Title: UPGRADE OF INSTRUMENTATION FOR PURDUE REACTOR PUR-1, PHASE 3

Abstract

The major objective of this program is to upgrade and replace instruments and equipment that significantly improve the performance, control and operational capability of the Purdue University nuclear reactor (PUR-1). Under this major objective one project on design and installation of interface cards for channel four detector was considered. This report is the final report and gives the efforts and progress achieved on these projects from August 2002 to July 2004.

Authors:
Publication Date:
Research Org.:
School of Nuclear Engineering, Purdue University (US)
Sponsoring Org.:
USDOE Office of Nuclear Energy, Science and Technology (NE) (US)
OSTI Identifier:
833799
Report Number(s):
DOE/FG/14303
PU/NE-04-14; TRN: US0406921
DOE Contract Number:  
FG07-02ID14303
Resource Type:
Technical Report
Resource Relation:
Other Information: PBD: 24 Sep 2004
Country of Publication:
United States
Language:
English
Subject:
21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS; 46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND TECHNOLOGY; DESIGN; PERFORMANCE; REACTORS; EQUIPMENT; PURDUE REACTOR, INSTRUMENTATION UPGRADE, TRAINING REACTOR

Citation Formats

Revankar, S T. UPGRADE OF INSTRUMENTATION FOR PURDUE REACTOR PUR-1, PHASE 3. United States: N. p., 2004. Web. doi:10.2172/833799.
Revankar, S T. UPGRADE OF INSTRUMENTATION FOR PURDUE REACTOR PUR-1, PHASE 3. United States. https://doi.org/10.2172/833799
Revankar, S T. 2004. "UPGRADE OF INSTRUMENTATION FOR PURDUE REACTOR PUR-1, PHASE 3". United States. https://doi.org/10.2172/833799. https://www.osti.gov/servlets/purl/833799.
@article{osti_833799,
title = {UPGRADE OF INSTRUMENTATION FOR PURDUE REACTOR PUR-1, PHASE 3},
author = {Revankar, S T},
abstractNote = {The major objective of this program is to upgrade and replace instruments and equipment that significantly improve the performance, control and operational capability of the Purdue University nuclear reactor (PUR-1). Under this major objective one project on design and installation of interface cards for channel four detector was considered. This report is the final report and gives the efforts and progress achieved on these projects from August 2002 to July 2004.},
doi = {10.2172/833799},
url = {https://www.osti.gov/biblio/833799}, journal = {},
number = ,
volume = ,
place = {United States},
year = {Fri Sep 24 00:00:00 EDT 2004},
month = {Fri Sep 24 00:00:00 EDT 2004}
}