NLC Reliability Analysis Notes: Klystron-Modulator System (LCC-0029)
This paper address the reliability and availability issues to be faced in deploying and operating the klystron modulator assemblies proposed for the Next Linear Collider (NLC). The rf power sources are a major system of the NLC and require a high uptime in order to reach the goal of 0.85 availability. Since the NLC is made up of several systems, not just klystron-modulator assemblies, the availability goal for the assemblies must be higher than 0.85. Currently this goal is at least 0.95. This short paper summarizes the analysis currently under way to determine whether the design of the rf power system will meet the design availability goal.
- Research Organization:
- SLAC National Accelerator Lab., Menlo Park, CA (United States)
- Sponsoring Organization:
- USDOE Office of Science (US)
- DOE Contract Number:
- AC03-76SF00515
- OSTI ID:
- 826835
- Report Number(s):
- SLAC-TN-04-015; TRN: US0404229
- Resource Relation:
- Other Information: PBD: 23 Mar 2004
- Country of Publication:
- United States
- Language:
- English
Similar Records
Analyses of Klystron Modulator Approaches for NLC
Design Optimization and Construction of the Thyratron/PFN Based Cost Model Modulator for the NLC
The Next Linear Collider Klystron Development Program
Technical Report
·
Thu Aug 24 00:00:00 EDT 2000
·
OSTI ID:826835
Design Optimization and Construction of the Thyratron/PFN Based Cost Model Modulator for the NLC
Technical Report
·
Mon Mar 15 00:00:00 EST 1999
·
OSTI ID:826835
The Next Linear Collider Klystron Development Program
Technical Report
·
Wed Jun 21 00:00:00 EDT 2000
·
OSTI ID:826835