The lessons learned from ore segregation test No.3 were presented to Minntac Mine personnel during the reporting period. Ore was segregated by A-Factor, with low values going to Step 1/2 and high values going to Step 3. During the test, the mine maintained the best split possible for the given production and location constraints. During the test, Step 1&2 A-Factor was lowered more than Step 3 was raised. All other ore quality changes were not manipulated, but the segregation by A-Factor affected most of the other qualities. Magnetic iron, coarse tails, fine tails, silica, and grind changed in response to the split. Segregation was achieved by adding ore from HIS to the Step 3 blend and lowering the amount of LC 1&2 and somewhat lowering the amount of LC 3&4. Conversely, Step 1&2 received less HIS with a corresponding increase in LC 1&2. The amount of IBC was increased to both Steps about one-third of the way into the test. For about the center half of the test, LC 3&4 was reduced to both Steps. The most noticeable layer changes were, then: an increase in the HIS split; a decrease in the LC 1&2 split; adding IBC to both Steps; and lowering LC 3&4 to both Steps. Statistical analysis of the dataset collected during ordinary, non-segregated operation of the mine and mill is continuing. Graphical analysis of blast patterns according to drill monitor data was slowed by student classwork. It is expected to resume after the semester ends in May.

Research Organization:
University of Missouri (US)
Sponsoring Organization:
(US)
DOE Contract Number:
FC26-03NT41785
OSTI ID:
841391
Resource Relation:
Other Information: PBD: 16 May 2005
Country of Publication:
United States
Language:
English

Similar Records

Total Ore Processing Integration and Management
Technical Report · Mon May 15 00:00:00 EDT 2006 · OSTI ID:841391

New Generation Dresden NPP Demineralizer Vault Cleanup Project
Conference · Tue Jul 01 00:00:00 EDT 2008 · OSTI ID:841391

Total Ore Processing Integration and Management
Technical Report · Mon Jan 30 00:00:00 EST 2006 · OSTI ID:841391