Title: DIRECT FUEL CELL/TURBINE POWER PLANT

Abstract

In this reporting period, a milestone was achieved by commencement of testing and operation of the sub-scale hybrid direct fuel cell/turbine (DFC/T{reg_sign}) power plant. The operation was initiated subsequent to the completion of the construction of the balance-of-plant (BOP) and implementation of process and control tests of the BOP for the subscale DFC/T hybrid system. The construction efforts consisted of finishing the power plant insulation and completion of the plant instrumentation including the wiring and tubing required for process measurement and control. The preparation work also included the development of procedures for facility shake down, conditioning and load testing of the fuel cell, integration of the microturbine, and fuel cell/gas turbine load tests. At conclusion of the construction, the process and control (PAC) tests of BOP, including the microturbine, were initiated.

Authors:
Publication Date:
Research Org.:
FuelCell Energy, Inc. (US)
Sponsoring Org.:
(US)
OSTI Identifier:
821188
DOE Contract Number:  
FC26-00NT40798
Resource Type:
Technical Report
Resource Relation:
Other Information: PBD: 23 May 2003
Country of Publication:
United States
Language:
English
Subject:
30 DIRECT ENERGY CONVERSION; CONSTRUCTION; FUEL CELLS; HYBRID SYSTEMS; IMPLEMENTATION; POWER PLANTS; TESTING; TURBINES

Citation Formats

Ghezel-Ayagh, Hossein. DIRECT FUEL CELL/TURBINE POWER PLANT. United States: N. p., 2003. Web. doi:10.2172/821188.
Ghezel-Ayagh, Hossein. DIRECT FUEL CELL/TURBINE POWER PLANT. United States. https://doi.org/10.2172/821188
Ghezel-Ayagh, Hossein. 2003. "DIRECT FUEL CELL/TURBINE POWER PLANT". United States. https://doi.org/10.2172/821188. https://www.osti.gov/servlets/purl/821188.
@article{osti_821188,
title = {DIRECT FUEL CELL/TURBINE POWER PLANT},
author = {Ghezel-Ayagh, Hossein},
abstractNote = {In this reporting period, a milestone was achieved by commencement of testing and operation of the sub-scale hybrid direct fuel cell/turbine (DFC/T{reg_sign}) power plant. The operation was initiated subsequent to the completion of the construction of the balance-of-plant (BOP) and implementation of process and control tests of the BOP for the subscale DFC/T hybrid system. The construction efforts consisted of finishing the power plant insulation and completion of the plant instrumentation including the wiring and tubing required for process measurement and control. The preparation work also included the development of procedures for facility shake down, conditioning and load testing of the fuel cell, integration of the microturbine, and fuel cell/gas turbine load tests. At conclusion of the construction, the process and control (PAC) tests of BOP, including the microturbine, were initiated.},
doi = {10.2172/821188},
url = {https://www.osti.gov/biblio/821188}, journal = {},
number = ,
volume = ,
place = {United States},
year = {2003},
month = {5}
}