This is the first quarterly progress report for Year 2 of the ACTS project. It includes a review of progress made in Flow Loop development and research during the period of time between July 14, 2000 and September 30, 2000. This report presents information on the following specific tasks: (a) Progress in Advanced Cuttings Transport Facility design and development (Task 2), (b) Progress on research project (Task 8): ''Study of Flow of Synthetic Drilling Fluids Under Elevated Pressure and Temperature Conditions'', (c) Progress on research project (Task 6): ''Study of Cuttings Transport with Foam Under LPAT Conditions (Joint Project with TUDRP)'', (d) Progress on research project (Task 7): ''Study of Cuttings Transport with Aerated Muds Under LPAT Conditions (Joint Project with TUDRP)'', (e) Progress on research project (Task 9): ''Study of Foam Flow Behavior Under EPET Conditions'', (f) Initiate research on project (Task 10): ''Study of Cuttings Transport with Aerated Mud Under Elevated Pressure and Temperature Conditions'', (g) Progress on instrumentation tasks to measure: Cuttings concentration and distribution (Tasks 11), and Foam properties (Task 12), (h) Initiate a comprehensive safety review of all flow-loop components and operational procedures. Since the previous Task 1 has been completed, we will now designatemore » this new task as: (Task 1S). (i) Activities towards technology transfer and developing contacts with Petroleum and service company members, and increasing the number of JIP members.« less

Authors:
; ; ; ; ; ; ; ; ; ; ;
Publication Date:
Research Org.:
The University of Tulsa (US)
Sponsoring Org.:
(US)
OSTI Identifier:
822104
DOE Contract Number:
FG26-99BC15178
Resource Type:
Technical Report
Resource Relation:
Other Information: PBD: 30 Oct 2000
Country of Publication:
United States
Language:
English
Subject:
02 PETROLEUM; DESIGN; DISTRIBUTION; DRILLING FLUIDS; PETROLEUM; PROGRESS REPORT; SAFETY; TECHNOLOGY TRANSFER; TRANSPORT

Citation Formats

Troy Reed, Stefan Miska, Nicholas Takach, Kaveh Ashenayi, Gerald Kane, Mark Pickell, Len Volk, Mike Volk, Barkim Demirdal, Affonso Lourenco, Evren Ozbayoglu, and Paco Vieira. ADVANCED CUTTINGS TRANSPORT STUDY. United States: N. p., 2000. Web. doi:10.2172/822104.
Troy Reed, Stefan Miska, Nicholas Takach, Kaveh Ashenayi, Gerald Kane, Mark Pickell, Len Volk, Mike Volk, Barkim Demirdal, Affonso Lourenco, Evren Ozbayoglu, & Paco Vieira. ADVANCED CUTTINGS TRANSPORT STUDY. United States. doi:10.2172/822104.
Troy Reed, Stefan Miska, Nicholas Takach, Kaveh Ashenayi, Gerald Kane, Mark Pickell, Len Volk, Mike Volk, Barkim Demirdal, Affonso Lourenco, Evren Ozbayoglu, and Paco Vieira. 2000. "ADVANCED CUTTINGS TRANSPORT STUDY". United States. doi:10.2172/822104. https://www.osti.gov/servlets/purl/822104.
@article{osti_822104,
title = {ADVANCED CUTTINGS TRANSPORT STUDY},
author = {Troy Reed and Stefan Miska and Nicholas Takach and Kaveh Ashenayi and Gerald Kane and Mark Pickell and Len Volk and Mike Volk and Barkim Demirdal and Affonso Lourenco and Evren Ozbayoglu and Paco Vieira},
abstractNote = {This is the first quarterly progress report for Year 2 of the ACTS project. It includes a review of progress made in Flow Loop development and research during the period of time between July 14, 2000 and September 30, 2000. This report presents information on the following specific tasks: (a) Progress in Advanced Cuttings Transport Facility design and development (Task 2), (b) Progress on research project (Task 8): ''Study of Flow of Synthetic Drilling Fluids Under Elevated Pressure and Temperature Conditions'', (c) Progress on research project (Task 6): ''Study of Cuttings Transport with Foam Under LPAT Conditions (Joint Project with TUDRP)'', (d) Progress on research project (Task 7): ''Study of Cuttings Transport with Aerated Muds Under LPAT Conditions (Joint Project with TUDRP)'', (e) Progress on research project (Task 9): ''Study of Foam Flow Behavior Under EPET Conditions'', (f) Initiate research on project (Task 10): ''Study of Cuttings Transport with Aerated Mud Under Elevated Pressure and Temperature Conditions'', (g) Progress on instrumentation tasks to measure: Cuttings concentration and distribution (Tasks 11), and Foam properties (Task 12), (h) Initiate a comprehensive safety review of all flow-loop components and operational procedures. Since the previous Task 1 has been completed, we will now designate this new task as: (Task 1S). (i) Activities towards technology transfer and developing contacts with Petroleum and service company members, and increasing the number of JIP members.},
doi = {10.2172/822104},
journal = {},
number = ,
volume = ,
place = {United States},
year = 2000,
month =
}

Technical Report:

