Title: Strategic Basis for License Application Planning for a Potential Yucca Mountain Repository

Abstract

If Yucca Mountain, Nevada is designated as the site for development of a geologic repository for disposal of spent nuclear fuel and high-level radioactive waste, the Department of Energy (DOE) must obtain Nuclear Regulatory Commission (NRC) approval first for repository construction, then for an operating license, and, eventually, for repository closure and decommissioning. The licensing criteria defined in Code of Federal Regulations, Title 10, Part 63 (10 CFR Part 63) establish the basis for these NRC decisions. Submittal of a license application (LA) to the NRC for authorization to construct a repository at the Yucca Mountain site is, at this point, only a potential future action by the DOE. The policy process defined in the Nuclear Waste Policy Act (NWPA), as amended, for recommendation and designation of Yucca Mountain as a repository site makes it difficult to predict whether or when the site might be designated. The DOE may only submit a LA to the NRC if the site designation takes effect. In spite of this uncertainty, the DOE must take prudent and appropriate action now, and over the next several years, to prepare for development and timely submittal of a LA. This is particularly true given the need formore » the DOE to develop, load, and certify the operation of its electronic information system to provide access to its relevant records as part of the licensing support network (LSN) in compliance with NRC requirements six months prior to LA submittal. The DOE must also develop a LA, which is a substantially different document from those developed to support a Site Recommendation (SR) decision. The LA must satisfy NRC licensing criteria and content requirements, and address the acceptance criteria defined by the NRC in its forthcoming Yucca Mountain Review Plan (YMRP). The content of the LA must be adequate to facilitate NRC acceptance and docketing for review, and the LA and its supporting documents must provide the documented basis for the NR C findings required for a construction authorization. The LA must also support a licensing proceeding before an Atomic Safety and Licensing Board panel prior to NRC action on any decision to authorize construction. The DOE has established a strategic basis for planning that is intended to provide the framework for development of an integrated plan for activities leading to preparation and submittal of a LA.« less

Authors:
; ; ; ;
Publication Date:
Research Org.:
U. S. Department of Energy, Yucca Mountain Site Characterization Office P.O. Box 364629, M/S 523, N. Las Vegas, NV (US); Booz Allen Hamilton, Inc. 1551 Hillshire Drive, M/S 471, Las Vegas, NV (US)
Sponsoring Org.:
USDOE Office of Civilian Radioactive Waste Management (RW) (US)
OSTI Identifier:
830023
Resource Type:
Conference
Resource Relation:
Conference: Waste Management 2002 Symposium, Tucson, AZ (US), 02/24/2002--02/28/2002; Other Information: PBD: 26 Feb 2002
Country of Publication:
United States
Language:
English
Subject:
12 MANAGEMENT OF RADIOACTIVE WASTES, AND NON-RADIOACTIVE WASTES FROM NUCLEAR FACILITIES; 11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS; 29 ENERGY PLANNING, POLICY AND ECONOMY; CLOSURES; COMPLIANCE; CONSTRUCTION; DECOMMISSIONING; HIGH-LEVEL RADIOACTIVE WASTES; INFORMATION SYSTEMS; LICENSE APPLICATIONS; LICENSING; NUCLEAR FUELS; NUCLEAR WASTE POLICY ACTS; OPERATING LICENSES; REGULATIONS; SAFETY; WASTE MANAGEMENT; YUCCA MOUNTAIN

Citation Formats

Newberry, C. M., Brocoum, S. J., Gamble, R. P., Murray, R. C., and Cline, M. Strategic Basis for License Application Planning for a Potential Yucca Mountain Repository. United States: N. p., 2002. Web.
Newberry, C. M., Brocoum, S. J., Gamble, R. P., Murray, R. C., & Cline, M. Strategic Basis for License Application Planning for a Potential Yucca Mountain Repository. United States.
Newberry, C. M., Brocoum, S. J., Gamble, R. P., Murray, R. C., and Cline, M. Tue . "Strategic Basis for License Application Planning for a Potential Yucca Mountain Repository". United States. https://www.osti.gov/servlets/purl/830023.
@article{osti_830023,
title = {Strategic Basis for License Application Planning for a Potential Yucca Mountain Repository},
author = {Newberry, C. M. and Brocoum, S. J. and Gamble, R. P. and Murray, R. C. and Cline, M.},
abstractNote = {If Yucca Mountain, Nevada is designated as the site for development of a geologic repository for disposal of spent nuclear fuel and high-level radioactive waste, the Department of Energy (DOE) must obtain Nuclear Regulatory Commission (NRC) approval first for repository construction, then for an operating license, and, eventually, for repository closure and decommissioning. The licensing criteria defined in Code of Federal Regulations, Title 10, Part 63 (10 CFR Part 63) establish the basis for these NRC decisions. Submittal of a license application (LA) to the NRC for authorization to construct a repository at the Yucca Mountain site is, at this point, only a potential future action by the DOE. The policy process defined in the Nuclear Waste Policy Act (NWPA), as amended, for recommendation and designation of Yucca Mountain as a repository site makes it difficult to predict whether or when the site might be designated. The DOE may only submit a LA to the NRC if the site designation takes effect. In spite of this uncertainty, the DOE must take prudent and appropriate action now, and over the next several years, to prepare for development and timely submittal of a LA. This is particularly true given the need for the DOE to develop, load, and certify the operation of its electronic information system to provide access to its relevant records as part of the licensing support network (LSN) in compliance with NRC requirements six months prior to LA submittal. The DOE must also develop a LA, which is a substantially different document from those developed to support a Site Recommendation (SR) decision. The LA must satisfy NRC licensing criteria and content requirements, and address the acceptance criteria defined by the NRC in its forthcoming Yucca Mountain Review Plan (YMRP). The content of the LA must be adequate to facilitate NRC acceptance and docketing for review, and the LA and its supporting documents must provide the documented basis for the NR C findings required for a construction authorization. The LA must also support a licensing proceeding before an Atomic Safety and Licensing Board panel prior to NRC action on any decision to authorize construction. The DOE has established a strategic basis for planning that is intended to provide the framework for development of an integrated plan for activities leading to preparation and submittal of a LA.},
doi = {},
journal = {},
number = ,
volume = ,
place = {United States},
year = {2002},
month = {2}
}

Conference:
Other availability
Please see Document Availability for additional information on obtaining the full-text document. Library patrons may search WorldCat to identify libraries that hold this conference proceeding.

Save / Share: