Title: Supporting Fernald Site Closure with Integrated Health and Safety Plans as Documented Safety Analyses

Conference ·
OSTI ID:824890

At the Fernald Closure Project (FCP) near Cincinnati, Ohio, environmental restoration activities are supported by Documented Safety Analyses (DSAs) that combine the required project-specific Health and Safety Plans, Safety Basis Requirements (SBRs), and Process Requirements (PRs) into single Integrated Health and Safety Plans (I-HASPs). These integrated DSAs employ Integrated Safety Management methodology in support of simplified restoration and remediation activities that, so far, have resulted in the decontamination and demolition (D&D) of over 200 structures, including eight major nuclear production plants. There is one of twelve nuclear facilities still remaining (Silos containing uranium ore residues) with its own safety basis documentation. This paper presents the status of the FCP's safety basis documentation program, illustrating that all of the former nuclear facilities and activities have now replaced. Basis of Interim Operations (BIOs) with I-HASPs as their safety basis during the closure process.

Research Organization:
Fluor Fernald, Inc. (US)
Sponsoring Organization:
US DOE (US)
DOE Contract Number:
AC24-01OH20115
OSTI ID:
824890
Report Number(s):
FEMP-2608; TRN: US0500695
Resource Relation:
Conference: DSA - Lessons Learned, Feedback and Improvement, San Francisco, CA (US), 05/01/2004--05/06/2004; Other Information: PBD: 1 Mar 2004
Country of Publication:
United States
Language:
English