Save / Share:
  • This is the third quarterly progress report for Year 3 of the ACTS Project. It includes a review of progress made in: (1) Flow Loop construction and development and (2) research tasks during the period of time between Jan. 1, 2002 and Mar. 31, 2002. This report presents a review of progress on the following specific tasks: (a) Design and development of an Advanced Cuttings Transport Facility (Task 3: Addition of a Cuttings Injection/Separation System), (b) Research project (Task 6): ''Study of Cuttings Transport with Foam Under LPAT Conditions (Joint Project with TUDRP)'', (c) Research project (Task 9b): ''Study ofmore » Foam Flow Behavior Under EPET Conditions'', (d) Research project (Task 10): ''Study of Cuttings Transport with Aerated Mud Under Elevated Pressure and Temperature Conditions'', (e) Research on three instrumentation tasks to measure: Cuttings concentration and distribution in a flowing slurry (Task 11), Foam texture while transporting cuttings. (Task 12), and Viscosity of Foam under EPET (Task 9b); (f) Development of a Safety program for the ACTS Flow Loop, progress on a comprehensive safety review of all flow-loop components and operational procedures. (Task 1S); and (g) Activities towards technology transfer and developing contacts with Petroleum and service company members, and increasing the number of JIP members.« less
  • This is the fourth quarterly progress report for Year-3 of the ACTS Project. It includes a review of progress made in: (1) Flow Loop construction and development and (2) research tasks during the period of time between April 1, 2002 and June 30, 2002. This report presents a review of progress on the following specific tasks: (a) Design and development of an Advanced Cuttings Transport Facility (Task 3: Addition of a Cuttings Injection/Separation System), (b) Research project (Task 6): ''Study of Cuttings Transport with Foam Under LPAT Conditions (Joint Project with TUDRP)''; (c) Research project (Task 9b): ''Study of Foammore » Flow Behavior Under EPET Conditions''; (d) Research project (Task 10): ''Study of Cuttings Transport with Aerated Mud Under Elevated Pressure and Temperature Conditions''; (e) Research on three instrumentation tasks to measure: Cuttings concentration and distribution in a flowing slurry (Task 11), Foam texture while transporting cuttings. (Task 12), and Viscosity of Foam under EPET (Task 9b); (f) Development of a Safety program for the ACTS Flow Loop. Progress on a comprehensive safety review of all flow-loop components and operational procedures. (Task 1S); (g) Activities towards technology transfer and developing contacts with Petroleum and service company members, and increasing the number of JIP members.« less
  • This is the first quarterly progress report for Year-4 of the ACTS Project. It includes a review of progress made in: (1) Flow Loop construction and development and (2) research tasks during the period of time between July 1, 2002 and Sept. 30, 2002. This report presents a review of progress on the following specific tasks: (a) Design and development of an Advanced Cuttings Transport Facility Task 3: Addition of a Cuttings Injection/Separation System, Task 4: Addition of a Pipe Rotation System, (b) New Research project (Task 9b): ''Development of a Foam Generator/Viscometer for Elevated Pressure and Elevated Temperature (EPET)more » Conditions'', (d) Research project (Task 10): ''Study of Cuttings Transport with Aerated Mud Under Elevated Pressure and Temperature Conditions'', (e) Research on three instrumentation tasks to measure: Cuttings concentration and distribution in a flowing slurry (Task 11), Foam texture while transporting cuttings (Task 12), Viscosity of Foam under EPET (Task 9b). (f) Development of a Safety program for the ACTS Flow Loop. Progress on a comprehensive safety review of all flow-loop components and operational procedures. (Task 1S). (g) Activities towards technology transfer and developing contacts with Petroleum and service company members, and increasing the number of JIP members.« less
  • This is the second quarterly progress report for Year-4 of the ACTS Project. It includes a review of progress made in: (1) Flow Loop construction and development and (2) research tasks during the period of time between October 1, 2002 and December 30, 2002. This report presents a review of progress on the following specific tasks. (a) Design and development of an Advanced Cuttings Transport Facility Task 3: Addition of a Cuttings Injection/Separation System, Task 4: Addition of a Pipe Rotation System. (b) New research project (Task 9b): ''Development of a Foam Generator/Viscometer for Elevated Pressure and Elevated Temperature (EPET)more » Conditions''. (d) Research project (Task 10): ''Study of Cuttings Transport with Aerated Mud Under Elevated Pressure and Temperature Conditions''. (e) Research on three instrumentation tasks to measure: Cuttings concentration and distribution in a flowing slurry (Task 11), Foam texture while transporting cuttings. (Task 12), and Viscosity of Foam under EPET (Task 9b). (f) New Research project (Task 13): ''Study of Cuttings Transport with Foam under Elevated Pressure and Temperature Conditions''. (g) Development of a Safety program for the ACTS Flow Loop. Progress on a comprehensive safety review of all flow-loop components and operational procedures. (Task 1S). (h) Activities towards technology transfer and developing contacts with Petroleum and service company members, and increasing the number of JIP members.« less
  • ACTS flow loop is now operational under elevated pressure and temperature. Currently, experiments with water under pressure and temperature are being conducted. Based on the analysis of Fann 70 data, empirical correlations defining the shear stress as a function of temperature, pressure and the shear rate have been developed for Petrobras synthetic drilling fluids. PVT equipment has been modified for testing Synthetic drilling fluids. Initial calibration tests have been conducted by using water. Currently, the base oil of the Petrobras synthetic drilling fluid is being tested. Foam flow experiments have been conducted. Currently, more experiments are being conducted while datamore » are being analyzed to characterize the rheology of the foam. Cuttings transport experiments have been conducted using air, water and cuttings. Preliminary results have shown that it may not be possible to avoid cuttings bed deposition under any practical combination of air and water flow rates. Foam stability analyses have been conducted. Effects of salt and oil concentration on the foam stability have been investigated. A software for controlling the data sampling and data storage during cuttings monitoring process have been developed.« less