Abstract

The Sub-project W379, ''Spent Nuclear Fuel Canister Storage Building (CSB),'' was established as part of the Spent Nuclear Fuel (SNF) Project. The primary mission of the CSB is to safely store spent nuclear fuel removed from the K Basins in dry storage until such time that it can be transferred to the national geological repository at Yucca Mountain Nevada. This sub-project was initiated in late 1994 by a series of studies and conceptual designs. These studies determined that the partially constructed storage building, originally built as part of the Hanford Waste Vitrification Plant (HWVP) Project, could be redesigned to safely store the spent nuclear fuel. The scope of the CSB facility initially included a receiving station, a hot conditioning system, a storage vault, and a Multi-Canister Overpack (MCO) Handling Machine (MHM). Because of evolution of the project technical strategy, the hot conditioning system was deleted from the scope and MCO welding and sampling stations were added in its place. This report outlines the methods, procedures, and outputs developed by Project W379 to verify that the provided Structures, Systems, and Components (SSCs): satisfy the design requirements and acceptance criteria; perform their intended function; ensure that failure modes and hazards have beenmore » addressed in the design; and ensure that the SSCs as installed will not adversely impact other SSCs. The original version of this document was prepared by Vista Engineering for the SNF Project. Revision 1 documented verification actions that were pending at the time the initial report was prepared. Revision 3 of this document incorporates MCO Cover Cap Assembly welding verification activities. Verification activities for the installed and operational SSCs have been completed.« less

Authors:
Publication Date:
Research Org.:
NHC (US)
Sponsoring Org.:
USDOE Office of Environmental Management (EM) (US)
OSTI Identifier:
836357
Report Number(s):
SNF-6442, Rev.3
DE-AC06-96RL13200; TRN: US0500702
DOE Contract Number:  
AC06-96RL13200
Resource Type:
Technical Report
Resource Relation:
Other Information: PBD: 12 Feb 2003
Country of Publication:
United States
Language:
English
Subject:
12 MANAGEMENT OF RADIOACTIVE WASTES, AND NON-RADIOACTIVE WASTES FROM NUCLEAR FACILITIES; 11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS; CONTAINERS; DESIGN; DRY STORAGE; NUCLEAR FUELS; SAMPLING; STORAGE; VERIFICATION; VITRIFICATION; WASTES; WELDING; YUCCA MOUNTAIN

Citation Formats

BAZINET, G.D. DESIGN VERIFICATION REPORT SPENT NUCLEAR FUEL (SNF) PROJECT CANISTER STORAGE BUILDING (CSB). United States: N. p., 2003. Web. doi:10.2172/836357.
BAZINET, G.D. DESIGN VERIFICATION REPORT SPENT NUCLEAR FUEL (SNF) PROJECT CANISTER STORAGE BUILDING (CSB). United States. doi:10.2172/836357.
BAZINET, G.D. Wed . "DESIGN VERIFICATION REPORT SPENT NUCLEAR FUEL (SNF) PROJECT CANISTER STORAGE BUILDING (CSB)". United States. doi:10.2172/836357. https://www.osti.gov/servlets/purl/836357.
@article{osti_836357,
title = {DESIGN VERIFICATION REPORT SPENT NUCLEAR FUEL (SNF) PROJECT CANISTER STORAGE BUILDING (CSB)},
author = {BAZINET, G.D.},
abstractNote = {The Sub-project W379, ''Spent Nuclear Fuel Canister Storage Building (CSB),'' was established as part of the Spent Nuclear Fuel (SNF) Project. The primary mission of the CSB is to safely store spent nuclear fuel removed from the K Basins in dry storage until such time that it can be transferred to the national geological repository at Yucca Mountain Nevada. This sub-project was initiated in late 1994 by a series of studies and conceptual designs. These studies determined that the partially constructed storage building, originally built as part of the Hanford Waste Vitrification Plant (HWVP) Project, could be redesigned to safely store the spent nuclear fuel. The scope of the CSB facility initially included a receiving station, a hot conditioning system, a storage vault, and a Multi-Canister Overpack (MCO) Handling Machine (MHM). Because of evolution of the project technical strategy, the hot conditioning system was deleted from the scope and MCO welding and sampling stations were added in its place. This report outlines the methods, procedures, and outputs developed by Project W379 to verify that the provided Structures, Systems, and Components (SSCs): satisfy the design requirements and acceptance criteria; perform their intended function; ensure that failure modes and hazards have been addressed in the design; and ensure that the SSCs as installed will not adversely impact other SSCs. The original version of this document was prepared by Vista Engineering for the SNF Project. Revision 1 documented verification actions that were pending at the time the initial report was prepared. Revision 3 of this document incorporates MCO Cover Cap Assembly welding verification activities. Verification activities for the installed and operational SSCs have been completed.},
doi = {10.2172/836357},
journal = {},
number = ,
volume = ,
place = {United States},
year = {2003},
month = {2}
}