Title: Monitored Geologic Repository Project Description Document

Abstract

The primary objective of the Monitored Geologic Repository Project Description Document (PDD) is to allocate the functions, requirements, and assumptions to the systems at Level 5 of the Civilian Radioactive Waste Management System (CRWMS) architecture identified in Section 4. It provides traceability of the requirements to those contained in Section 3 of the ''Monitored Geologic Repository Requirements Document'' (MGR RD) (YMP 2000a) and other higher-level requirements documents. In addition, the PDD allocates design related assumptions to work products of non-design organizations. The document provides Monitored Geologic Repository (MGR) technical requirements in support of design and performance assessment in preparing for the Site Recommendation (SR) and License Application (LA) milestones. The technical requirements documented in the PDD are to be captured in the System Description Documents (SDDs) which address each of the systems at Level 5 of the CRWMS architecture. The design engineers obtain the technical requirements from the SDDs and by reference from the SDDs to the PDD. The design organizations and other organizations will obtain design related assumptions directly from the PDD. These organizations may establish additional assumptions for their individual activities, but such assumptions are not to conflict with the assumptions in the PDD. The PDD will servemore » as the primary link between the technical requirements captured in the SDDs and the design requirements captured in US Department of Energy (DOE) documents. The approved PDD is placed under Level 3 baseline control by the CRWMS Management and Operating Contractor (M and O) and the following portions of the PDD constitute the Technical Design Baseline for the MGR: the design characteristics listed in Table 1-1, the MGR Architecture (Section 4.1), the Technical Requirements (Section 5), and the Controlled Project Assumptions (Section 6).« less

Authors:
Publication Date:
Research Org.:
Yucca Mountain Project, Las Vegas, Nevada (US)
Sponsoring Org.:
US Department of Energy (US)
OSTI Identifier:
837134
Report Number(s):
TDR-MGR-SE-000004, REV 02, ICN 01
MOL.20010212.0296, DC 27775; TRN: US0502254
DOE Contract Number:  
AC08-91RW00134
Resource Type:
Technical Report
Resource Relation:
Other Information: PBD: 30 Jan 2001
Country of Publication:
United States
Language:
English
Subject:
12 MANAGEMENT OF RADIOACTIVE WASTES, AND NON-RADIOACTIVE WASTES FROM NUCLEAR FACILITIES; ARCHITECTURE; CONTRACTORS; DESIGN; ENGINEERS; LICENSE APPLICATIONS; MANAGEMENT; PERFORMANCE; RADIOACTIVE WASTE MANAGEMENT; RECOMMENDATIONS

Citation Formats

P. M. Curry. Monitored Geologic Repository Project Description Document. United States: N. p., 2001. Web. doi:10.2172/837134.
P. M. Curry. Monitored Geologic Repository Project Description Document. United States. doi:10.2172/837134.
P. M. Curry. Tue . "Monitored Geologic Repository Project Description Document". United States. doi:10.2172/837134. https://www.osti.gov/servlets/purl/837134.
@article{osti_837134,
title = {Monitored Geologic Repository Project Description Document},
author = {P. M. Curry},
abstractNote = {The primary objective of the Monitored Geologic Repository Project Description Document (PDD) is to allocate the functions, requirements, and assumptions to the systems at Level 5 of the Civilian Radioactive Waste Management System (CRWMS) architecture identified in Section 4. It provides traceability of the requirements to those contained in Section 3 of the ''Monitored Geologic Repository Requirements Document'' (MGR RD) (YMP 2000a) and other higher-level requirements documents. In addition, the PDD allocates design related assumptions to work products of non-design organizations. The document provides Monitored Geologic Repository (MGR) technical requirements in support of design and performance assessment in preparing for the Site Recommendation (SR) and License Application (LA) milestones. The technical requirements documented in the PDD are to be captured in the System Description Documents (SDDs) which address each of the systems at Level 5 of the CRWMS architecture. The design engineers obtain the technical requirements from the SDDs and by reference from the SDDs to the PDD. The design organizations and other organizations will obtain design related assumptions directly from the PDD. These organizations may establish additional assumptions for their individual activities, but such assumptions are not to conflict with the assumptions in the PDD. The PDD will serve as the primary link between the technical requirements captured in the SDDs and the design requirements captured in US Department of Energy (DOE) documents. The approved PDD is placed under Level 3 baseline control by the CRWMS Management and Operating Contractor (M and O) and the following portions of the PDD constitute the Technical Design Baseline for the MGR: the design characteristics listed in Table 1-1, the MGR Architecture (Section 4.1), the Technical Requirements (Section 5), and the Controlled Project Assumptions (Section 6).},
doi = {10.2172/837134},
journal = {},
number = ,
volume = ,
place = {United States},
year = {Tue Jan 30 00:00:00 EST 2001},
month = {Tue Jan 30 00:00:00 EST 2001}
}

Technical Report:

Save / Share: