Title: MONITORED GEOLOGIC REPOSITORY LIFE CYCLE COST ESTIMATE ASSUMPTIONS DOCUMENT

Abstract

The purpose of this assumptions document is to provide general scope, strategy, technical basis, schedule and cost assumptions for the Monitored Geologic Repository (MGR) life cycle cost (LCC) estimate and schedule update incorporating information from the Viability Assessment (VA) , License Application Design Selection (LADS), 1999 Update to the Total System Life Cycle Cost (TSLCC) estimate and from other related and updated information. This document is intended to generally follow the assumptions outlined in the previous MGR cost estimates and as further prescribed by DOE guidance.

Authors:
Publication Date:
Research Org.:
Yucca Mountain Project, Las Vegas, Nevada
Sponsoring Org.:
USDOE
OSTI Identifier:
841250
Report Number(s):
MIS-MGR-AD-000002, REV 01
MOL.20010227.0094, DC#44738; TRN: US0600404
DOE Contract Number:  
AC08-91RW00134
Resource Type:
Technical Report
Country of Publication:
United States
Language:
English
Subject:
12 MANAGEMENT OF RADIOACTIVE WASTES, AND NON-RADIOACTIVE WASTES FROM NUCLEAR FACILITIES; RADIOACTIVE WASTE FACILITIES; DESIGN; LIFE-CYCLE COST; COST ESTIMATION; MONITORED RETRIEVABLE STORAGE; RADIOACTIVE WASTE DISPOSAL

Citation Formats

R.E. Sweeney. MONITORED GEOLOGIC REPOSITORY LIFE CYCLE COST ESTIMATE ASSUMPTIONS DOCUMENT. United States: N. p., 2001. Web. doi:10.2172/841250.
R.E. Sweeney. MONITORED GEOLOGIC REPOSITORY LIFE CYCLE COST ESTIMATE ASSUMPTIONS DOCUMENT. United States. doi:10.2172/841250.
R.E. Sweeney. Thu . "MONITORED GEOLOGIC REPOSITORY LIFE CYCLE COST ESTIMATE ASSUMPTIONS DOCUMENT". United States. doi:10.2172/841250. https://www.osti.gov/servlets/purl/841250.
@article{osti_841250,
title = {MONITORED GEOLOGIC REPOSITORY LIFE CYCLE COST ESTIMATE ASSUMPTIONS DOCUMENT},
author = {R.E. Sweeney},
abstractNote = {The purpose of this assumptions document is to provide general scope, strategy, technical basis, schedule and cost assumptions for the Monitored Geologic Repository (MGR) life cycle cost (LCC) estimate and schedule update incorporating information from the Viability Assessment (VA) , License Application Design Selection (LADS), 1999 Update to the Total System Life Cycle Cost (TSLCC) estimate and from other related and updated information. This document is intended to generally follow the assumptions outlined in the previous MGR cost estimates and as further prescribed by DOE guidance.},
doi = {10.2172/841250},
journal = {},
number = ,
volume = ,
place = {United States},
year = {Thu Feb 08 00:00:00 EST 2001},
month = {Thu Feb 08 00:00:00 EST 2001}
}