Title: CARRIER PREPARATION BUILDING MATERIALS HANDLING SYSTEM DESCRIPTION DOCUMENT

Technical Report ·
DOI:https://doi.org/10.2172/862140· OSTI ID:862140

The Carrier Preparation Building Materials Handling System receives rail and truck shipping casks from the Carrier/Cask Transport System, and inspects and prepares the shipping casks for return to the Carrier/Cask Transport System. Carrier preparation operations for carriers/casks received at the surface repository include performing a radiation survey of the carrier and cask, removing/retracting the personnel barrier, measuring the cask temperature, removing/retracting the impact limiters, removing the cask tie-downs (if any), and installing the cask trunnions (if any). The shipping operations for carriers/casks leaving the surface repository include removing the cask trunnions (if any), installing the cask tie-downs (if any), installing the impact limiters, performing a radiation survey of the cask, and installing the personnel barrier. There are four parallel carrier/cask preparation lines installed in the Carrier Preparation Building with two preparation bays in each line, each of which can accommodate carrier/cask shipping and receiving. The lines are operated concurrently to handle the waste shipping throughputs and to allow system maintenance operations. One remotely operated overhead bridge crane and one remotely operated manipulator is provided for each pair of carrier/cask preparation lines servicing four preparation bays. Remotely operated support equipment includes a manipulator and tooling and fixtures for removing and installing personnel barriers, impact limiters, cask trunnions, and cask tie-downs. Remote handling equipment is designed to facilitate maintenance, dose reduction, and replacement of interchangeable components where appropriate. Semi-automatic, manual, and backup control methods support normal, abnormal, and recovery operations. Laydown areas and equipment are included as required for transportation system components (e.g., personnel barriers and impact limiters), fixtures, and tooling to support abnormal and recovery operations. The Carrier Preparation Building Materials Handling System interfaces with the Cask/Carrier Transport System to move the carriers to and from the system. The Carrier Preparation Building System houses the equipment and provides the facility, utility, safety, communications, and auxiliary systems supporting operations and protecting personnel.

Research Organization:
Office of Scientific and Technical Information (OSTI), Oak Ridge, TN (United States)
Sponsoring Organization:
USDOE
DOE Contract Number:
NA
OSTI ID:
862140
Report Number(s):
SDD-CMH-SE-000001 REV 01 ICN 01; MOL.20000807.0092 DC#25496; TRN: US200602%%432
Country of Publication:
United States
Language:
English

Similar Records

ASSEMBLY TRANSFER SYSTEM DESCRIPTION DOCUMENT
Technical Report · Mon Jun 26 00:00:00 EDT 2000 · OSTI ID:862140

CANISTER TRANSFER SYSTEM DESCRIPTION DOCUMENT
Technical Report · Fri Jun 23 00:00:00 EDT 2000 · OSTI ID:862140

Canister Transfer System Description Document
Technical Report · Thu Oct 12 00:00:00 EDT 2000 · OSTI ID:862140