skip to main content
OSTI.GOV title logo U.S. Department of Energy
Office of Scientific and Technical Information

Title: Using FEP's List and a PA Methodology for Evaluating Suitable Areas for the LLW Repository in Italy

Abstract

In Italy following a referendum held in 1987, nuclear energy has been phased out. Since 1998, a general site selection process covering the whole Italian territory has been under way. A GIS (Geographic Information System) methodology was implemented in three steps using the ESRI Arc/Info and Arc/View platforms. The screening identified approximately 0.8% of the Italian territory as suitable for locating the LLW Repository. 200 areas have been identified as suitable for the location of the LLW Repository, using a multiple exclusion criteria procedure (1:500,000), regional scale (1:100.000) and local scale (1:25,000-1:10,000). A methodology for evaluating these areas has been developed allowing, along with the evaluation of the long term efficiency of the engineered barrier system (EBS), the characterization of the selected areas in terms of physical and safety factors and planning factors. The first step was to identify, on a referenced FEPs list, a group of geomorphological, geological, hydrogeological, climatic and human behavior caused process and/or events, which were considered of importance for the site evaluation, taking into account the Italian situation. A site evaluation system was established ascribing weighted scores to each of these processes and events, which were identified as parameters of the new evaluation system. Themore » score of each parameter is ranging from 1 (low suitability) to 3 (high suitability). The corresponding weight is calculated considering the effect of the parameter in terms of total dose to the critical group, using an upgraded AMBER model for PA calculation. At the end of the process an index obtained by a score weighted sum gives the degree of suitability of the selected areas for the LLW Repository location. The application of the methodology to two selected sites is given in the paper.« less

Authors:
; ;
Publication Date:
Research Org.:
ENEA, The National Agency for Energy, New Technologies and Environment (US)
Sponsoring Org.:
none (US)
OSTI Identifier:
828928
Resource Type:
Conference
Resource Relation:
Conference: Waste Management 2002 Symposium, Tucson, AZ (US), 02/24/2002--02/28/2002; Other Information: PBD: 26 Feb 2002
Country of Publication:
United States
Language:
English
Subject:
12 MANAGEMENT OF RADIOACTIVE WASTES, AND NON-RADIOACTIVE WASTES FROM NUCLEAR FACILITIES; 29 ENERGY PLANNING, POLICY AND ECONOMY; AMBER; EFFICIENCY; EVALUATION; INFORMATION SYSTEMS; NUCLEAR ENERGY; PLANNING; SAFETY; SITE SELECTION; WASTE MANAGEMENT

Citation Formats

Risoluti, P., Ciabatti, P., and Mingrone, G. Using FEP's List and a PA Methodology for Evaluating Suitable Areas for the LLW Repository in Italy. United States: N. p., 2002. Web.
Risoluti, P., Ciabatti, P., & Mingrone, G. Using FEP's List and a PA Methodology for Evaluating Suitable Areas for the LLW Repository in Italy. United States.
Risoluti, P., Ciabatti, P., and Mingrone, G. Tue . "Using FEP's List and a PA Methodology for Evaluating Suitable Areas for the LLW Repository in Italy". United States. https://www.osti.gov/servlets/purl/828928.
@article{osti_828928,
title = {Using FEP's List and a PA Methodology for Evaluating Suitable Areas for the LLW Repository in Italy},
author = {Risoluti, P. and Ciabatti, P. and Mingrone, G.},
abstractNote = {In Italy following a referendum held in 1987, nuclear energy has been phased out. Since 1998, a general site selection process covering the whole Italian territory has been under way. A GIS (Geographic Information System) methodology was implemented in three steps using the ESRI Arc/Info and Arc/View platforms. The screening identified approximately 0.8% of the Italian territory as suitable for locating the LLW Repository. 200 areas have been identified as suitable for the location of the LLW Repository, using a multiple exclusion criteria procedure (1:500,000), regional scale (1:100.000) and local scale (1:25,000-1:10,000). A methodology for evaluating these areas has been developed allowing, along with the evaluation of the long term efficiency of the engineered barrier system (EBS), the characterization of the selected areas in terms of physical and safety factors and planning factors. The first step was to identify, on a referenced FEPs list, a group of geomorphological, geological, hydrogeological, climatic and human behavior caused process and/or events, which were considered of importance for the site evaluation, taking into account the Italian situation. A site evaluation system was established ascribing weighted scores to each of these processes and events, which were identified as parameters of the new evaluation system. The score of each parameter is ranging from 1 (low suitability) to 3 (high suitability). The corresponding weight is calculated considering the effect of the parameter in terms of total dose to the critical group, using an upgraded AMBER model for PA calculation. At the end of the process an index obtained by a score weighted sum gives the degree of suitability of the selected areas for the LLW Repository location. The application of the methodology to two selected sites is given in the paper.},
doi = {},
journal = {},
number = ,
volume = ,
place = {United States},
year = {Tue Feb 26 00:00:00 EST 2002},
month = {Tue Feb 26 00:00:00 EST 2002}
}

Conference:
Other availability
Please see Document Availability for additional information on obtaining the full-text document. Library patrons may search WorldCat to identify libraries that hold this conference proceeding.

Save / Share: