that may leak from the primary tank to the secondary tank for Hanford's 28 DSTs. The strategy is described, applicable emergency procedures are referenced, and transfer routes and pumping equipment for each tank are identified.

Authors:
Publication Date:
Research Org.:
Hanford Site (HNF), Richland, WA
Sponsoring Org.:
USDOE - Office of Environmental Management (EM)
OSTI Identifier:
881669
Report Number(s):
HNF-3484 Rev 6
TRN: US0603004
DOE Contract Number:
DE-AC06-96RL13200
Resource Type:
Technical Report
Country of Publication:
United States
Language:
English
Subject:
12 MANAGEMENT OF RADIOACTIVE WASTES, AND NON-RADIOACTIVE WASTES FROM NUCLEAR FACILITIES; PUMPING; STORAGE FACILITIES; RADIOACTIVE WASTE STORAGE; EMERGENCY PLANS; MANUALS; LEAKS; HANFORD RESERVATION; PUMPS

Citation Formats

REBERGER, D.W. DOUBLE SHELL TANK (DST) EMERGENCY PUMPING GUIDE. United States: N. p., 2006. Web. doi:10.2172/881669.
REBERGER, D.W. DOUBLE SHELL TANK (DST) EMERGENCY PUMPING GUIDE. United States. doi:10.2172/881669.
REBERGER, D.W. Fri . "DOUBLE SHELL TANK (DST) EMERGENCY PUMPING GUIDE". United States. doi:10.2172/881669. https://www.osti.gov/servlets/purl/881669.
@article{osti_881669,
title = {DOUBLE SHELL TANK (DST) EMERGENCY PUMPING GUIDE},
author = {REBERGER, D.W.},
abstractNote = {This document provides preplanning necessary to expeditiously remove any waste that may leak from the primary tank to the secondary tank for Hanford's 28 DSTs. The strategy is described, applicable emergency procedures are referenced, and transfer routes and pumping equipment for each tank are identified.},
doi = {10.2172/881669},
journal = {},
number = ,
volume = ,
place = {United States},
year = {Fri Mar 17 00:00:00 EST 2006},
month = {Fri Mar 17 00:00:00 EST 2006}
}

Technical Report:

Save / Share:
  • This document provides preplanning necessary to expeditiously remove any waste that may leak from the primary tank to the secondary tank for Hanford's 28 DSTs. The strategy is described, applicable emergency procedures are referenced, and transfer routes and pumping equipment for each tank are identified.
  • This document provides preplanning necessary to expeditiously remove any waste that may leak from the primary tank to the secondary tank for Hanford's 28 Double Shell Tanks (DSTs). The strategy is described, applicable emergency procedures are referenced, and transfer routes and pumping equipment for each tank are identified.
  • This document provides preplanning necessary to expeditiously remove any waste that may leak from the primary tank to the secondary tank for Hanford's 28 DSTs. The strategy is described, applicable emergency procedures are referenced, and transfer routes and pumping equipment for each tank are identified.
  • The purpose of this plan is to provide as much preplanning as practical for pumping waste out of the annulus or secondary containment of Double-Shell Tanks (DST). If the primary tank leaks, waste would accumulate in the secondary tank. For the purposes of this report, the terms ''secondary tank'' and ''annulus'' are used interchangeably. The preplanning will expedite emergency pumping and provide the basis for demonstrating that the leaked waste will be ''removed from the secondary containment system within 24 hours, or in as timely a manner as is possible'' as required by the Washington Administrative Code (WAC) 173-303-640 (4)more » (iv) ''Tank Systems''. There are 177 underground waste storage tanks in the Hanford Site 200 East and 200 West Areas. There are 149 single-shell tanks (SSTs), and 28 DSTs. The scope of this plan includes all 28 of the Hanford Site DSTs in AN, AP, AW, AY, AZ and SY Tank Farms. The scope also includes the transfer lines, pump pits, valve pits, jumpers, transfer pumps, sump pumps, and procedures necessary to accomplish the emergency pumping. Revision 5 of the Emergency Pumping Guide updates transfer routes and equipment in the Double Shell Tank Farm to be consistent with the transition to a RCRA compliant operating system as of July 1, 2005.« less
  • This document provides the design calculations for the DST Annulus Emergency Pumping Project. This document also contains essential information relative to DST annulus emergency pumping that may not be found in other documents. This information consists of the following: Index drawing for annulus pumping; References to the Acceptance Test Report, DST Emergency Pumping Guide, Time Deployment study, etc.; Statements of work; and Reference CEIS and RMIS numbers. A Vendor Information document, VI-50121, is not included in this document, but a copy can be obtained by contacting Document Control Services. This document contains various information regarding the Hydrostar pumps, such asmore » the air motor, cylinder size, pump installation and operation manual. It also contains information regarding the Flygt BS2060 submersible pump, such as parts list, pump handling, preventative maintenance, overhaul and repair. In addition, this document also has information on 3-way PM ball valves, electrical skid components and the alternate Gurman-Rupp stainless steel submersible pump.« less